Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Crushing and grinding at Bond Gold’s Colosseum mine : An updateBy R. L. Beatty
Bond International Gold's Colosseum gold mine was discovered in 1865. No recorded production occurred, however, until the 1930s, with production of about 19 kg (615 oz) of gold. The mine was clos
Jan 1, 1989
-
Technological Evaluation Of Monohydrate BauxitesBy Péter Siklósi, János Zámbó, Károly Solymár
It is fundamentally important to evaluate bauxites in a realistic, commercial way on the basis of the processing technology both for the supply of existing alumina plants and for the designing of new
Jan 1, 1984
-
Analytical method for predicting filling rates of mining pit lakes: example from the Getchell Mine, NevadaBy L. Shevenell
Nevada now has, or will have, 35 pit lakes resulting from open-pit mining below the water table. State regulators are requiring that the ultimate pit lake water quality be predicted as part of the per
Jan 1, 2000
-
Control of Blasting for Ore Blending and Autogenous Mill Performance at Hibbing Taconite Company- Preliminary FindingsBy Jack W. Eloranta, Michael J. T. Orobona, Peter R. VanDelinder
Ore blending for process optimization is becoming an increasing factor for managing cost and productivity. Economic mining and processing a very low value ore in an extremely competitive market result
Jan 1, 2004
-
Review Of Thermally Stable Diamond (TSD) Rock Drilling BitsBy A. Ersoy, M. D. Waller
Because of a shortage of diamonds for the drilling industry in the 1970s, efforts were made to develop synthetic diamonds. The resulting development of polycrystalline diamond compacts (PDC) enabled t
Jan 1, 1998
-
Equivalency Tests Of Fire Detection Systems For Underground Coal Mines Using Low Level Carbon Monoxide MonitorsBy E. J. Miller
The Ventilation Branch is engaged in a project to determine if low level carbon monoxide monitors used for early detection and warning of fire in a coal mine conveyor belt entry can provide protection
Jan 1, 1980
-
Comparison Of Cyclones And Underflow-Regulated Cyclones For Fines Removal From Wastewater In Industrial Sand ProductionBy Scott Brien, O&apos
Cyclones have become standard unit operations in mineral processing for both dewatering mineral slurries and for making separations at given particle sizes. Conventional cyclones are normally able to
Jan 1, 1997
-
Encore - A Computer Program For Drill-Hole Data Management, Coal Orebody Modeling, And Coal Reserve EstimationBy Patrick A. Ley
Maintaining, managing and manipulating large quantities of geologic data can be a very costly and time-consuming process. The use of computer-based methods can provide some relief to the problems of e
Jan 1, 1982
-
Coal Blending – Meeting SpecificationBy B. J. Arnold
Coal blending inherently means homogenizing a mixture of coals so that the properties of the blend meet some specifications for maintaining power plant performance and emission requirements. In practi
Jan 1, 1994
-
Nodule distribution characteristics and associated seafloor features: Factors for exploitation of deep-sea Fe-Mn depositsBy R. Sharma
The heterogeneous distributions of nodule sizes, cover-ages and abundances and the variability of their burial und association with sediments and rock outcrops on the seafloor have emerged as crucial
Jan 1, 1999
-
Blast Parameters for the Nagagami Hydro-Electric Project Tailrace Plug Blast, Utilizing Long Round Jumbo TechnologyBy Joseph Keenan
In March of 1994, Dynatec Mining Limited entered into a contract with PCL Civil Constructors to carry out the underground excavations for the Algonquin Power Corporation’s15 Megawatt Nagagami hydro-el
Jan 1, 1997
-
Laboratory And Field Evaluation Of Dust Collector Bags For Reducing Dust Exposure Of Roof Bolter OperatorsThe National Institute for Occupational Safety and Health (NIOSH) conducratory and field tests to evaluate the effectiveness of dust collector bags for reducing dust liberation and operator exposure f
Jan 1, 2008
-
A Simple Unsupervised Classification Workflow for Defining Geological Domains Using Multivariate Data - Mining, Metallurgy & Exploration (2021)By Fouad Faraj, Julian M. Ortiz
Within the natural resource industries, there is an increasing amount of data and number of variables being recorded when sampling a site. This has made multivariate geospatial datasets more difficult
Apr 16, 2021
-
Assessment of Lead Slag Landfill Site and the Use of a Computational Program for Chemical SpeciesBy Joseph Peterson, Alexander May
The Bureau of Mines used geochemical modelling computer programs to characterize a site containing lead slag generated by a lead processing facility. Tests for toxic elements by the U. S. Environmenta
Jan 1, 1991
-
Managing Continuous Improvement Of Mine To Mill Begins With Measurement - SME Annual Meeting 2022By J. Loeb, R. Ramanathan, P. Cameron
All mining operations, including iron ore, maintain a focus of continuous improvement and asset optimisation in their operations. As all the operations in the Mine-to-Mill value chain are inter-depend
Mar 2, 2022
-
Axial Gas Holdup Profiles In The Collection Zones Of Flotation ColumnsBy A. Uribe-Salas, J. A. Finch, B. J. Huls
Gas holdup profiles in the collection zones of a pilot flotation column (0.91 m x 13.5 m) and a laboratory flotation column (0.057 m x 9.5 m) operated with air and water only were determined from pres
Jan 1, 1996
-
Controlled Blasting Methods for Excavation of Rock and Concrete in Critical Locations of Tunnels and ShaftsBy Gordon F. Revey
In underground construction and mining work, situations occasionally occur where hard rock or concrete must be excavated at locations near critical structures or utilities. Fearing damage from blastin
Jan 1, 2001
-
A Review Of Tax Shelter Investments After The Economic Recovery Tax Act Of 1981 - Discussion OutlineBy Herbert P. Haschke
I. Changes made by the Economic Recovery Tax Act of 1981 (ERTA) which have an effect on investing in tax shelter investments A. Maximum ordinary income tax rate on individuals is now 50%. B. Maximum
Jan 1, 1982
-
Contractor’s Redesign of Construction Methods and Proceduresfor New York City Transit Authority Contract C-20201By Bernard A. Grand, Gary A. Almeraris
This project involves the reconstruction of a 1,100 ft. long by 75 ft. wide segment of an existing 4 to 5 track subway under Northern Boulevard in the Borough of Queens in New York City. The project i
Jan 1, 1999
-
Planning the Black Creek Tunnel Project - RETC2023By Cary Hirner, Tony Cicchetti, Daniel G. Cressman, Jeff F. Wallace, Prapan Dave, Malcolm Sheehan
The City of Toronto is currently undertaking the design of the Black Creek Sanitary Trunk Sewer Relief Project. The Project involves the design and construction of approximately 20 kilometers of tunne
Jun 13, 2023