Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Operation of the South Australian Mining ActThe new South Australian Mining Act be came operative in July, 1972. It provides appropriate updated legislation covering pro- specting, exploration and development of mining properties. Anomalies i
Jan 1, 1974
-
DeGrussa Copper Mine, Western Australia - Feasibility to First Production: A Case Study in Developing a Working Geometallurgy Model from First PrinciplesBy P Vass, C Butler, J Condon, B Hooper
DeGrussa Copper Mine, resource status 10.2 Mt at 5.7 per cent Cu, 2.1 g/t Au (Sandfire Resources, 2013), commenced concentrate production through its 1.5 Mt/a conventional copper flotation processing
Sep 29, 2013
-
Innovation in Haulage and HoistingNew and more cost-effective methods of haulage and hoisting will be needed to develop the underground mines of the future. A review of the development of technology since the 1950s shows that once mec
Jan 1, 2005
-
Three-dimensional modelling and analysis of high-speed train-induced building vibration considering different soil typesBy O Kirtel, A A. Faizan
With the rapid increase and development of high-speed trains (HSTs), the problems such as train-induced ground vibration and its dynamic effects on nearby structures have become a major environmental
Nov 29, 2022
-
Considerations for Design of Production Level Drawpoint Layouts for a Deep Block CaveBy P Bartlett, K Naidoo
Premier Diamond Mine is planning a new, mechanised, block cave, with a production level approximately 1000 m below surface. A high degree of tunnel damage is expected, due to stress and the relatively
Jan 1, 2000
-
Methodology for Calculating the Closure Water Balance for an Acid Generating Tailings ImpoundmentBy G W. Wilson
Rehabilitation of tailings impoundments is one of the most challenging aspects in mine closure, as not only does the potential for producing leachate pose a challenge to the rehabilitation designer, b
Jan 1, 2003
-
New Zealand China Clays, a Specialised Market SegmentFollowing a period or small-scale activity a joint venture was formed between Ceramco Limited of New Zealand and Georgia Kaolin Company of USA. The initial concept was to process clays for the paper i
Jan 1, 1984
-
Development of a New Dry Density Separator for Fine-Grained MaterialsDevelopment of a New Dry Density Separator for Fine-Grained Materials
Sep 13, 2010
-
Cost-Effective Native Revegetation on Alluvial Tin Mining Sites in the New England Region of New South WalesTin mining has taken place in the New England region of New South Wales since 1872. Until fairly recent times there was little pro- vision made for environmental protection. Mining methods,which in
Jan 1, 1987
-
Project Financing of Australian ResourcesThe classic description of Project Finance as "the reliance by lenders on the cashflow of a project, supported by the assets of the project with no recourse to the project sponsor's corporate
Jan 1, 1987
-
The Kharmagtai Porphyry Breccia Complex – Characteristics of Early Carboniferous Porphyry Mineralisation in the Gurvansaikhan Belt, Southern MongoliaBy A L. Stewart, M Baatar
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation.The Middle Palaeozoic Gurvansaikhan Belt (Southern Mongolia) of the Central Asian Orogenic B
Mar 18, 2015
-
Assessing corrosion of reinforcement on a large scaleBy N Power, R Hassell, E Jones
Wiluna Mining Corporation are progressively re-entering the old Wiluna underground mining complex. The existing underground was abandoned in 2013 by previous owners and left to flood with water levels
Nov 29, 2022
-
Mining and the Environmental Protection Legislation in N.S.W.In September 1980 the N.S.W. Environ- mental Planning and Assessment Act was gazetted. This legislation created a new arena of government involvement in the procedure for obtaining approval to open
Jan 1, 1983
-
Copper Tank House Technology Reviewed and AssessedThe present practices in electro-refining of copper are shown to be the result of piecemeal and gradual improvements and innovations as metallurgists responded to changing cost pressures and the avail
Jan 1, 1985
-
Chemical Optimisation of Smelting ProcessesBy Floyd JM
Conventional smelting reactor systems were designed to recover only one main element from their feedstocks. They did not possess sufficient flexibility to allow optimisation of co-production of multip
Jan 1, 1985
-
Backfilled Pits – Laboratory-scale Tests for Assessing Impacts on Groundwater QualityBy C Linklater, J Chapman, A Watson
Closure options under consideration at some sites include backfilling mined-out pits with waste rock. Backfill may include mineralised and non-mineralised waste rock. Following groundwater rebound, fl
Jun 28, 2016
-
Rscue - Knowledge Based Expert System for Mine Rescue Operations Based on Gas AnalysisBy Baafi EY, MacKenzie -Wood P
An experienced and reliable knowledge of fire fighting procedures is necessary for mine emergency situations. Since experts in this area are scarce the technology of expert systems lends itself a
Jan 1, 1988
-
Geometallurgical Sampling and Resource Estimation for Magnetite DepositsBy J N. Farrell
Metallurgists frequently use a small number of large samples to characterise expected mill performance, with the a priori assumption that these few samples are representative of the entire deposit. Ge
Sep 5, 2011
-
Options for Concentrate Drying Technologies when Designing a Copper SmelterBy H Lehtonen, H Mansikkaviita
In primary copper smelters, the received copper concentrate and other materials contain a certain amount of moisture, ranging from six to 14 per cent. Moisture in wet concentrate has a negative effect
Jan 1, 2006
-
The Investigation of High Density and Paste Fills for the Enterprise Mine Expansion Project at Mount IsaBy K Kuganathan, Y Potvin
Enterprise Mine at Mount Isa is to expand ore production from the current 1.4 to 3.5 mtpa by mining the 3500 Orebody, from which production is scheduled to start in February 1998 making this the deepe
Jan 1, 1998