Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    High-swelling bentonite deposits in southwest Saskatchewan

    By M. J. MONEA

    Canada's only economic high-swelling bentonite deposit is mined in Wilcox, Saskatchewan, by A vonlea Mineral Industries Limited. The bentonite resulted from devitrified and altered volcanic ash releas

    Jan 1, 1984

  • CIM
    Corrosion of Aluminum Components in the Glass Curtain-Wall of a Building

    By F. N. Smith

    Corrosion was observed on the aluminum pressure plates and dress-caps that hold the glazing in place on a curtain-walled building, The multi-storey building in question is situated in the downtown are

    Jan 1, 2005

  • CIM
    New Perspectives in Gold Catalysed Oxidation

    By Serena Biella

    Gold has received a growing interest as a catalyst for the selective oxidation of organic molecules using oxygen under mild conditions1. In the liquid phase application small gold particles (2.5-7 nm)

    Oct 1, 2003

  • CIM
    Structural Geology Summary Of The Mcarthur River Unconformity-related Uranium Deposit, Athabasca Basin, Saskatchewan

    By S. Harvey

    The McArthur River deposit is a structurally-controlled unconformity-related uranium deposit. The mineralization is situated at the intersection of a pronounced fault zone, referred to as the P2 fault

    Jan 1, 2020

  • CIM
    Red Lake Gold Shore Mine

    By J. B. Mawdsley

    "The Red Lake Gold Shore mine is 4/5 mile west of the town of Red Lake, Ontario, and a mile northwest of the Howey mine. It came into production in August 1936, and in a little over 2 years produced 2

    Jan 1, 1954

  • CIM
    17th supplement to bibliography of Canadian contributions in the field of rock mechanics

    By P. E. Weidmark

    "Energy, Mines and Resources Canada has published the first in a new series of reports that will examine selected mineral products that are imported.""Vanadium - An Imported Mineral Commodity"" looks

    Jan 1, 1981

  • CIM
    Overcoming Invisible Barriers to the Implementation of Improvement Programs

    By Bish Chanda

    In the minerals business, like any other commodity-based business, management faces the daily challenge of holding down costs while the real prices of products are continually falling on an inflation-

    May 1, 2003

  • CIM
    Removal of Heavy Metals from Tailings Recycle Water at Mattabi Mines Ltd.

    By Jean-Guy L. Gauthier

    "With the Ontario Ministry of the Environment stipulating that the cumulative concentration of copper, lead, zinc and nickel in mine mill effluent must be no greater than 1.0 milligram per litre, it h

    Jan 1, 1980

  • CIM
    The Development and Operation of a High-Intensity Wet Magnetic Separator Circuit for Hematite Recovery at Wabush Mines

    By M. Beech-Jones

    The increased emphasis on the efficient utilization of capital and mineral resources has led to several new advances in the science of mineral separation. One example of a recent development is the ap

    Jan 1, 1979

  • CIM
    Recent Studies in the Porcupine Area

    By M. E. Hurst

    SINCE 1934 there has been a marked revival of interest in the Porcupine district, especially in the eastern portion of the area, where exploration on the property of Pamour Gold Mines has indicated th

    Jan 1, 1936

  • CIM
    A New Approach for Characterisation of Densely Fractured Rock Masses Using Artificial Neural Networks and Principal Component Analysis

    By R. B. Kaunda

    One fundamental requirement for surface and underground rock engineering is the ability to characterise the rock mass. An accurate characterisation of the rock mass allows rock engineers to optimize d

    Jan 1, 2015

  • CIM
    Porcupine Peninsular Mine

    By A. R. Byers

    "Porcupine Peninsular mine is at the extreme southwestern end of North peninsula in Night Hawk lake, Cody township, Ontario. It lies approximately 10 miles east of the gold-producing district of Porcu

    Jan 1, 1954

  • CIM
    Géologie de la Mine Agnico-Eagle, Joutel (Québec)

    By Jean-Marc Simard, Richard Genest

    "La mine Agnico-Eagle, localisée près de Joutel, a été découverte en 1962 par le forage d'anomalies électromagnétiques. Exploitée à partir de 1974, elle a déjà produit près de 30 tonnes d’or à partir

    Jan 1, 1990

  • CIM
    Crack Detection and Seal-Lock Casting Repair

    By E. Ettles

    This paper features some of the spectacular new advances in the fields of fluorescent penetrant inspection and magnetic particle concentration. Casting fractures in the various stages -before the repa

    Jan 1, 1971

  • CIM
    An Energy Based Approach to Quantifying the Response of AG/SAG Mills to Ore Blends

    Experimental determination of the response of an AG/SAG mill treating two components of significantly different impact resistance is challenging for two main reasons: firstly, small scale laboratory t

    Jan 1, 2012

  • CIM
    By-Product Molybdenite Plant Design

    By J. F. Shirley

    "Very seldom, if ever, is a molybdenite by-product plant operated exactly the way the process design engineer visualizes it. The best thing the design engineer can do is provide a sound, basic circuit

    Jan 1, 1981

  • CIM
    Development of the Bench Scale Isamill Signature Plot Test: Introducing the Eliason Test

    By H. E. Johnston

    There are currently a number of options in terms of plant feed comminution tests: Bond work index tests, JK drop weight and SMC tests, SPI, low impact crusher work index tests, to name a few. However,

    Jan 1, 2014

  • CIM
    Electrical Copper Slag Cleaning: What Holds the Future

    By A. Scheltema Beduin, M. Kalisch, E. Floch, R. J. Dijkhuis, H. J. Oterdoom

    In metallurgical copper production, the traditional aim is to increase recovery of copper to the maximum. SMS Siemag (SMS) has supplied numerous furnaces for this application. New targets are to make

    Jan 1, 2014

  • CIM
    A Consistent Rheological Model for Long Term Creep/Relaxation Behaviour of Cathode Material of a Hall-Héroult Cell

    By M. Fafard, D. Picard, J. -F. Bilodeau, G. Soucy

    To simulate adequately the behaviour of a Hall-Heroult electrolysis cell, a finite element model must take into account the properties of each material. However, it has some lacking knowledge on the m

    Jan 1, 2006

  • CIM
    Active area control in a fuel cell flow field

    By D. P. Wilkinson

    Flow field design is critical to determining fuel cell performance with respect to operating conditions. Flow fields are normally designed around their maximum power operating point with the goals of

    Jan 1, 2005