Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Gold Mine Evaluation Some Evaluation Concepts

    This paper introduces a classification of gold orebodies, and comments on the importance of cutting high grade values, the choice of an appropriate ore reserve method and the necessity for produci

    Jan 1, 1987

  • AUSIMM
    The Cannington Deposit

    By Thomas MJ

    The Cannington silver-lead-zinc deposit is located at latitude 21¦ 52' 9" South, longitude 140¦ 55' 10"" East, on the south-eastern margin of the Proterozoic Mount Isa Block (Figure 1), 135

    Jan 1, 1993

  • AUSIMM
    Management of Mine Water Integrated to Mining Systems

    By Owen D

    A central part of mine planning is to ensure the protection of the beneficial uses of water. Integrated mining software does not generally provide tools to help the mining engineer to achieve this o

    Jan 1, 1995

  • AUSIMM
    Strategic Development of the Stage 5 Pit at Kidston

    The originally estimated mine life at Kidston (starting 1984) was 12 years. Through a continuing process of re-evaluation and improvement in the operation and by expanding the geological knowledge i

    Jan 1, 1994

  • AUSIMM
    Water Management and Water Protection in Coal/Lignite Surface Mining Regions in Europe

    In Europe there are many regions, where coal or lignite is mined with surface methods. In most of these regions coal/ lignite is mined below groundwater table and mining opera- tions require pumping

    Jan 1, 1988

  • AUSIMM
    Adopting Seven-Day Operations at the Hilton Mine

    The number of employees required to operate a continuous operation was determined. The fixed and variable costs of the operation were separated, generally along the lines of labour and stores compon

    Jan 1, 1995

  • AUSIMM
    Meteorological Forecasting of Blast Noise from the Del Park Minesite

    Alcoa of Australia's Western Australian bauxite mining operations in the Darling Ranges, south east of Perth, present major challenges in the control of air blast. The close proximity of rural

    Jan 1, 1982

  • AUSIMM
    Role of On-Line Analysis in Quality Control of Iron Ore

    By P J. Mathew

    Quality and process control in the iron ore industry is based on measurements of ore grade from blast holes through to shiploading. Traditionally this has been carried out using conventional sampling,

    Jan 1, 1998

  • AUSIMM
    The Sherritt Two-Stage Zinc Pressure Leach Process with Hematite Precipitation

    By Masters I. M, Ozberk E, Chalkley M. E

    The integration of iron rejection as hematite with the Sherritt two-stage zinc pressure leach process has been investigated on the laboratory scale. The two-stage pressure leach process is applicabl

    Jan 1, 1993

  • AUSIMM
    The Role of the Western Australian Mining and Petroleum Research Institute with Particular Reference to Research and Development in Mining Engineering

    The Western Australian Mining and Petroleum Research Institute (WAMPRI) was established in 1981 by the Western Australian Government as a funding and co-ordinating Institute to foster research into th

    Jan 1, 1984

  • AUSIMM
    Practical Solutions to Some Grade Control Problems and Why They Work: A Few Case Studies

    Experience in evaluating grade control at operating mines has shown that a number of similar errors re-occur in diverse settings. These can be broadly classed as technical errors, and procedural or gr

    Jan 1, 1993

  • AUSIMM
    Installation of an Automatic Truck Despatch System at Bougainville Copper Limited

    In early 1985, Bougainville Copper Limited commissioned an automatic truck despatch system to control its fleet of 44 trucks and 9 shovels. Productivity gains in the past have been the result of i

    Jan 1, 1986

  • AUSIMM
    Optical Blast Fragmentation Assessment

    By Lyman G. J, Ka

    The use of images to determine blast fragmentation is the only feasible technique when one does not want to disturb the production cycle. However, three major problems exist with the use of images.

    Jan 1, 1990

  • AUSIMM
    The Geology and Geological Practices at the Wiluna Mining Operations, Western Australia

    By Farrelly C. T

    The Wiluna mining operations are centred near the township of Wiluna 750 kilometres north-east of Perth and 600 kilometres east of Geraldton.The Wiluna gold mines produced over two million ounces of g

    Jan 1, 1993

  • AUSIMM
    Summary of Investigations into Appin Colliery Explosion

    At 11 p.m. on Tuesday, 24th July 1979, an explosion of methane gas in a three heading development panel at Appin Colliery resulted in the deaths of fourteen men. The explosion followed after or was

    Jan 1, 1981

  • AUSIMM
    The Rawas Gold Project æSuccessfully Overcoming the ChallengesÆ -- The Task Facing a Junior in Indonesia from Exploration to Production

    By Williams JK, Bolitho BC

    Laverton Gold NL (Laverton) is the first junior Australian mining company to establish a viable mining operation in Indonesia. It successfully commissioned the Rawas plant in Sumatra this year with an

    Jan 1, 1997

  • AUSIMM
    Optimal Resource Utilisation

    By D von Horn

    Mineral sand orebodies are typically mined for their TiO2 content. Increasingly over the past 30 years, the major mineral focus has shifted from natural rutile to ilmenite and an acceptance that the l

    Jan 1, 2001

  • AUSIMM
    Streaming Conditions and Wear of Refractories in the Lower Part of A Blast Furnace

    By Kupper T

    Firstly, electric analog models are discus- sed to show fluid streaming conditions. In these models the depth of blast at tuyere level, the height of the bath, the influ- ence of different angles of

    Jan 1, 1981

  • AUSIMM
    Estimation of High Grade Copper Slope Grades in QTS North, Cobar Mines, Cobar NSW

    By Schofield N. A

    The cross-sectional method of stope grade estimation at Cobar Mines has consistently had several shoneomings, me most imponant of which being mat stope grade is significantly overestimated in the high

    Jan 1, 1993

  • AUSIMM
    A Mathematical Model of the Sirosmelt Process

    By Denholm WT

    A mathematical model has been developed for intense pneumatic smelting processes, such as the Sirosmelt group of processes, to assist in establishing optimum process conditions and to permit oper

    Jan 1, 1984