Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Remnants of Ancient Australia in Vanuatu – Implications for South-west Pacific Tectonics and Mineralisation PotentialBy S W. Richards, J Buys
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Magmatic arcs are prime targets for porphyry- and epithermal-style mineral deposits, althou
Mar 18, 2015
-
Exploration advances – MinEx CRC’s missionBy D Giles, A C. Bailey
In the first 20 years of the 21st century, just over 20 per cent of Australian mineral exploration expenditure was dedicated to iron ore, totalling >A$8 billion and >30 million metres of drilling (Aus
Nov 8, 2021
-
An Advanced Modelling Technique for Scale-Up of Batch Flotation Results to Plant Metallurgical PerformanceBy O N. Savassi
A rigorous methodology for prediction of flotation plant performance is presented, which is based on a standardised batch flotation test called the MFT. The work is part of the FLEET program, develope
Jan 1, 2005
-
Application of Geographical Information System to Mineral Exploration - a 'Weights of Evidence' approach using Misima Island, Papua New Guinea as a Case StudyBy Bure R
Approximately 2.4 million ounces of gold and 11.3 million ounces of silver have been produced from the Umuna Lode by Misima Mines Pty Limited between June 1989 and the end of Decemeber 1996. Reserv
Jan 1, 1997
-
Inclusion of Safescape Laddertube to enhance emergency egress in ventilation shaftsBy B Murphy
Safescape Laddertube provides an improved system for emergency egress in ventilation shafts. The addition of Laddertube in a rise has very little impact on ventilation flow, studies have indicated th
Oct 12, 2022
-
Surface-to-inseam (SIS) Drilling at Oaky Creek Coal Mine – SIS Design Aspects and Drilling EnvironmentBy E Corpuz, J Weissman, S Winter, R Evans
The surface-to-inseam (SIS) directional drilling technique has been utilised at Oaky Creek Coal for more than a decade to predrain both the Oaky No 1 and Oaky North mining areas. The cumulative drilli
Aug 31, 2015
-
The Sams Creek Peralkaline Granite Hosted Gold Deposit, Northwest Nelson, New Zealand ù A New Variant on Alkaline Intrusion-Related Gold DepositsBy K Faure
At Sams Creek a peralkaline granite porphyry dyke hosts gold-bearing sulfide-quartz-siderite veins. The granite dyke intrudes Ordovician-Silurian metapelite and quartzite, and has thin lamprophyre dyk
Jan 1, 2004
-
An Investigation of Current Flotation Survey SamplingBy D Laskovski, T Nguyen
Flotation surveying can be an extremely powerful means of determining opportunities for circuit optimisation and benchmarking. The type of survey employed depends heavily on the nature of the informat
Jul 29, 2014
-
Improving Energy Efficiency Across Mineral Processing and Smelting Operations - A New ApproachBy B L. Coulter, E Wightman, A S. Burrows
With their commitment to sustainable development in an increasingly carbon-constrained world, many resources companies are focused on reducing the energy required to create their final products. In pa
Jan 1, 2009
-
Designing Energy Efficiency Assessments that Work - Thiess Australian Mining û Case StudyBy P Crittenden
Thiess Pty LtdÆs Australian Mining business unit used 7.6 PJ of energy in the 2007/2008 financial year. This represented more than 85 per cent of Thiess Pty LtdÆs total energy use and therefore meant
Jan 1, 2009
-
Optimum embankment design for a tailings damBy A Fyans, B Ghahreman-Nejad
This paper discusses the method and results of an options study into selection of the optimal form for a 130 m high tailings/water retaining dam, located in a region of high seismicity in central Iran
Jul 23, 2018
-
Tailing Thickener Operability and Control Improvements at ProminentáHillBy J Lombardi, M Weidenbach
"OZ MineralsÆ Prominent Hill copper-gold concentrator is located 650 km north-east of Adelaide, 130 km north-east of BHP BillitonÆs Olympic Dam operation and 130 km south-east of the regional township
Oct 29, 2012
-
The Evolution of Diamond Drilling Practices at Olympic DamBy J Taylor, A Dubowik
To increase the efficiency and improve the quality of diamond drilling at Olympic Dam, mine geologists have adapted and modified common practices in order to overcome the challenges imposed by such a
Aug 18, 2014
-
Characterising the Reasons for the Difference in Performance of Two Ore Blends in Early Processing at OZáMinerals Prominent Hill OperationBy D J. Bradshaw, E M. Wightman, C L. Evans, B Triffett
During the commissioning phase of Prominent Hill, periods of reduced recovery were experienced with higher-grade ore blends. This was unexpected and as part of the process to identify the cause, surve
Oct 29, 2012
-
A Review of Processing at the Cannington Ag/Pb/Zn MineBy G Clarke
Commissioning of the Cannington processing plant began in October 1997. The nameplate capacity (of 1.55 million tonnes of ore per annum) was achieved relatively quickly. Since then (like many mines) t
Jan 1, 2007
-
Maximising resource utilisation in South Africa – the BIF storyBy A Singh, C Da Corte
Banded Iron Formations or more commonly known as BIF are sedimentary rock formations with alternating silica-rich layers and iron-rich layers that are typically composed of iron oxides (hematite and m
Nov 8, 2021
-
The Protection of Surface Ventilation Fan Installations from Underground ExplosionsBy R Bourcier, T Rafferty
Following an underground coal mine explosion, it is important that ventilation is quickly restored to ventilate the mine and affect a mine rescue. To achieve this, surface ventilation fans must be sui
Jul 1, 2013
-
Automated Mineralogy for Ore Characterisation and Plant OptimisationBy Y Gu, R Fandrich
Traditionally, characterisation of the mineralogy and textures of ore and rock samples were based on observations of hand specimens and thin sections using an optical microscope. The extent of the dat
Jan 1, 2007
-
Improving Excavation Efficiency at the St Helena Tunnel Using Best Practice Drill and Blast TechniquesBy D Miller, M Dowling, R Domotor
"This paper is focused on blasting activities undertaken as part of the Pacific Highway Upgrade – Tintenbar to Ewingsdale – project (T2E). This is a ‘priority 1’ Pacific Highway road construction proj
Sep 17, 2014
-
Bias Testing of Mechanical Sampling Systems for Coal - A Review of Test Results and Call for Use of Multivariate Statistical AnalysesBy C D. Rose
A review and summary of the results of 120 coal sampling system bias tests is presented. This review supports new methodology using multivariate statistics currently being considered by ISO TC27 SC4.
Aug 21, 2012