Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Operation of the South Australian Mining Act

    The new South Australian Mining Act be came operative in July, 1972. It provides appropriate updated legislation covering pro- specting, exploration and development of mining properties. Anomalies i

    Jan 1, 1974

  • AUSIMM
    DeGrussa Copper Mine, Western Australia - Feasibility to First Production: A Case Study in Developing a Working Geometallurgy Model from First Principles

    By P Vass, C Butler, J Condon, B Hooper

    DeGrussa Copper Mine, resource status 10.2 Mt at 5.7 per cent Cu, 2.1 g/t Au (Sandfire Resources, 2013), commenced concentrate production through its 1.5 Mt/a conventional copper flotation processing

    Sep 29, 2013

  • AUSIMM
    Innovation in Haulage and Hoisting

    New and more cost-effective methods of haulage and hoisting will be needed to develop the underground mines of the future. A review of the development of technology since the 1950s shows that once mec

    Jan 1, 2005

  • AUSIMM
    Three-dimensional modelling and analysis of high-speed train-induced building vibration considering different soil types

    By O Kirtel, A A. Faizan

    With the rapid increase and development of high-speed trains (HSTs), the problems such as train-induced ground vibration and its dynamic effects on nearby structures have become a major environmental

    Nov 29, 2022

  • AUSIMM
    Considerations for Design of Production Level Drawpoint Layouts for a Deep Block Cave

    By P Bartlett, K Naidoo

    Premier Diamond Mine is planning a new, mechanised, block cave, with a production level approximately 1000 m below surface. A high degree of tunnel damage is expected, due to stress and the relatively

    Jan 1, 2000

  • AUSIMM
    Methodology for Calculating the Closure Water Balance for an Acid Generating Tailings Impoundment

    By G W. Wilson

    Rehabilitation of tailings impoundments is one of the most challenging aspects in mine closure, as not only does the potential for producing leachate pose a challenge to the rehabilitation designer, b

    Jan 1, 2003

  • AUSIMM
    New Zealand China Clays, a Specialised Market Segment

    Following a period or small-scale activity a joint venture was formed between Ceramco Limited of New Zealand and Georgia Kaolin Company of USA. The initial concept was to process clays for the paper i

    Jan 1, 1984

  • AUSIMM
    Development of a New Dry Density Separator for Fine-Grained Materials

    Development of a New Dry Density Separator for Fine-Grained Materials

    Sep 13, 2010

  • AUSIMM
    Cost-Effective Native Revegetation on Alluvial Tin Mining Sites in the New England Region of New South Wales

    Tin mining has taken place in the New England region of New South Wales since 1872. Until fairly recent times there was little pro- vision made for environmental protection. Mining methods,which in

    Jan 1, 1987

  • AUSIMM
    Project Financing of Australian Resources

    The classic description of Project Finance as "the reliance by lenders on the cashflow of a project, supported by the assets of the project with no recourse to the project sponsor's corporate

    Jan 1, 1987

  • AUSIMM
    The Kharmagtai Porphyry Breccia Complex – Characteristics of Early Carboniferous Porphyry Mineralisation in the Gurvansaikhan Belt, Southern Mongolia

    By A L. Stewart, M Baatar

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation.The Middle Palaeozoic Gurvansaikhan Belt (Southern Mongolia) of the Central Asian Orogenic B

    Mar 18, 2015

  • AUSIMM
    Assessing corrosion of reinforcement on a large scale

    By N Power, R Hassell, E Jones

    Wiluna Mining Corporation are progressively re-entering the old Wiluna underground mining complex. The existing underground was abandoned in 2013 by previous owners and left to flood with water levels

    Nov 29, 2022

  • AUSIMM
    Mining and the Environmental Protection Legislation in N.S.W.

    In September 1980 the N.S.W. Environ- mental Planning and Assessment Act was gazetted. This legislation created a new arena of government involvement in the procedure for obtaining approval to open

    Jan 1, 1983

  • AUSIMM
    Copper Tank House Technology Reviewed and Assessed

    The present practices in electro-refining of copper are shown to be the result of piecemeal and gradual improvements and innovations as metallurgists responded to changing cost pressures and the avail

    Jan 1, 1985

  • AUSIMM
    Chemical Optimisation of Smelting Processes

    By Floyd JM

    Conventional smelting reactor systems were designed to recover only one main element from their feedstocks. They did not possess sufficient flexibility to allow optimisation of co-production of multip

    Jan 1, 1985

  • AUSIMM
    Backfilled Pits – Laboratory-scale Tests for Assessing Impacts on Groundwater Quality

    By C Linklater, J Chapman, A Watson

    Closure options under consideration at some sites include backfilling mined-out pits with waste rock. Backfill may include mineralised and non-mineralised waste rock. Following groundwater rebound, fl

    Jun 28, 2016

  • AUSIMM
    Rscue - Knowledge Based Expert System for Mine Rescue Operations Based on Gas Analysis

    By Baafi EY, MacKenzie -Wood P

    An experienced and reliable knowledge of fire fighting procedures is necessary for mine emergency situations. Since experts in this area are scarce the technology of expert systems lends itself a

    Jan 1, 1988

  • AUSIMM
    Geometallurgical Sampling and Resource Estimation for Magnetite Deposits

    By J N. Farrell

    Metallurgists frequently use a small number of large samples to characterise expected mill performance, with the a priori assumption that these few samples are representative of the entire deposit. Ge

    Sep 5, 2011

  • AUSIMM
    Options for Concentrate Drying Technologies when Designing a Copper Smelter

    By H Lehtonen, H Mansikkaviita

    In primary copper smelters, the received copper concentrate and other materials contain a certain amount of moisture, ranging from six to 14 per cent. Moisture in wet concentrate has a negative effect

    Jan 1, 2006

  • AUSIMM
    The Investigation of High Density and Paste Fills for the Enterprise Mine Expansion Project at Mount Isa

    By K Kuganathan, Y Potvin

    Enterprise Mine at Mount Isa is to expand ore production from the current 1.4 to 3.5 mtpa by mining the 3500 Orebody, from which production is scheduled to start in February 1998 making this the deepe

    Jan 1, 1998