Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A Review and Update of the Grinding Circuit Performance at the Los Pelambres Concentrator, Chile

    By Gonzalo Bernstein, David G. Meadows, German Naranjo, Edgardo Tapia

    "During the last decade Antofagasta Minerals’ Los Pelambres Mine has dramatically increased its ore throughput following the fast initial phase ramp up through a series of planned incremental expansio

    Jan 1, 2012

  • CIM
    Western Canadian Plains - A New Challenge to Geophysics

    By A. F. Beck

    Abstract Canada has opened up a geological province in ?Western Canada which offers a new .stimulus to oil exploration geophysics. The problems of instrumental technique, interpretation, and log

    Jan 1, 1950

  • CIM
    The McDougall-Despina Fault Set, Noranda, Quebec: Evidence for Fault-Controlled Volcanism and Hydrothermal Fluid Flow

    By H. L. Gibson, T. N. Setterfield, J. J. Watkins, R. W. Hodder

    "Abstract - The McDougall-Despina fault set in the Noranda district of northwestern Quebec defines the eastern margin of the Despina cauldron, nested within the district-scale Noranda cauldron. The fa

    Jan 1, 1995

  • CIM
    Thunder Bay Terminals Ltd. - Terminal Plant Design

    By J. Carr

    This paper discusses: (1) the need for Western Canadian coal in eastern Ontario Hydro plants; (2) design parameters-unit trains, year- 'round receiving from trains, and shipping (Great Lakes seas

    Jan 1, 1979

  • CIM
    The McDougall-Despina Fault Set, Noranda, Quebec: Evidence for Fault-Controlled Volcanism and Hydrothermal Fluid Flow (8b315248-86ed-4297-a9d7-9e3178af9d62)

    By H. L. Gibson, T. N. Setterfield, J. J. Watkins, R. W. Hodder

    "The McDougall-Despina fault set in the Noranda district of northwestern Quebec defines the eastern margin of the Despina cauldron, nested within the district-scale Noranda cauldron. The faults are st

    Jan 1, 1995

  • CIM
    The Kidd copper smelter and refinery description and early operation

    By C. J. Newman, D. J. Kemp, R. M. Sweetin

    "The smelter is described by area; feed preparation, continuous furnace line, gas handling and auxiliary systems, blister refining, Hazelett casting of thin anodes, and scrap remelting. Early smelter

    Jan 1, 1984

  • CIM
    Iron Bleed in the Maboumine Process

    By Philippe Ribagnac, Bruno Courtaud, Jean-Marie Lambert, Valérie Weigel

    Mabounié is a polymetallic deposit in Gabon containing niobium (1.2 wt.%), tantalum (0.03 wt.%), rare earth elements (REE) (1.4 wt.%) and uranium (0.03 wt.%) that are mostly carried by pyrochlore mine

    Jan 1, 2016

  • CIM
    In-situ thermal analysis technology for aluminum foundry alloys

    To produce high quality castings, one must monitor the melt quality by evaluating such parameters as the grain refinement and silicon inoculation and modification during the production of the commerci

    Jan 1, 2004

  • CIM
    Non-ferrous pyrometallurgy – A changing industry

    By John C. Taylor

    "The non-ferrous pyrometallurgical industry has been under extreme pressure since 1980 and significant changes are taking place, principally in the copper, nickel and lead industries. This paper revie

    Jan 1, 1988

  • CIM
    Geology of the Asbestos Belt in Southeastern Quebec

    By P. H. Riordon

    ONE OF the major sources of the world's supply of asbestos lies in a belt of ultrabasic rocks stretching through the Eastern Townships of Quebec where chrysotile asbestos has been mined continuously s

    Jan 1, 1962

  • CIM
    Design and control of large hydraulic backfill pours

    By John D. Smith, Robert J. Mitchell

    "There is a world-wide trend toward underground bulk mining methods employing hydraulically placed backfill. This trend is recent and therefore there is little in the literature to assist an operator

    Jan 1, 1982

  • CIM
    Computer design of underground mine dewatering systems

    By E. M. De Souza, R. Penner

    "Water is encountered at the majority of underground mines, both over their lifetime and during each stage of development and production. The dewatering system is one of the most important and costly

    Jan 1, 1993

  • CIM
    Get the Benefits from Control Systems

    By Michel Ruel

    Most plants do not track how their systems perform. Optimization is the easiest way to benefit from your control systems. We suggest an approach in four phases. The first phase is to assess all equipm

    Jan 1, 2019

  • CIM
    Mineralogical Characterization and Metallurgical Processing of Seafloor Massive Sulphides from the German License Area in the Indian Ocean

    By M. Sommerfeld, U. Schwarz-Schampera, B. Friedrich, D. Friedmann

    The steadily growing demand for metals and their price increase at metal exchanges make the mining and utilization of marine mineral resources like polymetallic nodules, manganese crusts or sulfide de

    Jan 1, 2019

  • CIM
    Reeves Macdonald Mine

    By J. T. Fyles, C. G. Hewlett

    "THE REEVES MACDONALD mine is in the Sa Imo-Pend d'Oreille mining area of southeastern British Columbia. It is on the Nelway-Waneta road 4 miles west of the border-crossing point of Nelway. The Reeves

    Jan 1, 1949

  • CIM
    Can we interpolate RQD?

    By D. Marcotte

    The Rock Quality Designation (RQD) is a standard scalar measure of rock quality used in common rock mass classification systems (e.g. RMR, Q system). RQD is measured along diamond drill holes. RQD int

    May 1, 2003

  • CIM
    Risk Management Approach to Taphole Integrity at Olympic Dam Copper Smelter

    By F. Musuka, D. Jenkins, A. Keyes

    BHP Olympic Dam operates a Direct-to-Blister copper flash smelting Furnace (DBF) and an Electric Slag Cleaning Furnace (ESCF). Tapping blister copper from these furnaces via tapholes is a routine task

    Jan 1, 2019

  • CIM
    A New Approach for Characterisation of Densely Fractured Rock Masses Using Artificial Neural Networks and Principal Component Analysis

    By R. B. Kaunda

    One fundamental requirement for surface and underground rock engineering is the ability to characterise the rock mass. An accurate characterisation of the rock mass allows rock engineers to optimize d

    Jan 1, 2015

  • CIM
    New Brunswick ? Last But Not Least

    By R. D. Brown

    Ever since British Columbia started the ball rolling in 1974 with the introduction of its now-defunct Mineral Royalties Act, all Canada's resource-based provinces have significantly altered their

    Jan 1, 1977

  • CIM
    The history of underground mine lighting

    By D. A. Trotter

    "This paper traces the main advances in mine lighting from neolithic times to the 1960s. The earliest lights consisted of reeds or strips of wood soaked in grease. As man's knowledge increased, t

    Jan 1, 1982