Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Elbof Method of Electrical ProspectingBy E. E. Mueser
As Mr. Lundberg has already ably covered the theory of various methods of electrical prospecting, I shall confine my remarks to a consideration of the features which must obtain in an electrical prosp
Jan 1, 1926
-
Results and Significance of Drilling Operations in the Athabaska Bituminous Sands (7db10b31-607f-414b-a150-33830f038468)By G. S. Hume
Dr. K. A. Clark: No one will doubt the statement of fact that, during drilling operations through the bituminous sand beds in the Mildred-Ruth Lakes area, the core-barrel was found to contain bitumen
Jan 1, 1947
-
Gypsum in Manitoba*By BARRY BANNATYNE
Gypsum in Manitoba is quarried from the Jurassic Amaranth Formation a1 Gypsumville and Harcus; it has been mined near Amaranth and Silver Plains. At Gypsumville, gypsum is carbonate- free but has thin
Jan 1, 1984
-
General Geological Features of the Mining Fields of Manitoba and Adjoining DistrictsBy J. F. Wright
Introduction Previous to 1924 the mining fields of Manitoba and adjoining territory had not been prospected in detail, and the reports of the exploration of the mineral discoveries to that date had b
Jan 1, 1935
-
Meeting the Challenge of GoroThe Project ? $1.4 billion project ? 59,000 tonnes of nickel and cobalt ? Large resource base ? First production end of 2004 The Place ? Half the size of Vancouver Island ? Population 210,000
May 1, 2002
-
Supply Chain Simulation ModellingBy Eric D. Monrad
Supply chain simulation modeling is taking on a more prominent role in mining project planning and decision making. Transportation costs for the supply chain can form a significant component of the ov
May 1, 2013
-
Experiences from an IREDES Prototype Project Production drilling with Atlas Copco Simba L6C Drill Rig at LKAB Kiruna mineBy Mikael Ramström
The IREDES Special Interest Group (SIG) for Drill rigs has been active since its inception at MineExpo 2000, in Las Vegas USA. The SIG for drill rigs is responsible for the development of a IREDES Dri
May 1, 2003
-
Community Development At Anglo American Chile's Chagres SmelterBy C. A. Clark
The Chagres Smelter is located 80 kilometres north of Santiago - Chile, in the middle of an agricultural valley which is also one of the poorest districts in the country. This condition sets the main
Jan 1, 2007
-
Stratigraphy, Structure, and Geochemistry of the Halfmile Lake Massive-Sulfide Deposit, New Brunswick (a738daf4-2f2a-4901-b06d-657f347a1821)By Robin N. Adair
The Halfmile Lake stratiform volcanogenic massive-sulfide deposit consists of pyrrhotiterich breccia-matrix sulfides and pyrite-pyrrhotite-rich layered sulfides that form a laterally continuous sheet
Jan 1, 1992
-
Uranium Accounting ReconciliationBy A. Kobzhanov, S. Saparova, S. Brochot, D. A. Mango
KATCO (an ORANO Mining and Kazatomprom joint venture) is the largest in-situ leach uranium mining operation in the world, exploiting the Muyunkum and Tortkuduk uranium deposits in southern Kazakhstan.
Jan 1, 2020
-
Some Aspects of Coast Range GeologyBy W. R. Bacon
"IntroductionTHIS IS a brief discussion of certain regional and economic aspects of the Coast Range of British Columbia. Between Portland canal and the 60th parallel of latitude, only the eastern marg
Jan 1, 1955
-
Industry sets sights on new targetBy Robert B. Parsons
"The mining industry is adjusting its sights to take a shot at the rising level of non-profit taxes which threaten to handicap the industry 's competitive advantage. In the case of this particula
Jan 1, 1992
-
Ore Problems and the MicroscopeBy W. L. Uglow
In recent years, the microscope has come to be recognized as a valuable aid to engineers whose business is the discovery, development, concentration or reduction of metallic ores. In many of the large
Jan 1, 1924
-
Hope Bay Gold Project - NunavutA Joint Venture between Hope Bay Gold Corporation and Miramar Mining Corporation recently acquired the Hope Bay project in Nunavut, which represents the first discovery of a major new Archean greensto
May 1, 2001
-
Roasting Arsenical Gold Ores and Concentrates (166ac363-47f6-462a-bf96-1ae6ad3be36c)By F. R. Archibald
MR. A. F. B. Norwood: Having been associated in the past few years with nine different plants roasting aurif erous concentrates in Australia, two of which were new installations for which design and c
Jan 1, 1949
-
Stacking of potash mill tailingsBy G. A. Maki, P. J. Fullman, R. G. Roden
"In October 1984, Rocanville Division began using a stacking system to handle potash mill tailings. Previous to this date, mill tailings were slurried to the top of the tailings pile and allowed to de
Jan 1, 1990
-
Productivity improvement in mechanized cut-and-fill mining at Trout Lake MineBy F. P. Yungwirth
"IntroductionTrout Lake Mine is located about 5 km north of the Hudson Bay Mining and Smelting Co., Limited complex at Flin Flon, Manitoba. The mine was brought into production in 1982at the onset of
Jan 1, 1988
-
Integrating Radar Proximity Sensing and Camera Vision to Improve Mining Equipment Safety with Minimal DistractionBy Nima Nabavi
Shovels and excavators have significant blind spots due to their large sizes, increasing the chances of collision with other surrounding equipment such as haul trucks, loaders, and dozers. While a cam
Oct 1, 2009
-
Base Metals and High Intensity Wet Magnetic SeparationBy W. J. D. Stone
"INTRODUCTION Over the past decade, a number of publications have described the advances in High Intensity Wet Magnetic Separation. A number of significant, but small capacity installations were made
Jan 1, 1971
-
TransAlta's Centralia MineCentralia?Mine Operations ?Centralia Mine ?Mountainous Terrain ?High rainfall (greater than 50 inches/yr) ?Multiple Pit/Multiple Seam ?Truck/Shovel Prestripping ?Dragline Overburden ?Coal Wash
May 1, 2001