Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    CANMET-MMSL Alternative Binder Technology

    By A. Pratt

    Portland cement is primarily used to solidify backfill in underground mine workings and it represents a major cost in mining operations. CANMET-MMSL has invented an alternative binder technology that

    May 1, 2010

  • CIM
    Lithogeochemistry as a guide to identifying favourable areas for tile discovery of volcanogenic massive sulphide deposits

    By V. J. Sopuck, O. P. Lavin, Ian Nichol

    "A major challenge of contemporary exploration geochemistry is the development of procedures that can locate blind mineralization or mineralization that sub-crops below a cover of transported overburd

    Jan 1, 1980

  • CIM
    On-Stream Analysis (OSA) of Industrial Slurries for Process Control and Optimization Using Laser-Induced Breakdown Spectroscopy (LIBS)

    By Guy Chevalier, Jean-Guy Chartrand, Louis Barrette, Daniel Michaud, Michel Fortin

    "COREM has developed, specifically for the mineral industry, a mobile laboratory using the Laser-Induced Breakdown Spectroscopy (LIBS) technique. It has been used to perform onstream analysis (OSA) of

    Jan 1, 2004

  • CIM
    Industrial and Fuel Minerals of Manitoba

    By G. M. Hutt

    Introduction The major development of industrial minerals in Manitoba has been in building materials. 'The building-stone industry is developed far beyond the needs of the Province, and the well

    Jan 1, 1934

  • CIM
    Leaching Of Copper Flash Furnace Dusts with Weak Acid Bleed and Arsenic Precipitation as Scorodite and Arsenical Jarosite

    By A. Roca, G. Ríos, I. Ruíz, M. Cruells

    Flash Smelting Furnace (FSF) hot dust-laden is cooled in a waste heat boiler (WHB) and then dedusted in electrostatic precipitators (ESP’s) before being treated, together with the Peirce Smith Convert

    Jan 1, 2019

  • CIM
    A study of problems relating to mining engineering university education

    By C. Pelley, A. Piche

    "The Canadian mining industry faces the prospects of a severe shortage of graduate mining engineers over the next decade. This arises from three factors: first, a growth in industrial activity; second

    Jan 1, 1989

  • CIM
    The Benefits and Challenges of “Split Milling” at the Williams Mill

    By Glenn Norris, Tyler Buckingham

    "Gold recovery gains in the order of one to two percent have been realized in 2009 due to changes in the operation of the grinding circuits at Barrick Gold Corporation’s Hemlo - Williams Mill. The ini

    Jan 1, 2010

  • CIM
    Detection of Hydrocyclone Malfunction

    By Arnaud Faucher, Claude Bazin, Marilène Renaud, Mohamed Mai Manga

    "Grinding circuits are operated in the presence of disturbances due to ore changes and equipment malfunctions. One of the challenges faced by the operators is the detection of a disturbance, the ident

    Jan 1, 2010

  • CIM
    Optimization of Capital Cost and Smelter Revenue - Integrated Team Rebuild of Barro Alto Furnaces

    By K Belanger, J. Mclachlan, F. Stober, G. Norval, B. Snider, A. Munsch, T. Koehler, E. Piantino, J. Carlos Queiroz

    The project to rebuild the smelting furnaces at the Anglo American - Barro Alto ferronickel smelter, located in Goias, Brasil, was initiated in September 2013. To optimize the capital cost, while maxi

    Jan 1, 2015

  • CIM
    A liquefaction incident in a fill raise: A case study

    By F. Hassani, K. Moozar, J. Ouellet, P. Gauthier

    "This paper describes a sudden spill of waste rock used for backfilling from a waste pass at an underground mine in Canada, thus causing a major failure/accident. The mine operator immediately launche

    Jan 1, 2004

  • CIM
    Application of a kinematically admissible velocity field to the analysis of the arching phenomena in backfills

    By F. P. Hassani, H. B. Poorooshasb

    "A kinematically admissible velocity field is applied to study the arching phenomenon in a cohesionless granular backfill placed between two rough vertical inflexible walls. The study is different fro

    Jan 1, 1989

  • CIM
    Application of Passive Sonar Technology to Mineral Processing and Oil Sands Applications “If you can measure it, you can manage it.”

    By Mark Fernald, Christian O’Keefe, John Viega

    "In this presentation, the SONARtrac™ technology platform will be described. CiDRA's proprietary clamp-on, passive sonar array-based flow meter technology performs two independent measurements – flow

    Jan 1, 2007

  • CIM
    Materials Challenges in Mine, Mill, and Smelters

    By N. Behnood

    "This paper describes how material selection, quality assurance, and failure investigation play important roles in the efficiency and safety of mining and metallurgical operations.INTRODUCTION Materia

    Jan 1, 2015

  • CIM
    Stochastic Mine Planning Optimization: New Concepts, Applications and Monetary Value in an ever Uncertain Market

    By Roussos Dimitrakopoulos

    Conventional approaches to estimating reserves and optimizing mine planning and production forecasting result in single, often biased forecasts. This is largely due to the non-linear propagation of er

    Oct 1, 2009

  • CIM
    FreedomCAR and Casting

    By J. A. Jr. Carpenter

    Expanding world economic prosperity, probable peaking of conventional petroleum production in the coming decades and environmental concerns require efforts to increase the efficiency of, and the devel

    Jan 1, 2006

  • CIM
    Technical Challenges in Laser Additive Manufacturing of Metallic Parts

    By J. Y. Hascoet, M. Marya, S. Marya

    Additive manufacturing (AM) brings disruptive changes over the ways parts and products are designed, tested, qualified, assembled, inspected and marketed. With these changes come real technical challe

    Jan 1, 2014

  • CIM
    Enhancing the safety of remnant pillar recovery in lignite by numerical modelling

    By C. O. Aksoy, H. Kose, K. Heasley, E. Yalçin

    "In Turkey, the growing demand for lignite has resulted in increased lignite production and an emphasis on improving underground recovery. This has resulted in a gradual increase in the application of

    Jan 1, 2004

  • CIM
    Developments in at-Face/in-Pit Processing Technologies

    By Martin Stoklossa

    Surface mining operations typically require run-of-mine material to be sized for further processing. In-pit crushing facilities serve this need, as stationary, semi-mobile or fully mobile units. Altho

    May 1, 2008

  • CIM
    Simulating the Mine-Mill Interface

    By J. A. Meech, G. R. Baiden

    "A dynamic simulation of a mine-mill complex has been conducted using networked microcomputers (IBM PC/AT and IBM PC/XT). These models allow simultaneous operation of an open pit using shovels and tru

    Jan 1, 1987

  • CIM
    Gold Milling at Lac Shortt

    By P. Dyas, H. Zouitt, D. M. Smith

    "Falconbridge Copper's Lac Shortt gold mine is located in northern Quebec approximately 300 km northeast of Val D'Or and 100 km west of Chibougamau (Pig. 1). Engineering for the mill commenced in earl

    Jan 1, 1987