Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Erection and Commissioning Issues for Large Grinding Mill Circuits

    By Randolph R. Dreher, Michael L. Schreder

    "In recent years, FFE Minerals has designed, installed and commissioned several large grinding mill circuits. This paper discusses the issues related to the erection and commissioning of large grindin

    Jan 1, 2001

  • CIM
    Destress blasting in hard rock mines—a state-of-the-art review

    By M. R. Saharan

    A brief overview of rockburst control measures is presented. The paper then elaborates on one key rockburst control measure, which is known as destress blasting. A historical background of the techniq

    Jan 1, 2006

  • CIM
    Oxidation, Weight Gain and Self-Heating of Sulphides

    By J. E. Nesset, J. A. Finch, Rosenblum. F., S. Somot

    "In a previous presentation at the CMP, evidence was shown for the formation of hydrogen sulphide (H2S) in self-heating experiments on pyrrhotite-rich samples (Somot and Finch, 2006). Oxidation of H2S

    Jan 1, 2009

  • CIM
    Radon Decay Products and their Application to Uranium Exploration

    By Cardm Jeffrey W.

    The decay of 222 Rn yields a series of short-lived decay products which become attached to the surface of a plate or wire exposed in a 222Rn-bearing atmosphere. The alpha-activity of two of the decay

    Jan 1, 1979

  • CIM
    Miocene Epithermal Au-Ag Vein Mineralization, Dixie Claims, Midas District, North-Central Nevada; Characteristics and Controls

    By E. T. C. Spooner, Ioannou S. E.

    "Abstract- The Dixie Zone Au-Ag deposit is a low sulfidation (adularia-sericite) epithermal system located 1.4 km from the producing Ken Snyder mine (7.0 M oz Au equivalent reserve/resource), Midas Mi

    Jan 1, 2000

  • CIM
    Some Insights into the Process Design of Ferronickel Smelters

    By S. Mostaghel, S. Nicol, M. Y. Solar

    Once upon a time, the process engineer developing the design criteria for a new saprolite ferronickel smelter had it easy: most ores were around 2.5% Ni, with a Fe/Ni ratio of 4 to 5 and a SiO2/MgO ra

    Jan 1, 2014

  • CIM
    Enhancement of Flow Dynamics of Existing Flotation Cells

    By Timo Niitti, Antti Rinne, Janne Turunen, Sami Grönstrand

    "This paper describes novel methods to enhance the flow dynamics of a mechanical flotation cell that can be applied to an existing installation. There are several reasons to alter the flow dynamics. T

    Jan 1, 2006

  • CIM
    Radium-226 removal from a uranium mill effluent-physical/chemical treatment process development studies

    By R. Webber, D. Averill, L. Whittle, D. Moffeti, G. Kassakhian

    "This paper describes the recent pilot-plant work carried out on two alternative processes capable of producing an effluent containing less than 10 pCi/L total radium-226 activity and very close to 3

    Jan 1, 1980

  • CIM
    Hydraulic Hoisting & Long Distance Pumping of Coal

    By R. E. McElvain

    "Hydraulic transportation of solids in suspension with water or other carriers, such as oil is becoming more practical as economic situations develop with respect to the railroads and other carriers.

    Jan 1, 1978

  • CIM
    Educating Mining Engineers Online

    By Tad S. Golosinski

    The paper describes Online Master of Engineering Program at the University of Missouri-Rolla and discusses the experience gained during the first three years of its offering. This innovative education

    May 1, 2004

  • CIM
    Application of conditional simulations to resource classification schemes

    By M. E. Rossi, J. E. Camacho

    "Geostatistical conditional simulations are becoming increasingly popular as tools that provide models of uncertainty at different stages of a mining project. They have been used as grade control tool

    Jan 1, 2004

  • CIM
    Removal and destruction of ammonia from a uranium plant effluent

    By P. A. Riveros, W. D. Gould, R. Molnar, D. W. Koren, P. Bédard

    This paper reports the results of the field demonstration campaign of a new process for removing and destroying ammonia from mining/ metallurgical effluent solutions. The 50-day campaign was carried o

    Jan 1, 2003

  • CIM
    Process Design and Change Management for Successful Deployment of Technology in Mining

    By Laura Mottola

    Process Design and Change Management for Successful Deployment of Technology in Mining Over the last 30 years Canada has been successful in developing but not deploying hardrockmining automation.

    May 1, 2010

  • CIM
    A study of copper smelting reverberatory furnace design and performance and methods available for increasing throughput

    By M. A. T. Cocquerel, M. G. Burcher, J. G. Eacott

    "This paper is based on work carried out to examine the feasibility of increasing the smelting rate of two oil-fired calcine-charged reverberatory furnaces . Various constraints prevented physical enl

    Jan 1, 1980

  • CIM
    A Novel Synthesis Route for the Preparation of Supported Gold Catalysts for Low-Temperature CO Oxidation

    By Gaby Steinbach

    A novel synthesis is described for the preparation of supported gold catalysts for low-temperature CO oxidation. The novel route is a variation of the inverse co-precipitation method and requires amph

    Oct 1, 2003

  • CIM
    Rock Mechanics Approach for the Recovery of the Zone G Crown Pillar at the Raglan Katinniq Mine

    By P. P. Andrieux

    The recovery of the Zone G crown pillar, located between the bottom of the open pit and the top of the underground workings at the Raglan Katinniq Mine in Nunavik, started in the summer of 2008 and sh

    May 1, 2009

  • CIM
    Sustainable Development Perspectives Of RTB BOR Copper Mines After The Consolidation

    By S. L. Zekovic

    This paper analysis the medium and long-term perspectives, framework and considered possibilities of sustainable development of RTB "Bor" (Copper mines in East Serbia) after consolidation in the perio

    Jan 1, 2007

  • CIM
    Bridging the Gap Strategy to Execution

    PERSPECTIVE ?Natural resources exploration, extraction and beneficiation is complex and challenging: ?Input costs rising, complexity increasing, rising stakeholder management needs, regulatory compl

    May 1, 2013

  • CIM
    Maintenance management control through utilization of a computerized system at the Key Lake project

    By T. Warren, R. Pender

    "Significant strides have been made during the past decade to integrate the traditionally separate administrative functions of financial management, materials management and maintenance management.In

    Jan 1, 1990

  • CIM
    Implementation of a Flotation Expert Control System at the Raglan Mine

    By G. Couture

    "The Glencore Raglan mine Concentrator, located in Quebec’s Nunavik region, has been in operation since 1997. The nickel metallurgical plant was originally designed to process 100 tonnes per hour of o

    Jan 1, 2015