Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Study on System of Fracturing Rock Result from Dynamic Water Pressure by Explosion

    By Qingshou Chen, Gongbo Li, Hengqian Ran

    A method for safe fracture of rock, concrete and other brittle solid material using dynamic water pressure by explosion is provided. The propagation of the pressure is studied with Allievi water hamme

    Jan 1, 2000

  • ISEE
    Improvements in Blasting Technology at Cliffs Natural Resources

    By Scott Giltner, Allan Koski

    Blasting is one of the lowest cost yet most critical parts of the mining cycle. This paper discusses the findings of an audit conducted on the blasting operation at an iron ore mine. The purpose of th

    Jan 1, 2009

  • ISEE
    Blasting Procedures at the Republic Mine

    By R C. Berglund

    Since the Republic Mine began production in the mid 1950's, drilling and blasting practices have continually changed. In recent years, progress has been achieved through the development of more precis

    Jan 1, 1980

  • ISEE
    Analysis of the Rock Mass by Geophysical Methods

    By France Goupil, Richard Barabe

    In 1987, a large company reopened its quarry located in a very dense urban area in Montreal-East. This reopening occurred after a long period of inactivity during which houses were built within 200 fe

    Jan 1, 1992

  • ISEE
    Fragmenting Oversize Boulders

    By J Mensah, G C. Sen

    Often large boulders of rock have to be fragmented in civil or mining engineering operations. These oversize boulders are encountered after primary blasts in both surface and underground excavations o

    Jan 1, 1989

  • ISEE
    The Evolution of Loading 4 1/2 Inch Diameter Upholes at Kidd Creek No. 1 Mine

    By R Malo, A Yetter

    The use of large diameter blastholes for underground mining began approximately twelve years ago and are now routinely employed in a variety of ore types and stope designs. These large boreholes, rang

    Jan 1, 1984

  • ISEE
    PPV. SD. Really? Still??

    By Doug Anderson

    Two quantities, Peak Particle Velocity (PPV) and Scaled Distance (SD), have controlled aspects of many blasting projects and operations for a long time. Vibration criteria typically use both PPV and S

    Jan 1, 2018

  • ISEE
    The Application of Likelihood Ratio Test to Blast Vibration Analysis

    By W. J. Birch

    The dedicated documenting of blast design and vibration monitoring results forms part of the best practice methodology for today’s blasting operators. This allows regression curves to be constantly up

    Jan 1, 2004

  • ISEE
    Flyrock Range & Fragment Size Prediction

    By Cameron McKenzie

    Flyrock is a complex issue involving interaction between the charging crew, the blast design, and the local geology, and once conditions on the shot meet certain criteria, the probability of a flyrock

    Jan 1, 2009

  • ISEE
    The Use of Slow Motion Video to Analyze Surface Blasts

    By David W. Zeeb

    The use of an ordinary VHS video camera and a four-head player can be an effective tool to analyze surface blasting. The necessary equipment can be purchased for under $1,300 and will allow frame by f

    Jan 1, 1992

  • ISEE
    Hydro Blasting of Boulders

    By Callie Covert

    This paper describes the application and results of a more efficient method of breaking boulders using dynamite and water. This method is being used for the disposal of boulders that result from pinna

    Jan 1, 2001

  • ISEE
    Computer Design and Field Application of Sub-Seam and Multi-Seam Blasts in Steeply Dipping Coal Seams

    Coal strip mine operators in Western Canada often mine steeply-dipping multiple coal seams in mountainous terrain. The ability to fragment the rock waste layers above and below these seams with minimu

    Jan 1, 1985

  • ISEE
    Blasting the Fulton Bottom River Crossing

    By E Emery Jr Gray

    The City of Richmond, in an effort to improve sewage treatment facilities, designed an invert syphon to cross the James River at Fulton Bottom. The design criteria called for installation of two 36-in

    Jan 1, 1979

  • ISEE
    Electrical Current Requirements in Tunnel Blasting

    By Deane Boddorff

    A 440 Volt AC power line is a typical power source for energizing electric blasting cap circuits in driving hard rock tunnels. A common misconception exists that the caps actually see 440 Volts. This

    Jan 1, 1975

  • ISEE
    The Use of Air-decks in Production Blasting

    By S B. Richardson, R E. Danell, D Mead, N T. Moxon

    Explosives provide a very concentrated source of energy which is often well in excess of that required to adequately fragment the surrounding material. Blast design, environmental requirements, produc

    Jan 1, 1993

  • ISEE
    Residential Structural Response to Airblast From Munitions Disposal at the McAlester Army Ammunitions Plant

    By Calvin L. Cumerlato, David E. Siskind

    The Bureau of Mines has monitored structural responses to airblast overpressure produced by munitions disposal at the McAlester Army Ammunition Plant. The Purpose of this study was to determine if the

    Jan 1, 1994

  • ISEE
    A Two Component Liquid Explosive (Quadrex-L) and Its Application

    By Jerome S. Brower

    Quadrex-L is a two component liquid explosive which was developed by J. S. Brower & Associates, Inc. to facilitate handling and shipping, and use in unique applications, while emphasizing safety. It m

    Jan 1, 1975

  • ISEE
    Shot Improvements through Field Controls: Applications of Passive Laser Survey Systems

    By B H. A Brown

    The components of passive laser survey systems and their relative functions are presented. A general outline of the capabilities and the information available are followed by two case histories. These

    Jan 1, 1990

  • ISEE
    Blast Design Optimization to Minimize Effect of Air Blast

    By Michail G. Egorov

    As well as destruction and moving rock, the blast energy sets up a seismic wave in the ground and a shock wave in the air, which can present danger to buildings and disturbance to human occupants. Thi

    Jan 1, 1996

  • ISEE
    Priming Procedures Employed at the Tallya Quarry

    By Janos Foldesi, Calvin J. Konya

    The determination of the number of primers necessary to efficiently initiate an explosive column charge is essential to good blasting. If the number of primer is insufficient, the total energy stored

    Jan 1, 1976