Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
NYE Concentrator ExpansionBy D. Turk, P. Lefebvre, J. Sargent, K. Major
"Stillwater Mining Company recovers platinum and palladium from their Nye Montana operations. Mining first commenced at Nye in 1987 at a milling rate of 455 t/d (500 stpd). The plant was expanded in 1
Jan 1, 2000
-
Treatment of Gold Mill Effluents with Hydrogen Peroxide: Operating Experience and CostsBy A. Griffiths, G. Vickell
"INTRODUCTIONA successful cyanide destruction process has to ensure environmental compliance at reasonable cost. That this is possible with hydrogen peroxide is shown by the fact that over twenty gold
Jan 1, 1989
-
Modified Stability Graph Method with a new Rock Stress FactorThe Stability Graph Method is widely used in Canadian underground hard rock mines for open stope support design and is frequently used in the mine planning phase to assess the viability of stope geome
May 1, 2011
-
Behavior of Iron at the Ambatovy Nickel Operation in MadagascarBy B. Haugrud, E. McConaghy, M. Collins, G. Smith
"Laterite ore processed by the Ambatovy Joint Venture in Madagascar is primarily limonitic in nature, containing about 40 to 45 wt.% Fe and 1.1 wt.% Ni. The process selected for treatment of this ore
Jan 1, 2016
-
Improving Silica Dust Controls for Metal/Nonmetal Mining Operations in the United StatesBy Jay F. Colinet
Researchers at the Pittsburgh Research Laboratory (PRL) of the National Institute for Occupational Safety and Health (NIOSH) work to reduce respirable dust exposures in mining operations. One focus o
May 1, 2007
-
Strategies and innovation in ocean transportationBy H. R. Stoger
"In 1994 world trade grew by 9%, the fastest annual increase since 1976. Dry cargo shipping rates are at an all time high.Panamax size bulk carriers are receiving19 000 US dollars per day for trans At
Jan 1, 1996
-
Reliability and maintainability models for mobile underground haulage equipmentBy L. K. Daneshmend
"Competitive pressures dictate that the mining industry moves to larger mobile underground haulage equipment with more advanced equipment mechanization, higher levels of autonomous operation of machin
Jan 1, 2003
-
An undergraduate pilot plant experienceBy L. J. Heaslip, J. M. Toguri, T. R. Meadowcroft, R. L. Addinall
"""Pilot Plant Operations"" is a final-year core course given to the Metallurgy and Materials Science students at the University of Toronto. This course involves a laboratory study of an industrial pr
Jan 1, 1980
-
Comparison of the Catalytic Activity between Au and Pt for CO Oxidation within the Range of the Concentration of the Order from ppm to % for Indoor Air PurificationBy Hiroaki Sakurai
Using batch reactors equipped with CO and CO2 gas sensor, CO oxidation over Au catalysts in room air has been investigated and compared with Pt catalysts. For both Au and Pt catalysts, the logarithm p
Oct 1, 2003
-
Factors Affecting Overall Effectiveness of Teleoperated Loading and Haulage Equipment in Underground Metal Mines (2f68619f-48ff-478c-8ed0-965317a4b56f)By Jacek Paraszczak
Application of teleoperated and automated mobile equipment in underground metal mines represents a promising avenue to overcome some of the challenges facing the industry. This paper addresses the iss
Oct 1, 2009
-
Troubleshooting and Operation of the Johnny Mountain Gold MillBy K. C. Armstrong, A. B. Cron, L. A. Melis
"The Johnny Mountain gold mine in northern British Columbia, owned by skyline Gold Corporation, has been in operation since August 1988. Mill operating difficulties at the start of the operation resul
Jan 1, 1990
-
PT Redpath Indonesia and PT Freeport Indonesia Past and Future Development of Underground MinesBy Bruce Mennie
PT Freeport Indonesia (PTFI) operates copper and gold mining operations in a mountainous area of the Mimika regency, near Tembagapura, Papua (formerly, Irian Jaya), Indonesia. The mining and concent
Oct 1, 2010
-
Preparation and Characterization of Straight Y-Shaped Silica Nanorods by Thermal Chemical Evaporation MethodBy G. Zhu
The straight Y-shaped silica nanorods have been synthesized on Si wafer by thermal chemical evaporation of mixed powders of silica and graphite at 1300_ and condensation on Si substrate without assist
May 1, 2008
-
Crystallex’s Las Cristinas Gold Project (7d5d7696-3ce9-4e3a-a905-204bcf9d3fae)By J. R. Goode
"The Las Cristinas deposit contains about 10.2 million ounces of gold at a grade of 1.3 g/t. The deposit comprises a layer of fully oxidized saprolite (SAPO), a layer of sulphide-enriched saprolite (S
Jan 1, 2004
-
Cyanide Treatment in the Metal Finishing IndustryBy K. R. Coulter
"Good morning gentlemen. I am very pleased to have this opportunity to tell you a few of the things that happen within a completely unrelated activity, the electroplating industry, except that it does
Jan 1, 1973
-
Fine Grinding of a Sparsely Disseminated Sulphide OreBy Augustine O. Orumwense, Micheline Boisclair
"The use of stirred mill to complement tumbling mills in grinding fine grained minerals is increasingly becoming an attractive processing option. Parameters such as agitation speed, grinding media typ
Jan 1, 2008
-
Australian Proterozoic Iron Oxide-Cu-Au Deposits: An Overview with New Metallogenic and Exploration Data from the Cloncurry District, Northwest QueenslandBy Patrick J. Williams, Peter J. Pollard
"Abstract - Enigmatic hydrothermal vein/breccia/replacement Cu-Au deposits with magnetite and/or hematite are well-represented in Australian 1850 Ma to 1500 Ma terrains and associated with different-a
Jan 1, 2001
-
Transforming Flow Sheet Design with Inert Grinding – the IsaMillBy K. E. Barnes
"The IsaMill was developed for fine-grained ores that required at least double the grinding efficiency of ball or tower milling to be economic. This was achieved, but in practice, the benefits of usin
Jan 1, 2006
-
Rehabilitation of Tailings Areas of Uranium MinesBy A. J. Vivyurka
"This is a talk about the experiences that Rio Algom Mines Ltd. has had in the Elliot Lake uranium area trying to make the tailings more compatible with the surrounding environment. To get a better id
Jan 1, 1975
-
The Cigar Lake project — Mining, ore handling and millingBy 12670
The Cigar Lake project will develop the world’s second largest high-grade uranium deposit. The Cigar Lake Phase 1 orebody contains approximately 226 million pounds U3O8 at an average grade of 20.7% U3
Jan 1, 2004