Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Structural Evolution of the McArthur Basin, NTBy K A Plumb
New structural studies in the Walker Fault Zone of eastern Arnhem Land are integrated with basin-wide reconnaissance observations, made to refine models for the structural evolution of the McArthur
Jan 1, 1994
-
Legacy tailings dam closure with a bituminous geomembrane coverBy M Medina, J Alexander, R J. Longey
Capricorn Copper Pty Ltd (CCPL) are operating the Capricorn Copper Mine located at Gunpowder, Queensland. As current holder of the environmental authority for the site, CCPL have obligations to rehabi
Jul 1, 2021
-
Enhancing crushing plant safety – a technical overviewBy J Dyt, S Lyons
In the mining industry, crusher-related incidents have led to 15 reported deaths in Australia, New Zealand, and the USA between 1998 and 2007 (NSW Government Resources Regulator, 2024). The majority o
Apr 16, 2024
-
Phase diagram of V2O3-FetO-SiO2-CaO(15 mass%) system at 1623 KBy Q Shu, T Deng, B Yan, B Song, D Wang
In view of the lack of phase equilibria data of vanadium-bearing oxide system and the desirability of them for design or optimisation of vanadium extraction process, the phase equilibria relationships
Aug 21, 2024
-
Roof characterisation for hazard planning at Oaky North mine using geophysical dataBy B Vorster, T Medhurst, A Huey
Roof conditions at Oaky North Mine can be prone to stress related damage and/or time dependent degradation. The ability to identify these areas prior to mining has proved challenging using traditional
Nov 29, 2022
-
The Argentine Pyroclastic LoesBy Pati±o A
The Argentine pyroclastic loess arevulcanogenic deposits, which have their sources in the circumnpacific rim. The object of this work is to realize a de-tailed mineralogical characterization of this s
Jan 1, 1990
-
Maximising asset value through optimal block by block decisions on marginal materialBy F Phillips, E Deucker, J Kato
It is challenging to determine the optimal mining strategy to maximise value when a mine plan includes mineralised material which does not meet the full cost of mining but has value exceeding the vari
Mar 15, 2021
-
Quality Sampling Using Coiled Tubing Drilling in Deep Mineral ExplorationBy V Rasouli, G Cavanough, A Mokaramian
The sampling time, the costs and its quality are the three factors that determine the best method of drilling in mineral exploration. The two principal methods of reverse circulation (RC) and diamond
Aug 21, 2012
-
Cities as Mine Sites of the FutureBy M Warnken
Major cities are not only the focal point for AustralianÆs work, leisure and homes, they also are the focal point for the flow of resources into the built environment, motor cars and transportation an
Jan 1, 2006
-
Investigation of silica reduction effects on HPGR operation condition in case of iron ore increasing specific surface areaBy M Saghaeian, M Zare, V Sheikhzadeh, R Hejazi
High-Pressure Grinding Roll (HPGR) is one of the efficient methods for increasing the specific surface area (SSA) of iron ore concentrate for pellet feed production. HPGR grinding mechanism implies th
Aug 24, 2022
-
Implementing a New Heuristic Approach to the Underground Mine Stope Layout ProblemBy M W. A Asad, E Topal, D S. S Sandanayake
Underground mine planning requires an optimal stope layout as a prerequisite for the definition of an optimal production schedule. The procedure to generate an optimal stope layout considers an orebod
Nov 24, 2014
-
Preconcentration in the pit – size mattersBy T BoBo, D La Rosa, P Cameron
Efficient pre-concentration using natural and induced deportment starts with effective blast design. Leveraging these characteristics using Size-Based Grade Engineering® techniques requires detailed u
Nov 10, 2020
-
Perspectives on the Long-term Outlook for Iron OreBy J P. Barkas
World demand for iron ore is far from peaking, and the substantial price decline that has captivated commentators since early 2014 is not the result of widespread misreading by producers of the prospe
Jul 13, 2015
-
Integrated Optimisation of Grinding and Flotation CircuitsBy P Holtham, K C. Runge, E Tabosa
Traditionally, comminution and flotation have been surveyed, analysed and optimised separately. This often results in less than optimal outcomes because of the complex interactions between the two pro
Sep 1, 2014
-
Maximising Value Through Maintaining Your Flotation EquipmentBy B Murphy, S O’Connell, J L. Heath
In the 1989 best-seller The 7 Habits of Highly Effective People, the author, Stephen Covey, highlights the importance of maintaining not only ‘production’, but also, ‘production capacity’. When operat
Sep 1, 2014
-
Multicomponent modelling and simulation of the Minas Rio iron ore grinding circuitBy T M. Campos, J Silva, L M. Tavares, J Lichter, L P. Alves, B K. N Rocha, H D. G Turrer
The depletion of the richest ore deposits and the increase in number of mining projects involving deposits with complex mineralogy, higher competence and lower grade has led to an eminent need for imp
Aug 24, 2022
-
Underground rock bolt detectionBy B Liu, W J. Zhang, S Saydam, B Li
Rock bolts are commonly used to reinforce ground in underground mining and civil tunnel environments. Rock bolts serve two main functions: i) they suspend large, loose blocks of ground, and ii) provid
Nov 29, 2022
-
Reduction in Diesel Particulate Matter at Oaky NorthBy A Melloy, D Holt, M Jurak
Oaky North is AustraliaÆs highest producing underground coal mine. In 2011, the mine produced 8.7 Mt of high-quality coking coal. The high quantities are a result of the constant strive for optimising
Jul 1, 2013
-
Data Collection and Analysis for the George Fisher Project, Mount Isa, QldBy S Versace, D Arnott, D Bojcevs, A Shaw
The George Fisher deposit is a significant sediment hosted silver-leadzinc resource located 2 km north of the Hilton Mine in NW Queensland. The George Fisher feasibility project involved the completio
Jan 1, 1998
-
Closure Cost Estimation - All Things to All Men?By H Jones
Closure cost estimates may be generated at any stage of a mining operationÆs life; commencing with the initial prefeasibility studies and continuing through to the final decommissioning cost estimates
Nov 20, 2012