Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Aspects Of Time-Dependent Deformation In Hard Rock At Great DepthBy K. Drescher
Excavations in deep level hard rock mines show rheological or time-dependent deformation responses to mining-induced stresses. These are generally not as dramatic as those seen in soft rock environmen
Jan 1, 2003
-
Effect of true tri-axial loading schemes on fracturing of limestoneBy J. -P. Tshibangu, A. Vervoort, A. Lavrov
Abstract: The aim of the research presented is to study the effect of complex loading schemes on the fracturing process during loading and/or unloading. A first set of experiments was done using a pol
Jan 1, 2003
-
Some Benefits Arising From The Establishment Of A Mining Infrastructure Prior To The Commissioning Of The ShaftBy H. C. de Wet
The predevelopment and preparation of a total infrastructure in a deep level mining environment, prior to the shaft system being commissioned has major advantages. This paper intends to indicate these
Jan 1, 1997
-
The Effectiveness Of On-Board Suppression Systems To Prevent The Propagation Of Methane Ignitions Under Simulated Coal Mining ConditionsBy B. Genc
After the explosion at Middelbult Colliery, South Africa in May1993, which claimed 53 lives, the South African Coal Mining Industry and the Safety In Mines Research Advisory Committee (SIMRAC) united
Jan 1, 2002
-
Equilibrium Interactions Between Freeze Lining And Slag In Ilmenite SmeltingIn ilmenite smelting, the FeO content of the feed material (nominally FeO.TiO2) is decreased by reduction with carbon. In a parallel reaction, a significant amount of the TiO2 is reduced toTi2O3. One
Jan 1, 2004
-
Support stability mechanism in a coal face with large angles in both strike and dipBy X. Q. Cao, D. S. Zhang, L. Q. Ma
To solve the support stability control problem for a coal face with large angles along both strike and dip (CLSD), the ’support-surrounding rock’ mechanical model has been developed, which takes into
Jan 1, 2015
-
Risk In Project Preparation - ?Determining The Project Needs And The Effects On The Management Strategy?By A. M. Clegg
In general, overall experience has shown that the approach to the appointment of a project manager is given much attention, but little specific attention is given first to the risk associated with the
Jan 1, 2005
-
Technologies For Emissions Reduction In The Metallurgical And Chemical Process IndustriesBy D. Schreuder
Conditions in the South African market relating to atmospheric emission control has changed dramatically over the last 10 years. Companies have become more responsible, environmentally aware, and have
Jan 1, 2006
-
Further Processing And Granulation Of Slags With Entrained Metal And High Metal Compound Content, With Specific Reference To Present Manganese Slag Dumps As Well As Additions Due To Daily ProductionBy D. Norval
Keywords: Pyrometallurgy, slag, metal, entrained, granulation, ferromanganese Water granulation of certain slags with high metal entrainment has customarily not been practised, not only due to the
Jan 1, 2011
-
The Use Of Commercial Oxygen Probes During The Production Of High Titania SlagsBy J. M. A. Geldenhuis
This work is concerned with studying possible reactions in the ilmenite furnace which may control the product quality of both slag and metal. Two different approaches were followed: comparing actual f
Jan 1, 1999
-
Air drying of fine coal in a fluidized bedBy E. S. Peters, M. J. van Rensburg, M. Le Roux, Q. P. Campbell
"The demand for energy has continued to rise worldwide in line with population growth. The majority of South Africa’s electricity is supplied by coal-fired power stations. The amount of fine coal (-2
Jan 1, 2015
-
Hot Work Modelling Of Two Equivalent Low Carbon Strip Steels Produced, Respectively, By The Cold Charge Route And By The Hot Charge RouteBy W. Stumpf
Mean flow stress analyses from plant mill logs for the conventionally produced hot rolled low carbon steel from the Ispat Iscor Vanderbijlpark strip producing plant, indicated a higher temperature sen
Jan 1, 2004
-
Determining Settlement Rates and Surface Stability Using In Situ Density of Backfill as a Proxy for DisplacementBy D. Fenn, A. du Kanda, D. Dukhan
"SynopsisGibb Consulting Services was contracted by Eskom Line Engineering Services to conduct an investigation to determine the absolute displacement to date and infer the current rate of displacemen
Jan 1, 2015
-
Development Of A Mathematical Model For Continuous Tank BioleachingBy L. Bircumshaw
Paper written on project work carried out in partial fulfilment of BSc (Eng) (Chemical) degree This paper details the formulation of a mathematical model for the simulation of a primary bioleach re
Jan 1, 2006
-
Pillar Failure in Deep Coal Seams: Numerical SimulationBy S. Badr, R. Mendoza, M. U. Ozbay, M. D. G. Salamon
ABSTRACT: The use of coal pillars at depth is fraught with problems due roof control difficulties and the possible occurrence of coal or pillar bumps. In the USA the largest and most important applic
Jan 1, 2003
-
Navigating Above-The-Ground Risk In The Platinum Sector (596af1fa-f653-4318-b2be-d27da8918b80)By A. Lane
The socio economic risks of mining in South Africa have been emerging for some time now, and have been brought into sharp relief by recent events in the platinum sector. The slow pace of social uplift
Mar 1, 2013
-
Navigating Above-The-Ground Risk In The Platinum Sector - SynopsisBy A. Lane
The socio economic risks of mining in South Africa have been emerging for some time now, and have been brought into sharp relief by recent events in the platinum sector. The slow pace of social uplift
Jan 1, 2013
-
The gas-dynamic method of calculation of explosion-proof distances during explosions of methane-air mixture in mines with regard to explosion protective structuresBy D. Yu. Paleev, O. Yu. Lukashov, A. Yu. Krainov, E. R. Shrager, I. M. Vasenin
The gas-dynamic method is presented of calculation of explosion-proof distances during an explosion of the methane-air mixture in mine working. On the basis of this method is modelled of shock waves i
Jan 1, 2003
-
Pushback 8 South ? A Case Study In Pit Slope ManagementBy P Knight, P A. Walker, H E. Speight
Pushback 8 South is the final cut back on the south wall of the East Pit at BHPBilliton?s Mt Whaleback iron ore mine in the Pilbara region of Western Australia. Development of the cutback commenced i
Jan 1, 2006
-
Preliminary Study Into A Mechanized Resue Mining Method For Deep Level MiningBy R. G. B. Pickering
Resue mining was practiced extensively in the East Rand in the first half of this century. The obvious benefits were that a higher grade of ore was trammed to the surface. The disadvantages were slow
Jan 1, 2000