Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Roof Bolting Application In Longwall Mining In Indonesia And Japan

    By Herryal Anwar

    The application of roof bolting technology to control the stability of roadways in coal mining within weak strata or under high ground pressure has improved progressively. One of several factors that

    Jan 1, 1999

  • SME-ICGCM
    Application of the Coal Mining Roof Rating System in South African Collieries

    This paper describes the experiences with the application of the Coal Mining Roof Rating (CMRR) System to South African strata conditions. Roof classification studies using the CMRR system were undert

    Jan 1, 2001

  • SME-ICGCM
    Comparative Analysis Of Longwall Gateroad Designs In Four Deep, Bump-Prone Western U.S. Coal Mines

    By Matthew J. DeMarco

    Research personnel at the U.S. Bureau of Mines have conducted longwall gate stability studies at four western U.S. mines attempting to employ yield pillars for improved ground conditions. Located in t

    Jan 1, 1993

  • SME-ICGCM
    Greater Safety With Increased Productivity Coal Mining Operations

    By William B. Beerbower

    When full length resin grouted bolts were introduced into U. S. coal mines some 11 years ago, it was assumed that safety would be the primary benefit. There is ample testimony to substantiate the safe

    Jan 1, 1982

  • SME-ICGCM
    Experimental and Numerical Methodology Assessment of Load Transfer Capacity of Bolts

    By Naj Aziz

    n Australia, the common method of laboratory testing of bolt for load transfer capacity determination is by short encapsulation push testing. Some concerns are raised about the validity of the test me

    Jan 1, 2005

  • SME-ICGCM
    Prevention. Control and Management of Coal and Gas Outbursts

    By Lu Jiam Zhang

    Coal and gas outburst is one of the serious natural disasters in the coal mines of China. Since 1950, more than 10,000 coal or gas outbursts have occurred in more than 200 underground coal mines of di

    Jan 1, 1987

  • SME-ICGCM
    Status Of Longwall Research In CSIRO

    By Michael Kelly

    Current research in longwall mining in CSIRO Exploration & Mining is focused within five major projects and several minor projects. The major projects are: 1 3D Aspects of Longwall Geomechanics. Th

    Jan 1, 2001

  • SME-ICGCM
    Problems in "Void" Detection in Coal Mine Water Hazards

    By Francis Kendorski

    One of the most dangerous events in underground coal mining is unexpectedly encountering water inrushes from undetected abandoned mines in the same seam. The surest and most confident method is probe

    Jan 1, 2004

  • SME-ICGCM
    Extended Cut Out Distances In Continuous Miner Sections In South African Collieries

    By Ismet Canbulat

    The cut out distance in the continuous miner sections in South African collieries is limited to 12 m. However, this distance can be extended to 24 m by the permission of the Department of Mineral and

    Jan 1, 2000

  • SME-ICGCM
    How To Cope With Cutter Roof Problem (e6639bdb-2d11-4a70-a3df-8a3a479f7b3e)

    By A. Wahab Khair

    This paper presents results of the experiments carried out in Beth Energy No. 33 Mine for the purpose of alleviating problems associated with cutter roof. Cutter roof problems have delayed the advance

    Jan 1, 1992

  • SME-ICGCM
    Automated Temporary Roof Support Systems: An Update

    By William Gray

    It has been ten years since the Mine Safety and Health Administration (MSHA) promulgated a safety standard requiring the use of Automated Temporary Roof Support (ATRS) systems in underground coal mine

    Jan 1, 1998

  • SME-ICGCM
    A Lineament Analysis Case Study of the Fola Coal Co., LLC. No. 2 Surface Mine, West Virginia

    By Paul L. Tyrna

    The Fola Coal Co., LLC No 2 surface mine, located in Nicholas and Clay Counties, WV, exploits up to nine coal seams by contour, highwall, and mountain top removal mining methods. After encountering fa

    Jan 1, 2001

  • SME-ICGCM
    Cutable and Variable Yield Cement Cribbing Successfully Support 84 Mine Longwall Cut Through Entries

    By William Bookshar

    The development of increasingly more sophisticated and powerful retreat longwall equipment has led to ever wider and longer panels. To maximize gateroad development efficiency, provide for effective f

    Jan 1, 1998

  • SME-ICGCM
    Using Site Case Histories Of Multiple Seam Coal Mining To Advance Mine Design (a1a824d0-6082-498c-977a-2f43506db9fe)

    By John Ellenberger

    The nature of competition in the coal market tends to deplete the most favorable coal reserves first, and forces subsequent development of mines in more extreme ground conditions such as those associa

    Jan 1, 2003

  • SME-ICGCM
    Assessing Coal Bumps From Excess Energy in Finite Difference Models

    By Ryan Garvey

    A numerical investigation is made into unstable failures of coal pillars (i.e. coal bumps) using the finite difference software FLAC3D. A static energy balance is first derived to calculate the excess

    Jan 1, 2013

  • SME-ICGCM
    A comparison between two- and three-dimensional numerical models of a Coeur d'Alene District mine

    By T. J. McMahon

    This Bureau of Mines study describes the development of a large-scale, three-dimensional, finite-element model of a deep-vein Coeur d?Alene District mine. The three-dimensional model was prepared from

    Jan 1, 1989

  • SME-ICGCM
    Effect of Longwall-Induced Subsurface Deformations on Shale Gas Well Casing Stability under Deep Covers

    By Peter Zhang, Todd Minoski, Mark Van Dyke, Daniel W. H. Su

    "This paper presents the results of a 2017 study conducted by the National Institute for Occupational Safety and Health (NIOSH), Pittsburgh Mining Research Division (PMRD), to evaluate the effects of

    Jan 1, 2018

  • SME-ICGCM
    Analysis on the Dynamics of Mining Subsidence in Range of a Product Transmission Overhead Line

    By Axel Preusse

    A high advance rate of the longwall face increases inevitably the mining dynamics within the rock and on the surface. Measures to limit the mining dynamics are the adjustment of the face advance rate

    Jan 1, 2003

  • SME-ICGCM
    The Initial Performance of Commonly Used Primary Support on U.S. Coal Mines

    By Murali Gadde

    U.S. coal mines? primary roof supports typically consist of passive resin bolts; however, the use of active bolt systems is increasing. Despite this widespread use, a comparative performance evaluatio

    Jan 1, 2011

  • SME-ICGCM
    Time-dependent Behavior of Immediate Weak Floor Strata from an Illinois Coal Mines

    By Y. P. Chugh

    The paper discusses laboratory and field studies to analyze time-dependent deformation behavior of immediate weak floor strata in an Illinois coal mine. In the laboratory, core samples of the immediat

    Jan 1, 1987