Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A New Approach to Planning New Coal-Fired Power Stations in Developing CountriesBy Walsh V
The Australian economy has been adversely affected by the hesitation in developing countries to commit to the construction of .new coal-fired power stations. World coal trade which was expected to
Jan 1, 1987
-
Overall Concepts in Drilling for Roof BoltingBy Tonegato S, Wood M
The lack of objective data on roof bolting machines, bits, rods and overall system has created the need for an objective assessment of roof bolting. This work outlines a test rig for such objectiv
Jan 1, 1986
-
Chromite for the Production of Chromium ChemicalsBy Lawson F
Chrome chemicals are commercially produced by the alkali roasting of the chrome-bearing ore chromite with sodium carbonate. In order to ascertain the influence on the extent of reaction of the replace
Jan 1, 1984
-
Optimising Moisture Control for Zinc - Lead SinteringBy Bowden MW
Sintering of lead-zinc concentrates is practised by Sulphide Corporation to provide both desulfurised lump sinter feed, for simultaneous reduction to zinc and lead in the Imperial Smelting Process bla
Jan 1, 1985
-
Benchmarking Estimation Methods for Coal Resource EstimationBy G Davies, D Dunn, C Mawdesley, O Bertoli
The coal industry in Australia has been actively working in recent years towards the (re)integration of geostatistical techniques to the process of coal resource estimation. The benefits of using geos
Jan 1, 2009
-
A Laboratory Facility For Testing Cemented FillsThis case study describes various aspects of establishing a laboratory facility for testing chemically-cemented fill materials. The applicability of data obtained from such a facility related to m
Jan 1, 1973
-
Rock-Masses Characterization for Underground Excavation PurposesDuring the development of Lorca tunnel project in the South-East of Spain, an in-site study has been done, with the purpose of obtaining the characteristics of the different lithological units th
Jan 1, 1987
-
Slope Stability Radar for Monitoring Mine WallsSlope stability is a critical safety and production issue for open cut mines. The æslope stability radarÆ has been developed to remotely scan a rock slope to continuously measure the movement of the f
Jan 1, 2003
-
Remote Control Loaders for Longhole Open StopesThe paper is introduced by some general comments on the Electrolytic Zinc Company West Coast Mines operations. An outline of the geology of the Rosebery Mine orebodies preced- es a resume of the min
Jan 1, 1977
-
Mining Design for Deep Open Cut MinesSelection of the mining method and most appropriate mine layout for deep open cut coal mines is discussed, giving particular attention to the types of mines expected to be developed in the future in
Jan 1, 1981
-
Evaluation of Sampling Methods for Industrial SlurriesBy Patridge A. C
A pilot scale laboratory investigation of manual slurry sampling methods representative of those used in the minerals industry is described. Samples were taken from slurries made up from silica part
Jan 1, 1995
-
Direct Force Measurement for Bubble-Particle DetachmentBy R-H Yoon
Increasing the upper particle size limit of flotation would allow operators to increase mill throughput, save operating costs, simplify flow sheets, and increase rate of return. However, coarse partic
Jan 1, 2005
-
Borescope Techniques for Assisting Colliery Roof ControlBy Rixon LK, Walton KP
Evidence will be presented to show that borescope inspection of mine roofs is one of the most useful techniques available for stability assessments. ACIRL currently has four borescopes, comprising
Jan 1, 1986
-
A Fractal Sampling Model for Minerals CommoditiesThe type of population encountered in the sampling of coal, ores and other products of natural phenomena is one in which the variance within a cluster of elements generally increases steadily as the s
Jan 1, 2008
-
Steel Wire Ropes for the Mining IndustryThe subject of steel wire ropes covers such a wide range of points that it would be impossible to deal with it fully in one paper, and in view of the apparent scarcity of published information on the
Jan 1, 1947
-
Blast Profile Control for Dragline Productivity OptimisationAgainst a background of deeper pits, the introduction of prestripping fleets and the need for closer control of operating costs (especially the waste removal component), Australian coal operations uti
Jan 1, 1992
-
Choosing a Water Collector for Matte SeparationBy Robertson GE, McLaughlin JD
An extensive laboratory campaign was conducted to find a suitable water soluble collector to replace diphenylguanidine (DPG) in the matte separation process. The examination of the collectors was do
Jan 1, 1993
-
Microtunnelling Solution for Bulimba Creek Trunk SewerBy A Domanti, C Jewkes
This paper describes the design and constructability issues investigated in the selection of a trenchless solution in comparison to trenched construction options as part of a scoping study for the aug
Jan 1, 2008
-
Activity Models for Pyrometallurgical Processes Using STEPSOLBy Morris A. E
The thermodynamically-based pyrometallurgical simulation software STEPSOL (Version 3.0) provides for the modelling of activities using the Interaction Parameter Model, the Regular Solution Model, th
Jan 1, 1991
-
Due Diligence Requirements for Coal Property AcquisitionBy Jr
This paper provides a comprehensive review of the requirements of a full due diligence study for a coal property acquisition in both text and table format. From the initial scoping of the assignment,
Jan 1, 2003