Search Documents

  • ISEE
    Modeling of Dynamic Break in Underground Ring Blasting

    By Troy Williams, Chris Preston, Ian Lipchak

    "Underground blasting operations are challenging from the standpoint of the distribution of explosivesenergy representative of ring blasting. Energy from both shock and pressure regimes of commerciale

    Jan 1, 2016

  • DFI
    Evaluating Axial Elastic Pile Response From Cone Penetration Tests (The 2009 Michael W. O?Neill Lecture)

    By Paul W. Mayne

    Axial pile performance can be rationally evaluated within an elastic continuum framework using field results from seismic piezocone tests (SCPTu). Adopting a versatile Randolph-type elastic pile model

    Jan 1, 2009

  • SME
    Ani-Metprotech Stirred Vertical Mills For Ultra Fine Grinding- Case Studies In Gold, Nickel And Lime Slaking

    By K. S. Liddell

    Ultra fine grinding is becoming increasingly used in the mining industry over recent years. The development of large-scale units for high volume grinding of low value materials and concentrates has op

    Jan 1, 2001

  • AUSIMM
    The George Fisher Project to Increase Recovery in the Mount Isa Lead/Zinc Concentrator

    By K S. Fisher, J D. Pease

    The installation of the George Fisher flowsheet in the lead/zinc concentrator at Mount Isa Mines Limited has recently been completed. The George Fisher flowsheet involved moving flotation capacity fro

    Jan 1, 2000

  • NIOSH
    IC 8168 Injury Experience In Quarrying, 1959 ? Introduction And Summary (6ecd48bc-c21f-4a2b-bdfd-eb2d60ce50ec)

    By John C. Machisak

    INJURY EXPERIENCE AND EMPLOYMENT DATA on all stone quarries and associated plants in the United States are presented in this publication for the calendar year 1959. Such related operations as the manu

    Jan 1, 1963

  • NIOSH
    IC 8168 Injury Experience In Quarrying, 1959 - Introduction And Summary

    By John C. Machisak

    INJURY EXPERIENCE AND EMPLOYMENT DATA on all stone quarries and associated plants in the United States are presented in this publication for the calendar year 1959. Such related operations as the manu

    Jan 1, 1963

  • SME
    Rib Support Optimization for a Room-and-Pillar Mine

    The National Institute for Occupational Safety and Health (NIOSH) conducted a monitoring field study to optimize the rib control plan in a room-and-pillar coal mine. The study mine is located in the C

    Jul 28, 2020

  • SME
    Pushing The Limits Of Gravity Separation

    By Claude Deveau, Stephen R. Young

    Introduction Tanco History Tanco is sometimes known as the Bernic Lake Mine. It is located about 180 km east-northeast of Winnipeg close to the Manitoba-Ontario boundary. Tanco operates an undergr

    Jan 1, 2005

  • NIOSH
    OFR-79-93 Vol. II Cross-Ridge Mountaintop Mining Demonstration - Volume II

    By Robert L. Lappi

    Volume I of this report described the demonstration of cross-ridge mountaintop coal mining. This document, Volume II, is intended for use as a supporting document to Volume I. This report describes th

    Jan 1, 1984

  • AUSIMM
    Possible Metallogenic Significance of Epizonal, Polymetallic Vein Mineralisation at San Bartolome in the Ecuadorian Andes: A Working Hypothesis

    The epizonal Ag-Pb-Zn vein deposit at San Bartolome is characterised by a base-metal sulphide assemblage containing the spectacular development of interpenetrating, bladed networks of pyrrhotite which

    Jan 1, 1995

  • NIOSH
    Detrimental Effects Of Capacitance On High-Resistance-Grounded Mine Distribution Systems

    By Thomas Novak, Jeffrey L. Kohler, Joseph Sottile, Steve J. Gnapragasam

    Modern underground coal mines can be very large, having a total connected load in excess of l5 000 hp. These mines generally have many miles of high-power conveyor belts and 15 or more miles of high-v

  • ISEE
    Engineering Field Controls and Hole Deviation

    By Mick Fritz, Tom Treleaven

    The success of any blast is dependent on the accuracy of the blast design and field controls placed at the shot location. The procedure by which the data is collected and analyzed is paramount to acco

    Jan 1, 1998

  • NIOSH
    OFR-66(3)-76 Research And Development Program On The Disposal Of Retorted Oil Shale---Paraho Oil Shale Project - Phase IV - Interim Report No. 1 Direct Heat Retorted Shale From Semi-Works Plant ? I. Introduction ? 1. General

    A preliminary program dated April 25, 1974, was prepared for Development Engineering, Inc. (DEI) on research and development. for laboratory, field and other engineering studies on the disposal of ret

    Jan 1, 1975

  • AUSIMM
    Development Aspects of the Golden Cross Project

    Permitting, engineering and evaluation, detailed design and construction aspects of the Golden Cross goldmining project in New Zealand are briefly reviewed. The extremely lengthy and complicated gover

    Jan 1, 1990

  • AUSIMM
    Simulation investigation of flow patterns and feeder loads at hopper/feeder interface

    By J Guo, K Williams, J Y. Guo, A W. Roberts, M Jones, B Chen

    Numerical simulations using the discrete element method (DEM) were carried out to investigate the flow patterns and stress field redistribution at the hopper and feeder interface. The influences of di

    Jul 24, 2017

  • AUSIMM
    Heat load assessment and mine cooling strategies for a longwall coalmine

    By M Olsen, L van den Berg

    Bowen Basin coalmines suffer from hot and humid ambient conditions during the summer period. The ambient conditions combined with high VRTs, increasing depth of working and significant equipment heat

    Aug 28, 2017

  • SAIMM
    Re-aligning the cutting sequence with general support work and drafting a support sequence at Simunye Shaft

    By K. Lombard

    "‘Roof support awaiting time’ (RSAT) is a term used at Goedehoop Colliery’s Simunye Shaft to describe the potential production time lost due to the continuous miner (CM) standing idle waiting for roof

    Jan 1, 2015

  • ISEE
    Sappington Bridge: An Opportunity for Strengthening Research and Demolition Training

    By J. Baird

    The Sappington Bridge, a steel arch span bridge constructed in 1904 over the Meramec River, was demolished due to its advanced state of deterioration. The demolition was a project to benefit Crawford

    Jan 1, 2003

  • AIME
  • AUSIMM
    The Uses of Electricity in Mining with Special Reference to the Electrical Operations at Mount Morgan

    That electricity is an important and valuable agent, the limit of whose capacity for utilisation is as yet unknown, is a truism; although enormous advances have been made, the possible developments ar