Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Sinking No. 3 Elliptical Shaft at North Broken Hill Limited Broken Hill, N.S.W.This paper describes the operation involved in the sinking of a concrete-lined elliptical-shaped shaft at North Broken Hill Limited.Major factors such as geological features, future ventilation, ore h
Jan 1, 1956
-
Atomic Force Microscopy ù A New Characterisation Tool for Flotation ResearchBy B M. Moudgil
Atomic force microscopy (AFM) has become an important tool for understanding the nano- to molecular scale mechanisms predominant in multiphase systems. In flotation research, the use of AFM holds pro
Jan 1, 2005
-
When Does Further Processing at the Mine Site Make Sense?By G Lane, S La Brooy
A century ago, new mines were often accompanied by smelters. In Australia, smelters were built at the Daydream mine near Broken Hill, at Kuridala and Mount Elliott near Mount Isa, Broken Hill, Mount L
Jan 1, 2008
-
Dewatering Marra Mamba – Lessons LearnedBy K Sommerville
BHP Billiton’s Area C iron ore operation has been in production since 2003. During 2010, below water table mining in the Marra Mamba formation commenced and dewatered ore has been successfully process
Jul 11, 2011
-
Internalising Environmental Management - Bringing the Environment into ManagementThe mining industry was one of the first industry groups to be confronted by and to respond to public and government pressure to improve its environmental management. Companies operating in New Zea
Jan 1, 1991
-
A Facies Model for an Active Composite Volcano: Ruapehu, New ZealandBy Houghton BF
Ruapehu is an extremely active andesitic composite volcano, built in at least four cone- building episodes over the last 250 ka. The volcano was constructed by a variety of extrusive and subplinian
Jan 1, 1987
-
Liberated 0 - 10 ¦m Particles From Sulfide Ores, Their Production and Separation ù Recent Developments and Future NeedsThe general types of industrial behaviour of liberated valuable sulfide minerals in the 0 - 10 ¦m size fraction are described and tests to explore on site at a concentrator the general nature of any d
Jan 1, 2005
-
In-pit backfilling as part of integrated life-of-mine waste scheduling, closure planning and AMD risk management – Martabe Mine as a case studyBy K Grohs, A Satriawan, S R. Pearce
Martabe gold and silver mine is operated by PT Agincourt Resources (PTAR) and is situated in northern Sumatra and comprises several deposits in steep terrain, and in a tropical climate, that are requi
Aug 2, 2023
-
Applying Controlling Blasting to Minimise the Damage at the Water Dam Ramp 23 at Ensham ResourcesBy I Villalba
The need to continue the development of the Ensham mine has led to blast up to 75 m to the Eastern side of a water dam in the vicinity of Ramp 23. The water dam wall is exposed to blasting over a
Nov 8, 2011
-
Advancement in experimental methodologies to produce phase equilibria and thermodynamic data in multicomponent systemsBy E Jak, M Shevchenko, D Shishin
One of the key aspects to develop sustainable metallurgical production is to ensure that the predictive power of thermodynamic tools is brought up to a new level of accuracy and reliability. Exploring
Aug 21, 2024
-
Water Systems for Distributing Cooling in Deep South African Gold MinesBy De Carvalho J
The average installed refrigeration capacity on South African gold mines has increased by about eighteen per cent annually for the past 15 years; both the number of installations and their duties h
Jan 1, 1988
-
The Use of Blasting Models for the Optimisation of Mine ProductivityBy Paine GG
In coal mining each of the unit operations are interrelated with each preceding operation having an effect on subsequent operations. This presents difficulties for determining when the lowest overa
Jan 1, 1987
-
1991 New Zealand Branch Annual Conference û Appendix1991 New Zealand Branch Annual Conference û Appendix
Jan 1, 1991
-
Mass Transfer Studies for a Pulsed Disc and Doughnut Extraction ColumnBy H R. C Pratt, G W. Stevens
Hydrodynamic and mass transfer performance are presented for a 72.5 mm diameter pulsed disc and doughnut column of the type used by Western Mining Corporation, Olympic Dam Operation, for the extractio
Jan 1, 2000
-
High Intensity Reactor Systems for Smelting of Base and Precious MetalsThe factors affecting performance of base and precious metal smelting and converting processes are considered in relation to reactor characteristics. The chemical differences between processes are rel
Jan 1, 1992
-
Remote Sensing: A Cost Effective tool for Environmental Management and MonitoringBy Cottrell EC
Remote sensing has been used for many years but until recently its application has been limited by the resolution of the data available. High resolution airborne multi-spectral scanner data (MSS)
Jan 1, 1987
-
Artificial Neural Network Approach for Evaluation of Weight of Fallen ObjectsBy D F. Akhmetov, M Yasuike, M Komazaki, Y Kawa
Remote monitoring of geological situation at distant regions with complicated relief, including reliable detection of the rock falls and estimation of the scale of accidents, is of great importance fo
Jan 1, 2003
-
Developments in Geophysics for Prediction of Structures Influencing Production in MinesIn both surface and underground coal mines, the detection of geological structures ahead of workings is recognised as being fundamental to the efficient operation of the mine. Mining into zones of
Jan 1, 1988
-
Planning, Investigation and Preliminary Design for the Eastern Distributor Tunnels - SydneyBy Chappel R. A, Fishburn B. R
The Eastern Distributor Tunnels - the first major road tunnel project in Australia - are the preferred solution to traffic congestion problems, when compared with alternatives, in this inner urban
Jan 1, 1987
-
Modern Management Systems for Higher Margins (9e634b58-ddc4-405d-b601-7ec0179e347f)Maximising margins in today's competitive international commodity markets demands superior productivity. This requires more than selecting the best equipment. It requires continually improving th
Jan 1, 1998