Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Triggered Rockbursts and Induced RockburstsBy Jian Deng
Rockbursts are sudden and violent failure of rocks in deep and/or high stress mines, which may destroy the excavation space and cause an accident or even the death of mining workers. This study is mot
Jan 1, 2015
-
Development of the System for Furnace Integrity Monitoring Based on Real-Time Continuous Acoustic Emission Data Acquisition and AnalysisBy A. Saki, P. Gebski, W. Ying
Industrial smelting furnaces are subjected to significant structural changes and deterioration caused by the conditions under which they operate. The current methods for the structural assessment of f
Jan 1, 2011
-
A Light-Media Pump for Dredging Minerals From the Sea FloorBy James Ball
The paper describes a new type of pump and related apparatus specifically designed to dredge sea-floor minerals from very great depths. The principle of operation of the dredging system is explained,
Jan 1, 1968
-
Finding Efficiencies in Environmental Monitoring Programs for MiningBy Karen Munro
Importance of Aquatic Studies for Mining ?Aquatic habitat is usually the first area where a mine interacts with the ?real world? outside the mine footprint ?Water management is a key consideration fo
May 1, 2011
-
Potential of Laser Welding and Friction Stir Welding for Joining AA1100-16 VOL.% B4C Metal Matrix CompositeThis work illustrates the potential of two welding processes for joining AA1100-16 vol.% B4C metal matrix composite: laser welding process using a 4 kW Nd:YAG laser and Friction Stir Welding. A compar
Jan 1, 2011
-
Zero Gravity Dry Environment Mineral SeparationBy A. Taylor
This paper considers mineral processing in zero gravity dry environments typical of asteroids or comets. The electro-dynamic separation technique using pneumatic flow systems is explored. Pneumatic de
May 1, 2001
-
Arsenic Removal by Sorption Processes From Waste WatersBy R. G. Rosehart, S. Y. Lee
"The current investigation concerns the removal of arsenic from waste waters using ion-exchange resin and activated carbon as sorption media. Use of certain weak and strong base anion exchange resins
Jan 1, 1972
-
Training Program at Sherritt Gordon's Ruttan ConcentratorBy C. E. St. Denis
"Training Program at Sherritt Gordon's Ruttar:. ConcentratorA formal training program for mill operators is being developed and employed at Sherritt Gordon's Ruttan Concentrator. The program was set u
Jan 1, 1974
-
Design and Implementation of Modified Mo Addition to EAF at Uddeholm AB, SwedenBy M. Nzotta, L. Teng, S. Seetharaman, A. Chychko
The objective of the present work is to optimize the EAF practice towards Mo alloying with maximum retention of the alloying element in molten steel. During Mo additions, there were significant losses
Jan 1, 2011
-
Smelter Off-Gas Waste Heat and Carbon Dioxide Sequestration to Promote Production of BiodieselBy G. M. Ross, J. A. Scott, C. A. Laamanen, H. Shang
"Indirect recovery and use of waste heat contained in smelter off-gas is proposed to expand regions available for year-round, on-site production of micro-algae–sourced biodiesel, a fuel that could be
Jan 1, 2017
-
Applications of the Stability Lobes in the Optimization of Machining ParametersBy H. Attia, S. Engin
This paper presents a practical approach for determining the optimal spindle speed and the depth of cut in a milling operation within the ever-increasing economic and technical constrains. Analytical
Jan 1, 2006
-
Post-War Problems of the Young EngineerBy Geo. E. Cole
A GREAT deal of time and energy is now being devoted to the study of post-war reconstruction and rehabilitation, in spite of the fact that as yet we have not won the war in which we are presently enga
Jan 1, 1943
-
Some Problems of Longwall Mining in Cape BretonBy David Morrison
Our present longwall problems in Cape Breton can be grouped under five main classifications. These are: (1) Roof control on the face and on the main roadways leading thereto. (2) Transportation of
Jan 1, 1947
-
5 Dimensional CFD Simulation and Optimization of Ventilation for Mining and Metal Heat Process ApplicationsBy E. G. Baltuch
Natural Ventilation in mining and metallurgical processing applications is key to proper operation function. There are number of ventilator designs available to a project team or design engineers, the
Aug 1, 2013
-
Keys to the Successful Implementation of Reliability-centered Maintenance (RCM II )By Normand Champigny
The Forces of Change ? The current business environment ? What can we expect for the future on management of physical assets ? The impact of maintenance on production costs ? What is RCM is doing
May 1, 2002
-
Nanostructured Gold and Alloys for Fuel Cell CatalysisBy Chuan-Jian Zhong
Gold-based nanoparticles in the size range of a few nm have attracted increasing interests in catalysis, sensors and biomedical applications. The study of the unique catalytic properties of nanosized
Oct 1, 2003
-
Mechanized narrow vein mining at the Dome Mine, Timmins, OntarioBy Brian E. Robertson
"This paper summarizes work carried out at the Dome Mine to mechanize the mining of narrow veins of less than 1.5 m in width by the introduction of new mining methods and specifically designed electri
Jan 1, 1986
-
Eagle Mountain, modelling and miningBy J. H. Gray
"IntroductionIn 1980, Fording Coal Limited started conceptual planning studies which led to major changes in the long-range mining plan at their Fording River Operations. These new plans have been com
Jan 1, 1986
-
Wireline Hydraulic Mini-frac Testing: Experiences in the ANDRILL SMS Borehole, McMurdo Sound, AntarcticaBy Douglas R. Schmitt
In general, knowledge of the state of stress within the Antarctic lithosphere remains largely unconstrained due in part to Antarctica?s inaccessibility and because of the paucity of seismic focal mech
Jun 1, 2012
-
Structural Control of Orebodies in Nova Scotia Gold DistrictsBy H. L. Cameron
Introduction Since the beginning of gold mining in Nova Scotia in the year 1860, the biggest problem o the mine operators has been to find and follow the ore zones in the narrow quartz veins. It wa
Jan 1, 1947