Ultra-Thick High-Production And High-Efficiency Longwall Mining Technique With Retreat Mining Along The Seam Dip Direction And Under Complicated Geological Conditions (6f1eec60-4383-4b46-a3c6-b20670410c29)By Ke Yang
In Chinese coal mines, extraction of deep, highly gassy soft coal seams sandwiched between soft floor and soft roof in complicated geology is commonly encountered. How to safely and efficiently excava
Jan 1, 2009
-
The In-Situ Pillar Strength and Overburden Stability in U.S. MinesBy Hamid Maleki
Prudent design of coal pillars in any mining system requires an estimation of in-situ pillar strength, overburden lateral load transfer capability, and a failure criterion. Pillar strength is typicall
Jan 1, 2008
-
Optimised Layout And Roadway Support Planning With Integrated Intelligent SoftwareBy S. Kouniali
Experience with knowledge-based systems for Layout planning and roadway support dimensioning is on hand in European coal mining since 1985. The systems SOUT (support choice and dimensioning, 1989), SO
Jan 1, 1996
-
Application Of Physical And Mathematical Modelling In Underground ExcavationsThe scope of this paper is to introduce a mathematical model based on matrix algebra in order to determine similitude quantities, which can be arranged in specific formats to simulate the field condit
Jan 1, 1989
-
Material Instability Hazards In Mine Processing OperationsBy John W. Fredland
Many accidents occur in the mining industry as a result of the instability of material during handling and processing operations. Accidents due to dump point instability at stockpiles, and at spoil or
Jan 1, 1993
-
The Use Of Foamed Cement Cribs At American Electric Power Fuel Supply Meigs DivisionBy Michael Amick
Due to the importance of maintaining open airways on a longwall panel, mine management decided to install cribs made of foamed cement. Foamed cement had been used at other company operations on severa
Jan 1, 1993
-
Birth Of A Longwall-Initial Planning To Post-Subsidence MitigationBy E. D. Doney
The Kerr-McGee Coal Corporation's Galatia Mine's first longwall mining system was implemented on May 3; 1989. Start-up of the longwall face represnted the successful conclusion of an effort
Jan 1, 1990
-
Mine Layout Deign for Coal Bump ControlBy Hamid Maleki
A comprehensive study consisting of stress determinations, core logging, laboratory testing, and numerical analyses was conducted to investigate the cause and potential alternatives to the coal bump c
Jan 1, 1987
-
A Sonic Wave Attenuation Technique For Monitoring Of Stress LevelsBy Po-Ming Lin
Stress has a significant effect on the stability of pillars. In order to get an accurate picture of pillar stability, one needs information not only on the primary Stress distribution but also on all
Jan 1, 1984
-
DEPOWS - A Powered Support Selection ModelBy Y. M. Jiang
A users friendly PC Computer Program has been developed to implement a systematic design of the powered support. The required input data are: (1) thickness, RQD, and compressive strength of the immedi
Jan 1, 1989
-
A Test Of Predictive Numerical Models To Simulate Entry Design Changes Using Field Measurements From A Longwall Mining GateroadBy Jennifer Riefenberg
Research efforts by the U.S. Bureau of Mines include running a series of displacement-discontinuity, boundary-element models to simulate the gateroad design at an underground coal mine in northwestern
Jan 1, 1993
-
A Study Of Displacement Field Of Main Roof In Longwall Mining And Its ApplicationBy Deren Zhu
Based on the results of in-situ observations and physical model analysis, a computer simulation method, FEAEBP, has been developed to predict the behaviors of main roof breakage in longwall mining by
Jan 1, 1989
-
CISPM - A subsidence prediction modelBy Y. Luo
A PC based computer model has been developed by the authors for predicting the surface subsidence due to underground coal mining. Its reliability, comprehensiveness and user friendliness demonstrate t
Jan 1, 1989
-
Realistic Design Of Ground Control Based On Geotechnical Data Obtained During Mine DevelopmentBy Kot F. Unrug
In the premining stage of engineering design, the only available data are obtained from core drilling. It is often not sufficient for a realistic design of strata control. During the development, an a
Jan 1, 1994
-
The Effect of Immediate Strata on Pillar Behavior in Retreat Pillaring-- A Case StudyBy A. W. Khair
This paper deals with the analysis of pillar failure in a room and pillar mining operation of a deep underground coal mine. The incident here involved the failure of more than 100 pillars. The mechan
Jan 1, 1986
-
Planning And Design For Barrier Pillar Recovery Three Case HistoriesBy David A. Newman
Barrier pillars created during mine development provide additional reserves during mine closure and can be the sole access to reserves previously abandoned because of mining height or out of seam dilu
Jan 1, 1995
-
The Use Of Rim- To Detect Geologic Anomalies In The Clarion SeamBy M. Craig Miller
As the trend continues in the U. S. toward inceased capital investment in longwall mining equipment and wider panels. the risk also increases for gotential financial and production loses due to undete
Jan 1, 1990
-
The Response Of A High Order Stream To Shallow Cover Longwall Mining In The Northern Appalachian CoalfieldBy John A. Owsiany
The effect of longwall mining on streams and shallow aquifers has been the subject of numerous research studies for more than twenty years. As a result of these studies, it has become common to consid
Jan 1, 2001
-
An analysis of roof-pillar-weak floor interaction in partial extraction room-and-pillar miningBy W. M. Pytel
The applicability of the beam theory in analysis of roof- pillar-weak floor interaction in partial extraction room-and-pillar mining is presented. The mine structure is modeled as an equivalent multi-
Jan 1, 1989
-
Subsidence monitoring at a shallow partial extraction room-and-pillar mine in midwestem United StateBy Yoginder P. Chugh
Subsidence may be observed above partial extraction shallow room-and-pillar mines where the coal seam(s) is associated with weak and thick claystone in the floor. This paper presents results of subsid
Jan 1, 1989