Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The development of DRI pellets for green steelmaking

    By C R. Ure

    To substantially reduce, if not eliminate, carbon dioxide (CO₂) emissions from ironmaking it is necessary to convert from blast furnace (BF) ironmaking using coking coal as the reductant to direct r

    Sep 18, 2023

  • AUSIMM
    Sensor-based particle sorting: technical and economic evaluation of the applicability in a zinc ore mine

    By P Esteves, J L. Bechir, R Galery, C Senna, V Souto

    The current moment experienced by the mineral industry is marked by a series of economic, social and environmental challenges. Among the main challenges, it is important to highlight the decreasing in

    Nov 10, 2020

  • AUSIMM
    Does process control sampling always have to be a compromise?

    By M Singh, R C. Steinhaus, J J. Rust

    Metallurgical process control systems in mineral plants often employ state-of-the-art monitoring analysers in an attempt to optimise plant operations and enhance mineral recoveries. These systems are

    May 9, 2017

  • AUSIMM
    Positive influence of WHIMS concentrate on the sintering performance of Roy Hill fines

    By S Hapugoda, J R. Manuel, X Cao, B D. McDonald, N A. Ware, L Lu

    Roy Hill is a large iron ore mining, processing, railing and port operation in the Pilbara region of Western Australia. Since delivering its first shipments to customers in December 2015, Roy Hill has

    Nov 8, 2021

  • AUSIMM
    Quantifying Uncertainty in a Narrow Vein Deposit – An Example from the Augusta Au-Sb Mine in Central Victoria, Australia

    By A Fowler

    The unpredictability of the location, grade and width of narrow-vein deposits presents difficulties for mine geologists and engineers attempting to estimate, schedule, forecast and mine their deposit

    Aug 22, 2011

  • AUSIMM
    Design of raise caving operations in LKAB mines

    By T Ladinig

    Raise caving is a novel cave mining method, which has been proposed for mass mining at increasing mining depths in LKAB operations. The method makes use of the raise mining technology and an active st

    Mar 29, 2023

  • AUSIMM
    The VALMIN Code and Tenure Compliance – Not Just a List

    By J Evans-Wheeler

    "The mandate of the 2005 VALMIN Code to provide ‘(all) reliable, thorough, understandable material information required by investors and their advisers when making investment decisions’ requires that

    Mar 8, 2016

  • AUSIMM
    Looking for an Adequate Drilling Spacing and Heterotopic Sampling û An Iron Ore Example

    By D T. Ribeiro, J F. C L Costa, J C. Koppe

    Drilling and sampling are responsible for most of the costs during mineral exploration, especially in multi-elements and polymetallic deposits, such as iron, manganese and bauxite deposits. On these d

    Sep 26, 2011

  • AUSIMM
    Development of a Pyrite Regrind Circuit at Telfer Gold Mine

    By D R. Seaman, Y Peng, F Burns, D J. Bradshaw

    Telfer Gold Mine is a gold-copper mine in the eastern Pilbara of Western Australia, owned and operated by Newcrest Mining Limited. TelferÆs ores are processed by a dual train, 21 Mt/a, concentrator wh

    Oct 29, 2012

  • AUSIMM
    Brisbane Airport Link Earth Pressure Balance Machine Two Component Tailskin Grouting – A New Australian Record

    By A Reschke

    The Thiess John Holland Group is undertaking the design and construction of Brisbane’s Airport Link Project, the largest single investment in transportation infrastructure in Australian history. Twin

    Mar 8, 2011

  • AUSIMM
    The Casposo Gold-Silver Project – Process Selection and Design

    By D Connelly

    Silver and gold bearing ore from the Troy Resources NL Casposo Gold-Silver Project, located within the San Juan Province of Argentina contains a complex mix of gold, silver, electrum and silver sulphi

    Aug 8, 2011

  • AUSIMM
    Of Detritals, Derivatives and Determination ù An Example of Detrital Iron Discovery

    By P J. Hawke, M F. Flis

    The Hamersley Basin of Western Australia holds significant tonnages of detrital iron deposits. Formed by a cyclic weathering and eroding sequence of nominally barren banded iron formation, they may fo

    Jan 1, 2002

  • AUSIMM
    Risk management for minesite closure planning and execution – start now! Lessons from the closure of the Leigh Creek Coalfield, South Australia

    By A Querzoli, B Williams

    In late 2014 the Flinders Power Management Team was executing business improvement plans to ensure continued electricity generation until 2028 and beyond. Six months later, in June 2015, the Board ann

    Jul 25, 2018

  • AUSIMM
    A Paradigm Shift in Underground Raisebore Reamer Removal

    By P Viljoen, A Holland, C Parken

    In the raisebore industry, there are two known methods of removing large diameter reamer heads once the reaming of an underground shaft is complete: 1. Lower the reamer head to the base of the shaft a

    Mar 15, 2021

  • AUSIMM
    Case study – Ernest Henry Mine: designing step out zones in an inclined sub-level cave

    By P Nichols, C te Kloot, A Harrison

    Ernest Henry mine (EHM) is a sub-level caving operation located in north-west Queensland, Australia. Located below a previously mined open pit, the underground operation ramped up production to 6.8Mt/

    Nov 21, 2018

  • AUSIMM
    Conveying of Paste Backfill ù Focusing on Zero Harm on the Environment at Cannington

    The BHP Billiton Cannington Mine uses paste as the principal method of backfill. The paste consists of mine tailings and cement. The pastefill process at Cannington includes a surface plant where the

    Jan 1, 2002

  • AUSIMM
    Benefits Related to Applications of a Mass Blast in Open Cut Mining

    By C Muñoz, N Ortega, J Vergara, D Avilés

    Mass blasts have been the subject of extensive studies because of their potential benefits in mining operations. However, it has not been possible to advance due to the paradigm that states that the b

    Aug 24, 2015

  • AUSIMM
    Optimisation of cemented rock fill strength for open stope support

    By J Player, R de Vries, E Villaescusa, H Saw, R Hassell

    The use of cemented rock fill (CRF) for support of open stope walls has increased in the Australian underground mines operations over the last five years due in part to its low capital cost. In open s

    Oct 16, 2017

  • AUSIMM
    The Influence of Liner Wear on Milling Efficiency

    By P Toor

    Due to the high energy consumption of milling, it is desirable to improve the efficiency of this process. One alternative to reduce energy and material consumption while optimising production yield in

    Aug 8, 2011

  • AUSIMM
    Phosphorus distribution behaviour in hematite ore reduced in CO-H2 gaseous atmosphere

    By E K. Chiw, S-M Jung, S M. Masuka, ika

    The world reserves of high-grade iron ore have depleted necessitating the need to utilise any existing natural iron ore deposits to meet the demands of the world’s expanding economy using hydrogen in

    Sep 18, 2023