Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Tunnelling within the Bunya Phyllite of Legacy Way, Brisbane, Queensland

    By M Norbert, C Bennett

    The Legacy Way Tunnel was constructed from Toowong to Kelvin Grove in Brisbane, and is the first large-scale underground excavation in the Bunya Phyllite in Brisbane. The Legacy Way Tunnel is 4.3 km i

    Sep 17, 2014

  • AUSIMM
    Development and Operation of Loy Yang Open Cut

    By Waghorne E. P

    The State Electricity Commission of Victoria is Australia's largest single coal producer. Approximately 19 Mt of coal will be produced in 1989 from the SEC V's newest mine, Loy Yang Open C

    Jan 1, 1989

  • AUSIMM
    Quantifying Plant Flow Availability for an Alumina Refinery Expansion using Dynamic Simulation

    By B Reynolds

    The process design for green- or brown-fields metallurgical plants typically starts with two fundamental elements: the detailed mass and energy balance and the plant flow availability. The detailed m

    Aug 8, 2011

  • AUSIMM
    The Coal Resources of New South Wales

    THE area of the State of New South Wales is not great, nevertheless it has very large and important Mineral Resources. This is the more noticeable when the values of the annual mineral production from

    Jan 1, 1926

  • AUSIMM
    The role of scale in prediction of mine drainage chemistry

    By N McIntyre, M Edraki, K R. Jain

    From the very early stages of a mining project, there is a requirement to predict the chemistry of potential drainages from various waste storage facilities. However, using relative masses to scale ch

    Aug 2, 2023

  • AUSIMM
    Design of a sintering heat profile for accelerating oxidation of magnetite ore

    By T Takayama, M Matsumura, Y Konno

    The steel industry accounts for 14 per cent of domestic CO2 emission in Japan, and iron ore sintering process occupies approximately three per cent. While Fe content in iron ore is gradually decreasin

    Nov 8, 2021

  • AUSIMM
    Flotation Cell Development

    By G J JAMESON

    The flotation cell has undergone a number of changes since the process was first introduced in Broken Hill in the early years of this century. The development of the mechanical flotation cell is rev

    Jan 1, 1992

  • AUSIMM
    Measuring the Effectiveness of Change through Best Practice Reconciliation

    By G Pattenden, R Hargreaves, P Pettit

    "Even with the cyclic nature of mining, when it comes down to it, the bottom line is that whatever direction the commodity market is going there is always a desire to improve the economics of an opera

    Nov 15, 2016

  • AUSIMM
    A coupled gas flow-geomechanical model based on energy analysis in coal and gas outburst simulation

    By F Soleimani

    Coal and gas outburst is a common hazard in coalmines and due to the complexity of its nature, efficaciously predicting the possibility of its occurrence is intricate. The mechanical and gas flow prop

    Oct 12, 2022

  • AUSIMM
    Research and Application of Total Tailings Backfill at Zhangmatun Iron Mine (163a2830-6e6a-4b23-b34c-e44378a86b18)

    By Aiming Z, Shenyi S, Xialei W

    Zhangmatun Iron Mine is situated in the suburbs of Jinan city. Shandong, China. Because of surface environmental constraints, no suitable site can he selected to dispose of mill waste. The full mill

    Jan 1, 1998

  • AUSIMM
    Leading people to use their brain as PPE

    By C Sylvestre

    Leaders have invested heavily in traditional safety management to improve safety performance over the years. This primarily involved: • fixing the environment (eliminating the hazard) • improving the

    May 5, 2022

  • AUSIMM
    Evaluation of Low Profile Electric Loader in Conjunction with Electric Monorail Haulage System in Narrow Vein Mining

    By B Besa, E K. Chanda

    It has long been recognised that narrow vein mining needs innovative approaches to mine access and mining methods in order to improve the economics of this vital part of the mining industry. The minin

    Mar 26, 2012

  • AUSIMM
    From Blasthole to Reverse Circulation Sampling – Changing Grade Control Methods at Black Star Open Cut Zinc-Lead Mine, Mount Isa, Queensland

    By B Young

    Variable bench heights, interaction with underground workings and a steeply dipping orebody are challenges faced daily by geologists at Xstrata Zinc’s Black Star Open Cut (BSOC) Zinc/Lead/Silver mine

    Aug 22, 2011

  • AUSIMM
    Sustainability in Mining Engineering - Strategies Through Education and Research

    By A J. Gunson

    The Norman B Keevil Institute of Mining Engineering, or the Department of Mining Engineering (the Department), at CanadaÆs University of British Columbia (UBC) is addressing the integration of sustain

    Jan 1, 2009

  • AUSIMM
    Investigation of flotation behaviours of fine particles in a complex ore consisting of various copper minerals

    By K Aikawa, M Ito, K Mitsuhashi, Y Ebisu, J V. Satur, I Park, N Hiroyoshi, T Suto

    Copper concentration using flotation is becoming more difficult, because of an increase in ore complexity accompanied by smaller grain sizes of copper minerals than usual, requiring finer grinding in

    Aug 24, 2022

  • AUSIMM
    Investigation of the Process of Cobalt and Nickel Sulphation from Pyrite Concentrate and Nickel Matte

    By Abishev D. N, Balakirev V. F, Davydov G. I

    The problem of recovery of cobalt products from poorly oxidised nickel ores (Kempirsaisk deposit) and pyrite concentrates with a low content of cobalt (Sokolovsk-Sarbaisky deposit) has not been sol

    Jan 1, 1996

  • AUSIMM
    An approach to the calibration and validation of transfer chute DEM simulations handling cohesive iron ore fines

    By T Walkemeyer, R Elliott, D Chang-Martin

    Over the past decade, discrete element method (DEM) simulations have seen increasing adoption by the resources sector to inform the design of materials handling equipment such as transfer chutes, bins

    Sep 18, 2023

  • AUSIMM
    Chain Pillar Design ù Can We?

    By H Jalalifar, N Aziz

    In the ten years since the University of NSW proposed a pillar design methodology for bord and pillar operations, the Australian coal mining industry has changed substantially. What was primarily a bo

    Jan 1, 2005

  • AUSIMM
    Stable Isotopes and Ore Fluid Chemistry of Gold Mineralisation at Waitangi Deposit, Thames District, Coromandel Peninsula, North Island, New Zealand

    By C G. Ryan, D R. Cooke

    The Thames gold-silver deposits are part of the Hauraki goldfield, situated within the Miocene to Pliocene calc-alkaline Coromandel Volcanic Zone (CVZ). The Waitangi vein system is one of the minerali

    Jan 1, 1999

  • AUSIMM
    Large Compact Bucket Wheel Excavators

    Most compact bucket wheel excavators in use are in the small to medium range. Large compact bucket wheel excavators compete directly with con- ventional longer boom excavators which have operational

    Jan 1, 1989