Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Precision Analysis of Iron Ore Sampling, Preparation and Measurement -Overcoming Deficiencies in the Current Standard ISO 3085

    At Cliffs Natural Resources Ltd (CNR) crushing and shipping sample stations, precisions are estimated for the sampling, preparation and measurement stages of iron ore sampling in accordance with ISO 3

    Mar 1, 2010

  • AUSIMM
    Beyond NPV - A Review of Valuation Methodologies and Their Applicability to Water in Mining

    By D Brereton, C J. Moran

    In this era of rising focus on the social and environmental costs and benefits of mining operations, the valuation methodologies used to assess such impacts become increasingly important. Within an in

    Jan 1, 2006

  • AUSIMM
    The Application of Rock Stress Inputs to Stability Assessments at Ok Tedi Mine, Papua New Guinea

    By K W. Mills, N R. P Baczynski, J Mylvaganam, D A. Prado, M F. Lee, I A. de Bruyn

    "This paper presents the second part of a study of the assessment of rock stress inputs on the performance of various new mining designs at the Ok Tedi large open pit mine in Papua New Guinea. Over th

    Nov 5, 2014

  • AUSIMM
    Olympic Dam open stope observations, tactics and characterisation

    By G Capes, L Morizzi, N Mitkas, E Jones, D Grant

    This paper describes the mining setting for the sub-level open stoping (SLOS) mining method used at Olympic Dam (OD), and investigates the range of stope performance conditions encountered over 30 yea

    Mar 15, 2021

  • AUSIMM
    Updraught Sintering

    By Green A. D M

    The establishment of the Imperial Smelting Furnace at Sulphide Coporation Pty. Limited for the smelting of zinc and lead made it necessary to design and install sintering capacity to produce approxima

    Jan 1, 1964

  • AUSIMM
    Autonomous Haul System Savings – It’s Not about Less Truckies but Better Truckies!

    By R Price, B H. Miller

    "The rise of autonomous haul truck fleets may have been initially driven by the rapid escalation of the cost of equipment operators, but the actual improvements reported by the major iron ore miners f

    Nov 15, 2016

  • AUSIMM
    Designing Flotation Cells For Optimised Flow Dynamics

    By T Niitti, J Turunen, P B, A Rinne

    In todayÆs marketplace, with high metals prices, many operations are faced with the challenge of improving recovery in the particle size ranges which are normally difficult to recover. This presentati

    Jan 1, 2006

  • AUSIMM
    Thiosulfate Processing - From Lab Curiosity to Commercial Application

    By J Langhans, Y Choi, Q Wang, J Y. Baron, P Kondos

    Barrick has successfully developed the thiosulfate leaching process to treat sulfidic high preg-robbing ores. The process was developed through rigorous bench test programs and proved in pilot campaig

    Sep 26, 2013

  • AUSIMM
    Subduction of Oceanic Plate -Its Realities- Summary of French-Japanese Cooperative "Kaiko" Project

    Brief summary of results obtained by a French-Japanese cooperative study on the bottom of trenches around Japan. The geophysical prospection, multi beam echo sounding and direct observation with s

    Jan 1, 1987

  • AUSIMM
    Trigger Action Response Plans for Diesel Exhaust Exposures

    By J Jeffery, P G. Knott, F Velge, C Evans

    A trigger action response plan (TARP) provides a structured response to escalating levels of risk. In mining, TARPs are typically applied to primary hazards such as inrush, strata failure or heating.

    Aug 31, 2015

  • AUSIMM
    Surfactants for Gold Recovery Improvement with Preg-Robbing Gold Ores

    By Q Zhou, G Barrett, Y Choi, J Jiang

    As part of a general review of processing double refractory ores through Barrick GoldÆs autoclaves /carbon-in-leach (CIL) facility at Goldstrike, a study was made to evaluate the use of surfactants fo

    Sep 26, 2013

  • AUSIMM
    A Review of the Kapit Orebody, Lihir Island Group, Papua New Guinea

    By J R. Robinson

    Prior to mine development, exploration drilling within the Luise Caldera on Niolam Island encountered gold mineralisation to the northwest of the main Minifie and Lienetz orebodies. This mineralisatio

    Jan 1, 2004

  • AUSIMM
    Creating meaningful and measurable lead indicators for safety

    By A Gibbs

    The mining sector has been a leader in investing in safety improvement initiatives, yet relatively few mining organisations can accurately track the positive effects of these initiatives or identify a

    May 5, 2022

  • AUSIMM
    The basics of grinding circuit optimisation

    By A Giblett, B Putland

    This paper provides a simple guiding framework for grinding circuit optimisation, focussing on common themes in past optimisation success stories, the conditions for success and techniques that can be

    Aug 29, 2018

  • AUSIMM
    Computer Simulation of Vibrating Screen in a Dry Classification Circuit Case Study - Gol-e-Gohar Iron Ore Processing Plant

    By A Mehrani, F Zamani, A Dehghani

    Vibrating screens play an important role in the dry classification circuit of Gol-e-Gohar iron ore processing plant. This circuit was designed to classify the autogenous mill discharge and produce a s

    Jan 1, 2007

  • AUSIMM
    ‘We’re Metallurgists, not Magicians!’

    By E McLean

    The decision making check-list and hierarchy of information for process and plant design is generally wide-ranging and complex. The nature of grades, mineralisation and ore types in an ore body, its

    Aug 8, 2011

  • AUSIMM
    The Application of a Bespoke Ventilation on Demand (VoD) System at Carrapateena Sublevel Cave

    By A Coelho, D Bruce, H Grosser, C Parken, M Xia

    Carrapateena is a new underground sublevel cave mine and was officially opened in 2020. It has a mine life of 20 years. Development began in 2016, and with the rare opportunity to start a with a blank

    Mar 15, 2021

  • AUSIMM
    Simulating Extraction Shapes to Understand Financial Risk Using High Performance Computing

    By E Lima, D Gregory, C Faria, A Lapworth

    Open pit mine enterprises are complex systems that depend on multiple parameters such as mineral grade distribution, geotechnical characteristics, economic conditions and engineering requirements, all

    Nov 24, 2014

  • AUSIMM
    Recent Improvements to the Gravity Gold Circuit at Marvel Loch

    By A Bird

    Gravity gold circuits have an important part in reducing operating costs and maximising recovery in modern gold plants where coarse gold is present in the ore body. The design and selection of equipme

    Aug 8, 2011

  • AUSIMM
    In-Line Pressure Jig Preconcentration Plant at the Pirquitas Mine

    By A H. Gray

    Gekko Systems Pty Ltd engaged in the test work, design, manufacturing and commissioning of the pre-concentration plant at Silver Standard Resources Inc’s Pirquitas mine in the north western Jujuy prov

    Aug 8, 2011