Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Advances in Desaturation of Sandy Soil to Mitigate the Liquefaction HazardBy Dhanaji S. Chavan, Thallak G. Sitharam
"It is well known that sites comprising of saturated loose sand undergoes large deformations, due to liquefaction, during seismic shaking. To cope with this, different mitigation techniques such as vi
Jan 1, 2017
-
An Approximate Nonlinear Analysis Of Vertically Loaded Piled Rafts In Layered SoilsBy Seung-hoon Lee
The use of piled raft foundations has been considered as an economical alternative to conventional piled foundations because a portion of the applied load is carried by the raft in the design of piled
Jan 1, 2008
-
Drilled Piers With Base Preloading By Grouting - 1. IntroductionBy Boleslaw A. Klosinski
Drilling of a pier hole is accompanied with stress releasing in the surrounding soil and often with loosening of soil at the pier base. In effect the drilled piers are more deformable than driven pile
Jan 1, 1995
-
Improving Very Compressible Soils By Stone Columns And Stiffening Concrete Columns ? SynopsisBy I. Stanculescu
The consolidation of thick and very compressible soil deposits by stone columns associated with cast-in-place plain concrete columns, has been performed for shallow foundations of some heavy industria
Jan 1, 2010
-
Development Of Design Practice For Piles In Stiff Glacial TillBy Kenneth Gavin
Design practice for piles installed in Irish glacial till has developed in an ad-hoc manner, based on the results of un-instrumented load tests. This had led to designers using similar design paramete
Jan 1, 2009
-
Installation Of Augered Cast-In-Place Piles - Equipment (1ca07ced-58e8-4100-8369-c2eebb984ebc)? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 2000
-
Load Test On A Model Pile Driven Into Sand ? SummaryBy A. Mazzucato
This paper presents the experimental results of driving and load tests on an instrumented pile driven into a test pit filled with fine homogeneous sand.
Jan 1, 2010
-
Harmonization and Status of Geotechnical Standards in EuropeBy Trevor L. L. Orr
"AbstractThe background to the harmonization of geotechnical standards that has taken place in recent years in Europe has been the move to more economic and political integration following World War I
Jan 1, 2014
-
Foundations For Offshore Wind Energy Converters - A Review Of Some Current Scandinavian Development ProjectsBy K. Viking
This article deals with some of the civil engineering related problems to be encountered when offshore wind energy projects transform from prototype offshore wind energy converter farms, developed and
Jan 1, 2013
-
Advances In Seismic Design Considering Soil- Structure InteractionBy Y. C. Han
The advances in seismic design considering soil-structure interaction or soil-pile-structure interaction are described using a substructure approach. The nonlinearity of soil is considered approximate
Jan 1, 2010
-
Bending Strength Of Threaded Micropile ConnectionsBy Steven R. Musselman
The bending strength and flexural stiffness of a micropile at its threaded connection is less than its intact strength and may fail due to thread slippage or by fracture through the pin (reduced cross
Jan 1, 2007
-
Piled Raft On Layered SoilsBy Luca de Sanctis
The analysis of piled raft foundations in layered soils may be performed by 3D finite elements or by approximate procedures. Among the latter, the code NAPRA (Russo, 1998) is based on the method of th
Jan 1, 2002
-
Reduction Of Local Scour Around Cylindrical Bridge Piers Using Upstream Protective PilesBy A. K. Bhattacharya
Cylindrical bridge piers are widely used and equations exist that can predict the maximum depth of local scour around such piers. Scour around piers is an undesirable phenomenon, as it requires the fo
Jan 1, 2009
-
Displacement And Pore Pressure Monitoring During Installation Of Drilled Displacement PilesBy Lisa M. Splitter
Drilled displacement piles were constructed as the foundation for a proposed 10-story building in San Francisco, California. At the study location, the stratigraphy consists of 14 to 21 feet of fill
Jan 1, 2009
-
Analysis Of Piled Raft Foundation ? SynopsisBy Gandhi
Piled raft foundation under uniformly distributed vertical loads has been analyzed using Finite Element Method. The soil is considered to be linear elastic, isotropic, homogeneous. The raft,pile and t
Jan 1, 1996
-
Drilled Shaft Side Shear Capacity In Compressible Materials What Influences Capacity?By J. A. Hayes
For over a decade the Osterberg Load Cell has been successfully used to determine the shear capacities of drilled shafts. Since the test method measures side shear directly, analytical complications d
Jan 1, 2003
-
8000 Series Piling RigBy Roger A. Bullivant
The introduction of this size and type of piling rig is intended to address a multipurpose foundation activity. The 8000 denotes the size of equipment that is attached to the mast, namely 8000 Kg. Lar
Jan 1, 1995
-
Load Test Analysis On Augered Pressure Grouted Displacement PilesBy Wei Zheng
A pulverized coal fired power plant is being built in Osceola, Arkansas, along the Mississippi River. The subsurface soil conditions consist of a certain amount of very soft clayey silt and clay under
Jan 1, 2007
-
Formation Of Interlocking Jet Grout Columns At Large DepthBy Chu E. Ho
Jet grout column formation at large depths are prone to several uncertainties, such as inaccuracy in setting out boreholes, drilling deviation, soil variability and reduced jetting energy at the nozzl
Jan 1, 2008
-
Tied-Back Offset Tangent Caisson Retaining Wall For The North Bulkhead Third Harbor Tunnel Project Boston, Massachusetts ? IntroductionBy Daniel L. Hanson
This paper presents a case history of the design, installation and performance of a tied-back tangent caisson retaining wall which was constructed as part of the Third Harbor Tunnel project currently
Jan 1, 1994