Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Some Aspects Of The Physical Chemistry Of Potash Recovery By Solar Evaporation Of Brines ? IntroductionBy Pablo Hadzeriga
There are two places in the world where potash, trade name for potassium chloride, is economically recovered from naturally occuring brines by solar evaporation. One is at the Dead Sea and the other a
Jan 1, 1963
-
Optimum auxiliary fan location to control air recirculationBy Ajit Godbole, Ping Chang, Ramakrishna Morla, Purushotham Tukkaraja, Shivakumar Karekal
This paper presents the results of a study on the optimum auxiliary fan location to control air recirculation in dead-end workings where diesel-powered vehicles operate. Investigations were conducted
Jul 1, 2023
-
Coal Mine Subsidence In Colorado: Practical Application In A Regulatory Setting - IntroductionBy James A. Pendleton
The Legislature of the State of Colorado adopted House Bill 1223, "The Colorado Surface Coal Mining Reclamation Act" (The State Act), in 1979. This Act provided for the creation of a state regulatory
Jan 1, 1985
-
Dust Control in Longwall MiningBy Harry Elkin
Control of coal dust has long been an important aspect in the conventional mining of coal; the main reasons being from a health and disaster standpoint. With the advent, of mechanized longwall mining,
Jan 1, 1967
-
Dump truck tire stress simulation for extended service life - SME Transactions 2012By S. Frimpong, G. Galecki
Dump truck tires are often used in long-haul roads in rugged terrain, with high rolling and grade resistances. These conditions increase the ton-kilometer-per-hour (tkm/hr) or short-ton-mile-per-hour
Jan 1, 2012
-
Analysis Of Power Draw In Tumbling MillsBy B. K. Mishra
Power draw of the mill has been accepted as an indicator of the performance of the mill, yet the problem of predicting power under a given set of mill operating conditions still remains to be solved.
Jan 1, 1993
-
An Empirical Approach To The Modelling And Control Of Ball Mill GrindingBy D. Hodouin
Abstract. Dynamic experiments were performed in a continuous open-circuit 40x40 cm ball mill using a pseudo-random binary sequence of the feed rate and measuring the variations of the discharge partic
Jan 1, 1987
-
Modern Visualization to Aid in Communication of Mine Planning UncertaintyBy Chris Roos
The mining industry has made strides in planning for operations to be safe for the workforce and public, to protect the natural environment, and to maximize value for shareholders. However, many of th
Jun 25, 2023
-
Cobalt Recovery from Mill Tailings at Mantoverde Copper Mine - SME Annual Meeting 2025By Peter Amelunxen, Kain Nugent, Brandon Akerstrom, Willem Duyvesteyn, Todd Harvey
In 2024, Capstone Copper Corp commissioned a new sulfide flotation plant at Mantoverde in the Atacama region of Chile to process copper ore at a design rate of 32,000tpd. The pyrite associated with th
Feb 1, 2025
-
Approximating a project's rates of returnBy M. M. Hajdasinki
A project's rates of return (RORs)1, be it the internal rates return (IRRs) or one of the many IRR surrogates, frequently needs to be approximated. The success and efficiency an ROR- approximatio
Jan 1, 1999
-
Changes In Face Methane Concentrations Using High Capacity Scrubbers With Exhausting And Blowing VentilationCurrent scrubber capacities vary from 1.89 to 4.72 m3/s (4,000 to 10,000 cfm), and there is interest in using scrubbers with capacities up to 6.61 m3/s (14,000 cfm). This paper describes research to c
Jan 1, 1996
-
Practical Applications Of Recent Techniques To Mobile Equipment ReplacementBy S. F. Willey
The difficulties encountered in justifying replacements for over-age mobile mine equipment at the Gay Mine are common to most mining operations. More critical management reviews, resulting from ever r
Jan 1, 1972
-
Value Engineering for the Shoreline Consolidation Sewer: An Example of Collaboration Between Owner, Engineer, and Contractor - NAT2024By Colin Irwin, Adrian Naranjo-Castillo, Christopher Petta, Eric Zarobila
The Shoreline Consolidation Sewer is a CSO control project in Cleveland, Ohio that requires the installation of 5,000 feet of 72-inch inside diameter pipe using microtunneling methods. After award, th
Jun 23, 2024
-
An Engineered Grouting System Developed for the Inter-Island Tunnel, Boston, MassachusettsBy David R. Klug, Chris Gause, Troy L. Page
The Inter-Island Tunnel is one of two undersea tunnels which are part of the Boston Harbor Clean-Up Program. The tunnel is 7.7 km (25,160 ft) long, bored to a 4.3 m (14 ft) diameter in the Cambridge A
Jan 1, 1999
-
"Pit lake water treatment assists with legacy acid rock drainage issue in anticipation of restart at Mount Todd gold mine"By P. B. Moran, J. W. Rozelle, J. Forbort
"The Mount Todd gold mine is located approximately 50 km (31 miles) north of the town of Katherine in the Northern Territory (NT) of Australia just off the Stewart Highway, and was operated in the 199
Apr 1, 2016
-
Technical Papers - Continuous Miner Spray Considerations For Optimizing Scrubber Performance In Exhaust Ventilation SystemsBy J. Organiscak
A majority of continuous mining machines employ a water spray system and a machine-mounted flooded-bed scrubber to suppress and capture dust during coal mining. These machine-mounted dust control syst
Jan 1, 2010
-
Magnex Pilot Plant Evaluation -A Dry Chemical Process For The Removal Of Pyrite And Ash From CoalBy Clifford R. Porter
A 200 pound per hour Magnex Pilot Plant was designed and constructed. A non-compliance Eastern Coal which would generate more than 2.0 lb of SOZ per million Btu upon burning was brought into complianc
Jan 1, 1977
-
A preliminary evaluation of a through-the-earth (TTE) communications system at an underground coal mine in eastern KentuckyBy E.C. Jong
Resumen ¦ Un sistema de comunicaciones “a través del suelo” (TTE) comercial y disponible fue evaluado en una mina de carbón subterránea en la zona Este del Estado de Kentucky. Este estudio de campo fu
Apr 1, 2016
-
The Abestos Industry At The Crossroads: Current Position And OutlookBy Jean Dupere
Mr. Chairman, Ladies and Gentlemen, I'd like to take just a moment of your time before we examine the current position of the asbestos industry and its market outlook to take a searching look
Jan 1, 1984
-
Application Of The Mine Roof Simulator For Assessing Load Strengths Of Various Mine Roof Support CribbingsBy P. M. Yavorsky
Using a mine roof simulator press capable of duplicating the expected magnitude of vertical and horizontal forces experienced by underground mine roof supports, load capabilities of some roof support
Jan 1, 1984