Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Trajectory Design and Economic Analysis of Asteroid Mining Missions to Asteroid 2014 EK24By S Dorrington, J Olsen, N Kinkaid
Several studies have been conducted on the economic analysis of mining near-Earth asteroids for resources for use in Earth orbit. While these studies use detailed economic figures of merit, they often
Nov 4, 2015
-
A Great Project Team - Bringing Together Location and CultureBy A M. Ebbels, D Pratt
The current commodities super-cycle has seen an explosion in the number of mining projects demanding human resources throughout the world. The demand for key personnel currently far outweighs the inte
May 24, 2012
-
Developments in the measurement of stress in rockBy I Gray
Other than being reasonably certain of the average vertical stress being lithostatic, there can be little certainty about stress in the ground. The stresses and strains in rock are a function of gravi
Nov 29, 2022
-
A Case for Change - Defining Mine Sealing and Understanding Flammable Mixtures During SealingBy A Mackay
As a result of the explosion in the 512 panel at the Moura No 2 mine in 1994 the role of the ventilation officer (VO) to submit sealing plans (on behalf of the operator/underground mine manager) has b
Jul 1, 2013
-
Project Management for All Seasons ù Financial Risk Mitigation in a Challenging WorldBy O C. Aitken
Mining project developers are committed to taking on all the challenges and obligations of financial risk management. It is interesting that our current models of project finance have not changed mark
Jan 1, 2004
-
Mine Road Design and Management in Autonomous Hauling Operations – A Research RoadmapBy R J. Thompson
In truck-based hauling systems, the mine haul road network is a critical and vital component of the production process. As such, underperformance of a haul road will impact immediately on mine product
Nov 22, 2011
-
Inadequate Water Management Planning Resulting in Long-term Closure LiabilitiesBy H J. J Boshoff
Mine closure planning integrated into life-of-mine (LOM) planning during the operational phase consists of many subcategories. One of these subcategories that needs to be fully integrated into the LOM
Jul 16, 2014
-
Full Cycle Tailings Management at Fosterville Gold MineBy L P. Gray
"From paving the way in gaining approval for the first metalliferous in-pit tailings storage facility (TSF) in Victoria, to developing a deposition methodology to optimise the storage capacity and pro
Oct 10, 2016
-
The Floatability Characterisation Test Rig as a Pilot Plant for Flotation Testing ù An OperatorÆs ViewpointBy J-P Franzidis, M Esvelt, E V. Manla
The Floatability Characterisation Test Rig (FCTR) is a self-contained, highly instrumented, mobile pilot plant that is able to treat up to 2 tph solids. It consists of a bank of six 130 L WEMCO« Smart
Jan 1, 2003
-
Engaging Society about a Potential Mining Future – Concerns and ExpectationsBy N Boughen
This paper synthesises the findings of five studies undertaken by the CSIRO Wealth from Oceans Flagship in 2009-10. This research explores the concerns, expectations, and information needs of a range
Nov 22, 2011
-
Equipment Set-Up of Kumera Steam Dryer Plants in Non-Ferrous Metal SmeltersBy I KylmSkorpi, H Mansikkaviita
The traditional direct-heated drying process has been replaced by the steam drying process in non-ferrous metal smelters, where steam is available from waste heat boilers. Many recent projects have se
Jan 1, 2008
-
Getting the Most out of Technology to Drive Mine Productivity ImprovementsBy K Sommerville, J Parkinson
"Open pit mines today have more technology and data available. The challenge is to effectively use resources to analyse and identify mine productivity improvements. AMC Consultants Pty Ltd (AMC) has c
Nov 15, 2016
-
Mine productivity and equipment selection impacts with operational grade engineeringBy A F. von Wielligh, M Scott, L Keeney
Operational Grade Engineering (GE) is the early (pre-processing) discard of low-grade mineralised and/or barren rock to improve the ore grade and/or reduce deleterious elements within the run of mine
Nov 10, 2020
-
Thickening at Karara – The Role of Test Work and Innovative DesignBy G Hart
As the iron ore/magnetite boom gains momentum, it is particularly important to question established past trends and explore the potential of alternative design options. Traditionally, ‘rule of thumb’
Jul 11, 2011
-
Evaporation and Salt Transport Under Variable Climatic ConditionsBy T Baumgartl, B Richards
The association of specific plants and plant communities with soils developed over underlying superficial orebodies and mineralisation has been long recognised. It has given rise to the use of plant i
Jul 10, 2012
-
From Blasthole to Reverse Circulation Sampling – Changing Grade Control Methods at Black Star Open Cut Zinc-Lead Mine, Mount Isa, QueenslandBy B Young
Variable bench heights, interaction with underground workings and a steeply dipping orebody are challenges faced daily by geologists at Xstrata Zinc’s Black Star Open Cut (BSOC) Zinc/Lead/Silver mine
Aug 22, 2011
-
Understanding Overlaps - Mining Tenure Versus the Rest of the WorldIt is a common misconception that the grant of mining tenure, whether it be an Exploration Permit, Mineral Development Licence or Mining Lease, will entitle the holder to access all land within it in
Jan 1, 2007
-
Mid Sampling and Reserve Estimation Practice in the Base Metal OrebodiesThe Mount Isa mine in North West Queens- land produces a total of nearly 10 million t/yr from separate copper and silver lead zinc orebodies. Sampling information is mainly obtained from diamond dr
Jan 1, 1987
-
The benefits of automated metallurgical accounting for plant samplingBy D W. Wall, J P. Vagenas
Questions of sampling precision and accuracy affect every process plant in differing ways and to differing extents. To address these perceived issues, chemists, metallurgists and engineers are often a
May 9, 2017
-
3D estimation of variables with complexity in cross-correlation structuresBy N Madani
Linear interpolation of geo-related variables is important to different aspects of mining engineering such as long and short-term mine planning. The ore deposit description attained from spatial model
Nov 21, 2018