Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Tunneling Data: Turning Information into Intelligence on the NEIS ProjectBy John McDonald, Peter C. Raleigh, Christopher Dishlip
This paper will discuss how the construction management team and the contractor working together on the City of Los Angeles, North East Interceptor Sewer project, managed information on a daily basis.
Jan 1, 2005
-
Evaluation Of Smoke Detectors For Use In Underground Mines - Preprint 09-072By C. D. Litton
Laboratory experiments were conducted to determine the responses of a prototype smoke detector and a commercially available photoelectric smoke detector to smoke particles generated from various combu
Jan 1, 2009
-
Development of a new fine particle dry separator Mining, Metallurgy and ExplorationBy M. K. Mohanty, H. Akbari, L. A. Ackah
Dry separation was the predominant method of coal cleaning in the United States from the 1930s to 1980s. The application peak of dry separators for cleaning raw coal was in 1965, when about 23.1 Mt of
-
Sphericity Of Apatite Particles Determined By Gas Permeability Through Packed BedsBy T. C. Souza Pinto
Because shape is an assessment of the three-dimensional form of a particle, it may be described in terms of sphericity (?), which is a measure of how closely a particle approaches a spherical configur
Jan 1, 2009
-
Synthesis Of Monolithic Si2n2o Ceramic From Reclaimed Silicon And Desert SandBy M. Radwan, S. Shimada, S. Z. El-Tawil, K. A. El-Barawy, Y. Miyamoto
This study presents the results of synthesizing monolithic siliconoxynitride, Si2N2O, ceramic from a mixture composed of reclaimed silicon and natural desert sand by using the nitriding combustion syn
Jan 1, 2004
-
South Interceptor Tunnel Construction Using a Lovat EPBMBy Dennis Molvik, Omar Fulton, Chris D. Breeds, Don Gonzales
This paper presents and describes the South Interceptor Parallel Phase III Contract C93012C, which involved construction of a nominal 2.7 m (9-ft) finished diameter sewer conveyance using both pipe ja
Jan 1, 2003
-
Hierarchical Systems Analysis Of Potential Environmental Impacts Of Aggregate Mining ActivitiesBy K. E. Kolm, W. H. Langer
Developing natural aggregate resources (sand, gravel, and stone) creates environmental impacts. A systems analysis method has been designed to characterize the components of the environmental system,
Jan 1, 2001
-
Handling Infiltration Into Underground StructuresBy Edward D. Graf
Once the heavy work of mining, supporting and completing an underground structure is finished, there is frequently the problem of handling unwanted water infiltration into the opening. Methods of cont
Jan 1, 1987
-
Financial Evaluation and Risk Assessment of a Placer Gold Deposit during the First Stages of Exploration: A Case StudyBy D. Drymonitis, G. Gialoglou
"Placer gold mineralizations have been observed in the north-eastern parts of Greece. Some of them have been at first evaluated to be of special interest so, exploration campaigns have been designed a
Jan 1, 2005
-
Problems With Appraising Electric Utility Assets After Deregulation (9b7f9b1b-6191-4f06-b182-7adc8e5b7333)By J. Kern, M. Cain, T. Torries
Until recently, the generation of electricity was regulated in all states and the value of generation assets in a regulatory environment for ad valorem taxation were based largely on the book value of
Jan 1, 2001
-
European Tunneling Technology And MethodsBy Brian Fulcher
While tunneling in Europe has been a tradition for centuries, many companies and countries have embraced tunnel innovation with considerable vigor and creativity. Indeed, local needs and site conditi
Jan 1, 2007
-
Probabilistic Approach To Project-Specific Political Risk Analysis For Mineral ProjectsBy S. Dessureault, Z. Gavelan
As globalization continues, sustainability and social responsibility has become essential in foreign mining investment. However this global trend and the increasing acceptability toward the globalizat
Jan 1, 2004
-
Industrial Minerals Review 2010By R. L. Virta
Ball Clay -- Four companies - H.C. Spinks Clay Co. Inc. (owned by Lhoist Group), Imerys Group (formerly Kentucky-Tennessee Clay Co.), Old Hickory Clay Co. and Unimin Corp. - mined ball clay in four st
Jan 1, 2011
-
Pre-Excavation Drilling and Grouting for Water Control and Ground Improvement in Highly Variable Ground Conditions at the Arrowhead Tunnels ProjectBy Brian Fulcher
The Arrowhead Tunnels Project represents the final portion of a 70 km (44-mile) long water conveyance facility that will bring up to 28 m3/sec (1,000 ft 3/sec) of water into Southern California. The 1
Jan 1, 2008
-
Evaluations Of Bit Sleeve And Twisted-Body Bit Designs For Controlling Roof Bolter DustBy T. W. Beck
Drilling into coal mine roof strata to install roof bolts has the potential to release substantial quantities of respirable dust. Due to the proximity of drill holes to the breathing zone of roof bolt
Feb 27, 2013
-
Dust Control for Coal Handling : Design Considerations and SolutionsBy Henning E. Soderberg, Robert Brien, O&apos
Coal may be the answer to US energy problems, but it also has its drawbacks. If it is crushed, screened, dumped, or moved, the environmental engineer is faced with a dust problem. To control coal d
Jan 10, 1981
-
Eskay Creek Mine And Mill – A Continued SuccessBy G. Biles, K. Loughran, R. Anand
The Eskay Creek Mine, a high-grade gold and silver underground mine in northwestern British Columbia started operations in late 1994. For the first three years of operation, ore was crushed to minus
Jan 1, 1999
-
Real-Time Monitoring Of Cable Shovel Stress For Improved Machine HealthBy S. Frimpong
Cable shovel requires continuous monitoring through excavation to achieve reliability, longevity and economic usage. The operating environment and the stress and deformation fields on the front-end as
Jan 1, 2006
-
New Opportunities and Challenges in Surveying Underground Cavities Using Photogrammetric MethodsThe exploitation of the underground is currently undergoing a major transformation process. Besides mining, alternative ways of utilization are playing an increasingly important role. These alternativ
Jan 7, 2020
-
Recovery Of Metal Values From Copper Slags By Flotation And Roasting With PyriteBy G. Bulut
The recovery of copper and cobalt from ancient copper slags from the Küre region of Turkey was investigated. A fayalitic-type of ancient copper slag containing 1.24% Cu, 0.53% Co and 53.16% Fe were su
Jan 1, 2007