Search Documents

  • CIM
    Expert Systems Implementation at Peñoles Group Concentrators

    By Ramón Alanís, Filiberto Orrante, Andrea Festa, Baldomero Gutiérrez, Fernando Cornejo

    "SGS implemented two rules-based fuzzy logic expert applications on two grinding circuits operated by Peñoles Group in Mexico. Both expert systems are based on control strategies that push against pro

    Jan 1, 2009

  • NIOSH
    IC 9025 Tungsten Availability - Market Economy Countries - A Minerals Availability Program Appraisal

    By T. F. Anstett

    The Bureau of Mines estimated the potential availability of tungsten from 57 mines and deposits in 19 market economy countries. The tungsten resources of China and the U.S.S.R. were also estimated. Th

    Jan 1, 1985

  • ISEE
    *Kuz-Ram and Digital Image Processing System Combination to Determine Specific Blasting Parameters

    By A. Karadogan, G. Tuncer, A. Kahriman

    Determination of optimal blast parameters have been the priority act for blasters on the field due to financial and technical properties of the operation. Therefore many researchs were done to establi

    Jan 1, 2005

  • SME
    Machine Utilization Time Of NATM Method In Metro Tunnels: The Case Of Kadikoy-Kartal Metro Tunnels (Istanbul) ? Introduction

    By I. Ocak

    Initial investment for mechanical boring of tunnels is found to be high in most cases. Conventional drilling and blasting is not the possible especially in urban area. In these conditions impact hamme

    Jan 1, 2011

  • SME
    Stability Prediction And Performance Of Highwall Steepening In Weak Rock

    By D. R. Brox, J. Levell

    The Montana Tunnels Mine was mined out to a depth of 900 feet at the end of 1999. The first signs of instability were recognized in 1996 along the upper slope area of the northwest sector when the pit

    Jan 1, 2001

  • SME
    Design of Large and Shallow Caverns of New York Second Avenue Subway

    By Verya Nasri

    The proposed Second Avenue Subway Project in New York City is approximately 8.5 miles long, up to a depth of 120 feet beneath grade and runs the length of the eastern side of the island of Manhattan f

    Jan 1, 2008

  • NIOSH
    RI 3205 The Development of an Electrolytic Method for the Determination of Inclusions in Plain-Carbon Steels

    By G. R. Fitterer, E. A. Krockenberger, B. E. Sockman, R. B. Meneilly, J. F. Eckel, E. W. Marshall

    "Steel manufacturers have noticed a decided tendency on the part of many of their customers to become more exacting in their steel specifications. Under these conditions, the steel must not only meet

    May 1, 1933

  • NIOSH
    RI 6043 Recovery Of Mineral Values In Cupriferous And Nickeliferous Pyrrhotite ? Summary

    By Oliver C. Fursman

    These investigations were conducted to determine conditions for recovery of nickel and copper from Funter Bay, Alaska, sulfide ore and recovery of nickel from nickel-silicate ore, Nickel Mountain, Rid

    Jan 1, 1962

  • DFI
    PSEG Lawrenceburg Energy Facility Augered Cast -In-Place Piles Case History

    By Chris D. Shewmaker

    So you want to install 2,600 augered cast-in-place piles, about 155,000 lineal feet, in 33 working days? It can be done. The Public Service Enterprise Group (PSEG) decided to build a combined cycle po

    Jan 1, 2004

  • AUSIMM
    Ore Treatment at Martha Current Operations and Future Directions

    The treatment plant at Martha Mine was upgraded from a nominal throughput of 110tph (O.93mtpa) to 150tph (1.25mtpa) late 1999. Post-upgrade performance did not meet expectations when treating either t

    Jan 1, 2001

  • SAIMM
    Process Mechanisms In Ilmenite Smelting

    By J. H. Zietsman

    It has previously been observed that industrial high-titania slags display a compositional invariance, remaining close to stoichio-metric M3O5. The present study focuses on this invariance and the phe

    Jan 1, 2004

  • SME
    Regulatory Changes Improve Alaska’s Mining Climate

    By Steven C. Borell

    For more than a decade, changes have occurred each year that have improved the regulatory and business climate for mining in Alaska. These changes have taken place during Republican and Democratic go

    Jan 1, 2004

  • TMS
    Fe-Mn-Al-C Austenitic Steels Treated by Ca and Ce

    By S. N. Lekakh

    Phosphorous segregated at grain boundaries during solidification and heat treatment dramatically decreases low temperature toughness of precipitation hardened Fe-Mn-Al-C austenitic steel. A thermodyna

    Jan 1, 2010

  • SME
    Development of a new method for quality control in the quarry industry for practicing sustainability

    By H. Tudeshki, A. Tayebi

    "The large extent of global production and consumption of aggregates from quarries, grabs one´s attention and makes its substantial and essential standpoint in the world today pretty clear. A great am

    Jan 1, 2011

  • SAIMM
    A Study Of Metal Dusting Corrosion On Fe- And Ni-Based Alloys - Synopsis

    By F. M. L. Mulaudzi

    Behaviour studies of metal dusting processes and associated filamentous carbon formation were undertaken on Alloys 600, 601, and 800 using a simulated metal dusting environment of 25C0-70H2-5H20 (vol.

    Jan 1, 2013

  • TMS
    Novel Technology for Wastewater Treatment by Biologics in Hydrometallurgical Processes of Lead-zinc

    By Qingwei Wang

    Heavy metal-containing wastewater from hydrometallurgical processes of lead-zinc was treated by biologics in a 200 m3/h industrial scale experiment. The result shows that Zn concentration declined fro

    Jan 1, 2010

  • SME
    Summersville Raw Water Intake

    By Douglas Banks

    Construction for the new 2.5 MGPD raw water intake project commenced December 2002. The project, initially designed as a 12' Ø concrete lined intake shaft,145' deep, with two offset 24" lake

    Jan 1, 2005

  • NIOSH
    Emerging Technologies Control Respirable Dust Exposures For Continuous Mining And Roof Bolting Personnel

    By D. E. Pollock, T. W. Beck, J. A. Organiscak

    This work presents the findings from a number of NIOSH studies evaluating the impacts of emerging technologies that may reduce dust exposures for continuous mining and roof bolting personnel. These t

  • AUSIMM
    Mapping of Structural Discontinuities in the Otago Schist as Potential Exploration Targets: Preliminary Results

    By D Craw, I M. Turnbull, R J. Norris, N Mortimer

    The Otago Schist is being subdivided on a regional scale into structurally, metamorphically and lithologically distinct blocks. Differences between blocks are subtle, and difficult to map in the field

    Jan 1, 1999

  • AUSIMM
    Petrographic Evidence Relating to Movement on the Thackaringa-Pinnacles Fault, Broken Hill District

    Although the pattern of metamorphic zones south of the Thackaringa-Pinnacles Fault is much obscured by polymetamorphism, displacement of the orthopyroxene isograd by the fault agrees with the displace

    Jan 1, 1965