Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Evaluation of the Tower Mill as Regrind Machine

    By J. M. Menacho, J. M. Reyes

    "Batch and continuous regrind tests were conducted in 3 kW and 15 kW tower mill units, respectively. Single particle size classes of a chilean copper sulphide concentrate were employed in the batch te

    Jan 1, 1989

  • CIM
    Mineral Possibilities of Areas Adjacent to the Alaska Highway (ff91bb7d-99bb-4806-86e2-a2d9cfd3ea8e)

    By Thomas. L. O.

    Apart from a few sketches and incomplete maps, mainly topographical, and one or two detailed maps of placer-creeks, there is little information on the topography and geology of most of the country adj

    Jan 1, 1944

  • CIM
    Case Studies with the Falcon Concentrator

    By G. Naud, J. Robitaille, M. Buonvino, A. Veltmeyer, A. R. Laplante

    "A B6 Falcon concentrator was tested on several systems: a synthetic magnetite-silica ore, a massive sulphide gold-copper ore, a fine gold-pyrite-silica flotation tail, and a high grade gold ore in a

    Jan 1, 1993

  • CIM
    Silica Flotation and the Use of Fine Screening in Iron Ore Beneficiation

    By G. Major-Marothy

    "INTRODUCTIONA beneficiation plant to upgrade earthy iron ores is being installed by the Iron Ore Company of Canada in Sept-Iles, Quebec.The crude ore for the plant will come from the Knob Lake area,

    Jan 1, 1972

  • CIM
    An overview of valuation practices and the development of a Canadian code for the valuation of mineral properties

    By K. Spence

    "The notion of “value” has always been a subjective and contentious issue. Indeed, value is in the eye of the beholder. There are as varied methods and practices for valuing property, as there are ind

    Jan 1, 2002

  • CIM
    In Situ Measurements for Geomechanical Design of Cemented Paste Backfill Systems

    By M. W. Grabinsky

    Better in situ performance data is required in order to advance the rational geomechanical design of cemented paste backfill systems. A few in situ test programs have been conducted, but these have su

    May 1, 2007

  • CIM
    A Review of the Geology of Gold in Nova Scotia

    By Milton C. Graves, Marcos Zentilli

    "Gold has been reported from most geological environments in Nova Scotia; however, virtually all production (circa 2,000, 000 troy ounces; circa 60 tonnes) has come from that part of the province to t

    Jan 1, 1982

  • CIM
    Elimination of the Pre-Aeration and Primary Filtration Circuits From the Dome Mill Flowsheet

    "Placer Dome Inc.'s Dome Mine is located in South Porcupine, Ontario and has been in production since 1910. In the past, the mill leach circuit was preceded by preaeration and primary filtration circu

    Jan 1, 1992

  • CIM
    Computer Control of Flotation at Ecstall

    By M. P. Amsden

    "Ecstall Mining Limited, a subsidiary of Texas Gulf Incorporated operates the Kidd Creek Mine, a 10,000 tons per day base metal producer, near Timmins, Ontario. Two different ore types are mined and m

    Jan 1, 1973

  • CIM
    Identification of Active Sites and Influence of Real Structure of Gold Catalysts in the Selective Hydrogenation of Acrolein to Allyl alcohol

    By Peter Claus

    In the last years, supported gold catalysts with particle sizes smaller than 10 nm have attracted a lot of attention. While gold bulk metal is rather inert in chemical reactions and, thus, is of low i

    Oct 1, 2003

  • CIM
    Beneficiation of Marine Sands from Les Iles-De-La-Madeleine

    By Alain Dorval

    "''Purification of marine sands from Les Iles-de-la-Madeleine''This paper presents the results of the work that has been done at CRM pilot plant for «Les Silices du Golfe Inc.». Essentially the purpos

    Jan 1, 1994

  • CIM
    Chapter 2. The Courts, the Law and Litigation

    By Karl J. C. Harries

    "2.1. INTRODUCTIONNo agreement can be perfect in the sense that it contemplates and provides for all eventualities. Mineral acquisition agreements are usually negotiated and drafted at a time when an

    Jan 1, 2003

  • CIM
    Dynamics of Canadian coal supply

    By D. O. Downing

    "The 1990s saw enormous changes in the Canadian coal industry and the future promises to be no less turbulent. While the markets served by Canadian coal producers have changed and buying practices con

    Jan 1, 2002

  • CIM
    Biological Sulphide Production for Process and Environmental Applications

    By Lyn Jones, Mike Bratty, Rick Lawrence, David Kratochvil

    "The treatment of water is required at many mining operations to remove metals and prevent the discharge of contaminated water to the environment. In other cases, water treatment is used to provide be

    Jan 1, 2006

  • CIM
    Concentration of Lead-Zinc Ores of Eastern Canada(

    By C. S. Parsons

    Introductory The steady advance in the price of lead and zinc in the metal markets of the world during the past few years has resulted in an active search for new deposits of these metals, and to t

    Jan 1, 1925

  • CIM
    Recent Gravity Improvements at the Porcupine Joint Venture

    By Ron Millions, J. A. Folinsbee, Ishwinder Grewal, Michael Fullam, Don Strickland, Tony Y. Chong

    "Since milling began in 1912, the Dome mill, now part of the Porcupine Joint Venture (PJV), has been expanded several times, the most recent increasing the milling rate from 3,500 to 11,500 tonnes per

    Jan 1, 2004

  • CIM
    Iron Ore Symposium

    By Jean G. Fortin

    The manufacturers' proposed technology has been a key factor in selecting production, mobile and fixed equipment in order to achieve the targets set in our 2026 mining plan. This paper will pres

    May 1, 2007

  • CIM
    The Winning of Clays and Shales

    By J. F. McMahon

    Introduction The greater portion of the information presented in this paper was obtained in the course of an investigation on clay gathering and its cost in the provinces of Quebec and Ontario (1). F

    Jan 1, 1933

  • CIM
    Gold Ore Processing at the Musselwhite Mine - Feasibility, design and Operation

    By Donald Strickland, Peter Kresin, Dave Hall

    "Have your parents or grandparents ever tried to share with you their wisdom and you ignored it because it did not relate to you‘? I have been ignorant and inevitably grew older and wished I had liste

    Jan 1, 1999

  • CIM
    Dynamic Testing of Friction Rock Stabilisers

    A rough simulated borehole has been developed for the installation and dynamic testing of rock bolts a the WASM Dynamic Test Facility. The rough simulated borehole is used for rock bolts that are sens

    May 1, 2009