Applying control frameworks to enhance vehicle interaction technology outcomesBy P Standish
Qualitative risk assessment methods are not well suited to considering complex systems and potential interactions of new technology. As part of supporting tier one mining organisations and internation
Jun 22, 2022
-
Risk-Based Ore Selection from Conditionally Simulated Block ModelsBy J E. Everett, F Grobler
This study considers realistic data for a planned open pit iron ore mine, but is applicable to any open pit situation. By interpolating drill hole data, grades are generated for a rectangular block mo
Aug 12, 2013
-
A practical approach to improve investigations and identify systemic organisational issuesBy M Alston
Many organisations struggle to yield meaningful outcomes from incident investigations. This paper will demonstrate that we can discover systemic issues by rethinking the ‘Why’ and ‘How’ of investigati
Apr 16, 2024
-
Full-round Numerical Modelling of a Macro Synthetic Fibre Reinforced Tunnel Boring Machine Tunnel in the Shanghai Metro ExtensionBy L Nagy, K P. Juhasz
The authors were engaged to optimise a traditional rebar cage reinforced concrete segmental lining by means of finite element analysis (FEA) using macro synthetic fibres for the Shanghai metro extensi
Sep 17, 2014
-
Towards the Elimination of Conventional Surface Slurried Tailings Storage FacilitiesBy D J. Williams
The approach to the disposal and storage of mine tailings is slowly evolving. Tailings disposal has been based on minimising short-term capital and operating costs, with rehabilitation costs discounte
Jul 27, 2015
-
Raisebore drill string recovery case studyBy M Andrew, D McTiffen, M Adams
A major Ventilation Upgrade Project commenced at the Fosterville Gold Mine (FGM) in 2017 to service the ongoing ventilation requirements of the underground mining operation. The project consists of th
Mar 15, 2021
-
Super-Scavenging of zinc Residue by the FASTFLOT Process at Pasmico Mining, Broken HillBy Fickera M. A, Marshall S, Burgeese F. L, Burgees J, Estrina H
A new high intensity flotation process FASTFLOT was deployed to recover residual zinc from the zinc circuit tailings at Pasminco Mining's Concentrator, Broken Hill. Performance of the FASTFLOT
Jan 1, 1995
-
Design and Specification of Permanent Shotcrete Tunnel LiningsBy D Mather
Fibre reinforced shotcrete has long been accepted as temporary ground support in both mining and civil tunnel linings. Greater knowledge and understanding of shotcrete as an engineering material and a
Mar 8, 2011
-
Development of the Ernest Henry Underground Mine – The Challenges and the SolutionsBy T Purvis
Xstrata Copper is extending the Ernest Henry Mine with a 6 Mtpa sub-level cave (SLC) mine being constructed under the pit. The SLC mine will maintain the EHM operation until 2024 after the pit is comp
Mar 21, 2011
-
Design of Segmental Lining for Waterview Project, Auckland, New?ZealandBy S Pradhan, A Kuras, R Mahajan
This paper describes the design of the precast concrete segmental lining for the 13.1 m internal diameter and 450 mm thick, 2.4 km long mainline tunnels for the Waterview Connection project in Aucklan
Sep 17, 2014
-
Petrographic and Mineralogical Factors Affecting Gold Recovery at Macraes Flat, Eastern Otago, New ZealandBy D Craw, P V. Angus
Gold mineralisation at Macraes occurs as late quartz-carbonate veins within a body of sheared and hydrothermally altered Otago Schist, the Intrashear Schist. The alteration is characterised by the pre
Jan 1, 1999
-
Continuous Remote Emissions Monitoring – The Lynchpin for Air Quality ManagementBy F I. Cox, D Peeler, T Bodisco
"Diesel particulate matter (DPM), in particular, has been likened in a somewhat inflammatory manner to be the ‘next asbestos’.From the business change perspective, there are three areas holding the in
Mar 24, 2014
-
Long-Term Water Management - The Forgotten Legacy of Mine ClosureBy G Byrne
Long-term water management is typically ignored in mine closure planning. A review of 73 mine closure plans dating from 2007 to 2013 shows that, on average, relinquishment is proposed to be achieved i
Nov 26, 2013
-
An Open Pit Multistage Mine Production Scheduling Model for Drilling, Blasting and Excavating OperationsBy S Q. Liu, E Kozan
This paper proposes a new multiresource multistage scheduling problem for optimising the open pit drilling, blasting and excavating operations under equipment capacity constraints. The flow process is
Nov 24, 2014
-
Case Study – Application of RISKGATE to Managing Strata Failure in an Australian CoalmineBy J Harris, J Turner, P Kirsch
Coal mining is recognised globally as a hazardous activity, and as a result operates under high levels of regulatory and public scrutiny while managing a workforce operating in a high-risk environment
Nov 5, 2014
-
Capital Expenditure Modelling for Strategic Mine SchedulingBy L Blackwell
Strategic mine scheduling is an industry best practice for increasing the long-term value of mining operations and supply chains. The application of optimisation technology such as mixed integer linea
Nov 24, 2014
-
Impacts of thrust faulting at Goonyella Riverside MineBy H S. Pescini
A material aim when feeding ore blends into a processing facility is to reduce the variability of the properties of the feed material and to maximise the output, or throughput. At the Mining Geology c
Mar 22, 2022
-
Material handling testing and control system requirements for dry stack tailingsBy R Stefansen, T Wisdom, A Nicholson, K Rahal
The challenges of increasingly scarce water resources and the risk of dam failures has seen the mining industry turn to sustainable tailings management solutions such as dewatering and dry stacking. F
Jul 23, 2018
-
Developing Assessment Methods and Remediation Protocols for New Zealand Sites Impacted by Acid Mine DrainageBy A Black, A de Jo, J Cavanagh, J Harding
Acidic and metal-rich waters have been discharging from Sullivan Mine, West Coast, New Zealand since the closure of the mine during the early- 1990s. This has resulted in a decrease in pH from a backg
Jan 1, 2003
-
Ventilation Surveys and Model Building - A ConsultantÆs OpinionBy J Rowland
"This paper was primarily put together in order to demonstrate what are believed to be acceptablestandards, in relation to ventilation surveys and the subsequent model assembly process. Thiswas brough
Jun 1, 2012