Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Geological Implications of Regional Stream-Sediment Geochemical Data from South-Central British Columbia

    By R. H. Wallis

    Weighted moving-average contour maps have been constructed for molybdenum, copper and zinc using 7850 stream-sediment samples from 5430 square miles (14,063 sq. kms) of south-central British Columbia.

    Jan 1, 1978

  • CIM
    Metallurgical Coals of the Crowsnest Area

    By E. J. Burrough

    Coal Reserves The Crowsnest Pass coal fields form part of a greater area which comprises the Inner Foothills belt of the Alberta coal fields and the southeastern coal fields of British Columbia. The

    Jan 1, 1951

  • CIM
    Three Dimensional Transient Analytical Modeling of Friction Stir Welding (FSW) Including Actual Affected Parameters

    By S. Rash Ahmadi

    Welding is highly reliable and efficient metal joining process. In welding the metal adjacent to the weld joint is subjected to severe thermal conditions. As a result, complex changes in metallurgical

    Oct 1, 2011

  • CIM
    A novel approach to enclosed gear lubrication on board mining equipment

    By Shek N. Lau, Nicola Samman

    "Enclosed gear cases on board heavy mining equipment have traditionally been lubricated with regular heavy duty gear oils. However, equipment manufacturers, have recommended the use of an ISO-1000 gea

    Jan 1, 1996

  • CIM
    Pressure filtration of copper concentrate at Mines Northgate Patino Inc.

    By G. Ladouceur

    "Northgate Patino Mines produces a copper concentrate assaying 22% Cu. Moisture content of the product averages 12.5% H20 when dewatering with conventional vacuum disk filters. Recent smelter contract

    Jan 1, 1987

  • CIM
    Waite Amulet Mine: Waite Section

    By W. L. Bancroft, Peter Price

    "What is now known as the 'Waite section' of the property of Waite Amulet Mines, Limited, was originally the Waite-Ackerman-Montgomery mine. It includes a group of twenty-eight claims lying on either

    Jan 1, 1954

  • CIM
    Tire Maintenance at Scully Mine, Wabush

    By R. B. Anderson, N. J. Sherren

    The mining equipment at the Scully Mine, Wabush, consists of approximately twenty-five large haulage units, eight large dozer-loader applications and seventy other related pieces of service and mainte

    Jan 1, 1969

  • CIM
    Modeling of Rock Fracture Flow using the Lattice Boltzmann Method on Graphics Hardware

    By S. A. Briggs

    Bioremediation has been accepted as a treatment technique for groundwater contamination in subsurface soils and shows promise for contaminated fractured rock environments. Biological growth in fractur

    May 1, 2009

  • CIM
    Geology as a Risk Factor in Project Evaluation: Its Impact on Reserve Estimation

    By Chris M. Healey

    "Abstract - Perhaps the single most significant variable in the evaluation of a mining project is the reserve estimate. Many parameters are considered when estimating reserves, among them geology. Thi

    Jan 1, 1992

  • CIM
    An Investigation into the Relationship between Excess Gibbs Energy and the Role of Surfactants in Froth Flotation

    By M. C. Harris

    "Excess Gibbs energy is a thermodynamic parameter which quantifies the difference between the value of the Gibbs energy for a real mixture and that for an ideal mixture. More specifically the partial

    Jan 1, 2016

  • CIM
    Revitalizing the White Mesa Uranium-Vanadium Mill of Denison Mines (USA) Corp. at Blanding, Utah USA

    By C. Barlow

    The White Mesa Mill (WMM) began operating in 1980 as a regional processing mill owned by Energy Fuels Nuclear, Inc. Original mill design was for 656,000 Mtpa of U ore producing 1,250 tpa of U3O8 conce

    Aug 1, 2010

  • CIM
    Metamorphism of Iron-Formations and. its Bearing on their Beneficiation

    By G. A. Gross

    DURING the past 5 years a large amount of money and effort has been expended in exploration of iron-formations and in testing their suitability for beneficiation. Beds of ferruginous material are nume

    Jan 1, 1961

  • CIM
    Operational Aspects of the Granisle Pit

    By R. R. Montigny

    A brief description is given of the history, location and geology of the Granisle Copper Limited operation on Copper I land in Babine Lake. Detailed information is given with regard to pit design, pla

    Jan 1, 1971

  • CIM
    Conventional Shaft Sinking Unconstrained by Equipment Availability

    By S. W. Henley

    "Shaft sinking design is typically driven by what has been successful in the past and the availability of sinking plant. This document considers a project where the sinking design and methodology is u

    Jan 1, 2019

  • CIM
    Discontinuum Mechanics of Linear Rock Masses

    By C. Yanqui

    "Discontinuum Mechanics is based on two foundations: the idealization of the internal structure of substances, and the principle of the arithmetic mean value. For a linear discontinuum, the methods of

    Jan 1, 2015

  • CIM
    A Numerical Validation of the Gnirk and Johnson Theoretical Solution for Petroleum Salt Wells

    By F. Mackay, S. A. B. da Fontoura

    "The theoretical solution for a viscoelastic well was presented by Gnirk and Johnson in 1964. From this an exercise was executed to validate the numerical simulation of a cemented salt well. The exerc

    Jan 1, 2015

  • CIM
    Optimisation of the Prominent Hill SAG Mill

    By Mark Weidenbach

    OZ Minerals owns and operates the Prominent Hill copper-gold concentrator in South Australia, built in 2008 and commissioned in early 2009. The concentrator operates via semi autogenous grinding in a

    Jan 1, 2012

  • CIM
    Methodology for Ore Sorting at Agnico Eagle Preparing the Way to Generate Profit from Waste

    By P. Nayak

    "Comminution is an energy intensive and expensive process consuming approximately 40-50% of the total processing costs in a mining operation. This process poses an even greater challenge with gold ore

    Jan 1, 2019

  • CIM
    Towards a Novel Process for the Epoxidation of Propene over Gold/Titania-Based Catalysts

    By Aalbert Zwijnenburg

    One of problems connected with the use of gold/titania-based catalyst systems is the low yield in propene oxide (up to 2 wt %). It is shown that the low propene oxide yield is due to product inhibitio

    Oct 1, 2003

  • CIM
    Integrated Design Considerations of Copper Solvent Extraction and Electrowinning Plants to Maintain High Quality Electrowon Copper

    By B. Currie

    Maintenance of quality electrowon copper requires an electrolyte which has suitable chemical and physical characteristics. The proper design and operation of the solvent extraction plant is essential

    Jan 1, 2014