Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    An Intelligent System for Monitoring Tower Cranes on Construction Sites

    By M. A. Nadar

    Harsh and dynamic construction sites are generally equipped with cranes in order to rapidly and conveniently move heavy loads from one location to the other. If not properly inspected and managed, thi

    Aug 1, 2013

  • CIM
    The technical-scale realization of the Kivcet Process for lead

    By Kiran B. Chaudhuri, Michael Koch, Jorg Lema Patino

    "Stricter pollution regulations together with other factors have stimulated interest in the modernization of the traditional sinter - blast-furnace lead operation. In this context, direct smelting met

    Jan 1, 1980

  • CIM
    Incorporation of Geometallurgical Modelling into Long-Term Production Planning

    By K. Waters, A. Navarra, T. Grammatikopoulos

    Strategic decisions to develop a mineral deposit are subject to geological uncertainty, due to the sparsity of drill core samples. The selection of metallurgical equipment is especially critical, sinc

    Jan 1, 2017

  • CIM
    An overview of wear-resistant alloys for the mining industry

    By J. B. C. Wu, B. McKee

    "Mining along with subsequent processing of the minerals often presents conditions where a wear- and/or corrosion-resistant alloy is needed to minimize downtime and maximize efficiency. This paper is

    Jan 1, 1997

  • CIM
    Designing for Closure And Beyond: The Perspective from Financial Institutions

    WHAT IF? ?Mine closure and reclamation liabilities were fully funded -at all times from current mine revenues ?Unexpected & catastrophic events were insured ?Remediation costs could be capped ?Ris

    May 1, 2006

  • CIM
    Two-Stage Fluid Bed Reactor for Arsenic Removal and Fixation

    By K. Adham, C. T. Harris

    Arsenic is often associated with copper, nickel and gold in sulphide deposits. This paper describes a two-stage high-temperature fluid bed reactor for the removal and fixation of As from ores and conc

    Jan 1, 2014

  • CIM
    A calibration probe for level detection systems in flotation columns

    By A. Uribe-Salas, J. A. Finch, B. J. Huls

    Froth depth or interface level is an important control variable in column flotation which can influence both grade and recovery. A common method of locating the level is based on sensing the hydrostat

    Jan 1, 1990

  • CIM
    Conditional Bias of Geostatistical Simulation for Estimation of Recoverable Reserves

    By Jason A. McLennan

    Conditional bias is an infamous problem with estimation methods including kriging. Changing estimation parameters will mitigate, but not remove, conditional bias. The conditional bias of kriging is we

    May 1, 2002

  • CIM
    Hyperspectral Remote Sensing Characterization of Mine Materials for Process Control

    By Isabel F. Barton, Matthew J. Gabriel, Mark D. Barton

    Process control, mine-to-mill optimization, and other mining operations depend on having robust, comprehensive mineralogical and chemical characterization. However, current characterization methods re

    Jan 1, 2019

  • CIM
    Selecting Effective Hydrogen Production and Delivery Optionis for Mining Applications

    By Kimberly M. Curran

    The path by which hydrogen supply is provided to any end use application will have a strong effect on the specific economics and price stability for the product supply and the flexibility with which i

    May 1, 2007

  • CIM
    Gas diffusion electrodes with Nafion-ZrP electrolyte for PEMFC operation at 80 to 120°C

    By Z. Xie

    Gas diffusion electrodes (GDEs) for high temperature polymer electrolyte fuel cells (PEFCs) have been prepared using ZrP-modified Nafion ionomer. The performances of these GDEs as cathodes and anodes

    Jan 1, 2005

  • CIM
    Modeling of Anisotropic Behavior of Aluminum Profile for Damage Prediction

    By F. Andrieux

    "Extruded aluminum profiles are increasingly used for lightweight vehicle construction. Since fracture strains of aluminum profiles are relatively low, damage modeling is crucial for reliable crash si

    Jan 1, 2018

  • CIM
    Process for the Complete Utilization of Oil Sands Fly Ash

    By T. H. Etsell, P. C. Holloway

    The fly ash produced by oil sands operations in northern Alberta represents a large, high-grade, potential resource for vanadium production in Canada. After extensive batch testing at the University o

    Jan 1, 2004

  • CIM
    Basics of Dynamic Key Performance Indicators for Haulers in Motion

    By T. G. Joseph

    ABSTRACT: The Canadian oil sands provide some of the harshest mining conditions in the world. Asoperations demand ever bigger tools, the toll on large mobile mining equipment is high, with structura

    Jan 1, 2011

  • CIM
    Ion Exchange For Electrolyte Purification In Copper Electrowinning And Electrorefining

    Ion Exchange is finding a greater role in copper processing, and hydrometallurgy in general, both as a technique for removing impurities and as a means of adding value through the recovery of secondar

    Jan 1, 2007

  • CIM
    An Integrated 3D GIS Model of the Yellowknife Camp: A Tool for Efficient Development

    By Garth D. Kirkham, James P. Siddorn, Hendri Falck

    "Abstract - As an integral part of the Geological Survey of Canada’s EXTECH III Project, a threedimensional computer model has been created of the Con and Giant gold mines in the Yellowknife Greenston

    Jan 1, 2003

  • CIM
    The Tasu Concentrator

    By Kenneth Blower

    This paper gives a detailed coverage of the ore flow through the primary crusher, cobbing plant and concentrator, including equipment sizes, recoveries, reagent consumptions and product descriptions.

    Jan 1, 1968

  • CIM
    Prognosis and maintenance management system for applications to aircraft engines

    By Raj Thamburaj, Li. Ping, Prakash C. Patnaik

    "An effective prognosis system for aircraft engines may involve the application of a wide range of technologies and methodologies, which may include: - On-line, real-time and in-situ non-destructive i

    Jan 1, 2004

  • CIM
    CIM Guidelines for the Reporting of Diamond Exploration Results (2003)

    "These guidelines, implemented in 2003, were recommended by the Diamond Exploration Best Practices Committee established by the Canadian Institute of Mining, Metallurgy and Petroleum. The guidelines a

    Jan 1, 2003

  • CIM
    Hydrometallurgical Process for Treating Copper Concentrates at Sumitomo Metal Mining

    By S. Asano

    Hydrometallurgical processes for treating copper sulfide concentrates have attracted considerable attention over thirty years and many processes have been developed. However there have been still prob

    Jan 1, 2007