Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Hydrothermal Alteration Zonation and Fluid Chemistry of the Southern Ridge and North Deposits at Mt Tom PriceBy S G. Hagemann, M E. Barley
The Mt Tom Price deposit is a world-class high-grade hematite deposit in the Hamersley Province of Western Australia with an original resource of 900 Mt of almost pure hematite, averaging 63.9 wt per
Jan 1, 2005
-
Strata Mechanics of Pillar Extraction Goaf EdgesBy Chaturvedula V. K
Pillar extraction carried out using various methods (split and lift, Wongawilli and Old Ben) involves the formation of narrow fenders (commonly 7 m of coal) formed by driving "splits" for lifting
Jan 1, 1992
-
Common Infrastructure Project ù Development for the Future of PT Freeport IndonesiaBy B Mennie, R Poedjono, G Coad
PT Freeport Indonesia operates a large copper and gold mining operation near Tembagapura, Papua (formerly, Irian Jaya), Indonesia. This is a remote location with its own set of unique operational char
Jan 1, 2005
-
On Structural Analyses of Oriented Bore Cores from the West Wallsend No.2 Colliery HoldingStructural analyses of oriented bore core sections from the West Wallsend No.2 Colliery Holding together with investigations in adjac- ent collieries and on the surface delineated structural phenome
Jan 1, 1972
-
TBM Design and Performance of Today - A Rapid Development - Where Will it End?The last decade has seen a very rapid development in TBM tunnelling. Some trends are purely technical or economical and others relate more to preferences of different interests. Power levels have more
Jan 1, 1993
-
Geochemical Mass Balance and Characterisation of Pollutants Draining from a Nickel Mine SiteBy N Dube, K L. Sandvik, C Mutevhe
Trojan Nickel Mine is the largest producer of Ni, Cu and Co in Zimbabwe. The mine has operated a nickel flotation concentrator and base metal refinery continuously since 1969, creating 28 million tonn
Jan 1, 2006
-
This Life of Mine - Personal Reflections on The Well-Being of the Contracted Fly-In, Fly-Out WorkforceBy R Goater, P Kirsch, S Goater, I Goater
With staff productivity and retention a crucial factor in the longevity of AustraliaÆs mining industry, some mining companies are increasing their focus on the health and well-being of their people, t
Sep 18, 2012
-
A Three-Dimensional Structural Interpretation of the Olympic Dam Deposit ù Implications for Mine Planning and ExplorationBy J, T C. McCuaig, J Hodgkison, T Fouet
Olympic Dam is the eighth largest Cu deposit and the largest U deposit in the world, with approximately 35 million tonnes of contained Cu and 1.2 million tonnes of U. The most recent resource estimate
Jan 1, 2004
-
Dynamic Simulation of Size Reduction Operations from Mine to MillBy Pate W. T
This paper describes the development of a dynamic flowsheet simulator for comminution operations. Object oriented software design allows the handling of multiple ore types, blended into multicompone
Jan 1, 1998
-
Tactical medical mining rescue – closing the gap of professional medical attention in environments with difficult accessibilityBy C Staak, H Mischo, A Fichtner, F Reuter
In mining and remote areas of resource industry, there has been a development towards lacking emergency medical first aid response, that creates a potential disadvantage for patients after work accide
Sep 1, 2024
-
Analysis of dust behaviour in the face zone utilising- CFD modelling toolsBy O Joneydi, J Viljoen, R Funnell
Computational Fluid Dynamics (CFD) modelling is a useful tool that can assist engineers in designing effective ventilation systems for the control of airborne dust generated during mining operations.
Oct 12, 2022
-
Economic Exploitation of Deep Coal Seams by Opencast MethodsBy Brown N. R
This paper attempts to highlight some of the problems encountered in the economic exploitation of the deeper coal seams by opencast mining methods. The major cost elements of three methods of over
Jan 1, 1986
-
Evolution of Vertical Crater Retreat Mining at Mindola Mine, ZambiaBy C Katonga
Mindola mine is currently the deepest mine in the Zambian copper belt. Stoping is currently active to 1330 m below surface with long range plans indicating future production from 1590 m level. The ore
Jan 1, 2000
-
Resource Evaluation of Nuggety Slate-Hosted Gold-Quartz ReefsBy A E. Annels, G F. Johansen, B W. Cuffley
Nuggety gold-quartz reefs are characterised by localised, high-grades and in many cases coarse free-gold. Geometrical and grade complexities are often observed. The high-grade regions are generally er
Jan 1, 2000
-
The Gassiness of Face Coal and the Occurrence of Gas Dynamic PhenomenaGas dynamic phenomena, particularly instantaneous outbursts of coal and gas are problems experienced in gassy, highly stressed coal, both usually the result of depth. Diff- erent mining geometries
Jan 1, 1986
-
The Kwademen Gold Deposit: A Polymorphic Mineralization within a Precambrian (Birrimian) Greenstone Belt in Burkina Daso, West Africa: A Case HistoryThe Kwademen Au deposit was discovered in 1977- 1978 following a regional geochemical survey carried out as part of a UNDP (United Nations Development Programme) and BUMIGEB (Bureau des Mines et de
Jan 1, 1988
-
Coal as a Source Rock for Hydrocarbon Gas in the Aldebaran Sandstone, Denison Trough, Bowen Basin - Geochemical EvidenceBy Golding S. D, Price P. L
The Early Permian Aldebaran Sandstone is the main hydrocarbon reservoir in the Denison Trough. Contained hydrocarbon gas has a wet gas index (C1/CI - C4) of between 0.87 and 0.97 (N=10), and consti
Jan 1, 1991
-
Fluid Bed Roasting at Mount ISABy Casley G. E, Pritchard J
A single slurry fed fluosolids roaster was chosen to replace six multiple hearth roasters in the Copper Smelter at Mount Isa as part of the overall program to increase production from 100 000 to 15
Jan 1, 1974
-
Minimising the Total Cost of Horizontal Development with Burn Cut Blast RoundsThe total cost of horizontal development can be minimised by optimising the cost of each of the component operations (eg drilling, blasting, etc). Component costs should not be minimised. To optimise
Jan 1, 1998
-
Gold Room Procedure at Lake View and Star, Ltd.Recovery of gold by smelting zinc dust concentrate has been carried on at Lake View and Star, Ltd., since July, 1930, when the Merrill-Crowe precipitation plant was first put into operation.Part I des
Jan 1, 1948