Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The 250 million ton per annum spatial digital twin

    By M Pomery

    BHP’s Western Australian Iron Ore Operations (WAIO) move approximately 250 million tons of ore per annum. The magnitude of the constant changes to the terrain models along with the diverse output and

    Sep 18, 2023

  • AUSIMM
    Assessment of ground support requirements in coal burst-prone mines

    By J Watson, C Zhang, I Canbulat, C Wei

    Coal burst is defined as a dynamic release of energy within the rock or coal mass in underground coalmines that causes violent rock or coal ejection in the vicinity of mine excavations. It poses one o

    Nov 29, 2022

  • AUSIMM
    Strategic thinking about long-term ‘above ground’ orebody complexity using scenarios

    By T Craske, J Sykes, T C. McCuaig, M Jessell, A Trench

    The prevalent strategic approach in the mining industry is one of planning. However, it is widely recognised that planning does not work in complex and uncertain situations (Mintzberg, 1994), such as

    Nov 21, 2018

  • AUSIMM
    Blast Design Using Measurement While Drilling Parameters

    By M Higgins

    Measurement while drilling (MWD) techniques can provide a useful tool to aid drill and blast engineers in open cut mining. By avoiding time consuming tasks such as scan-lines and rock sample collectio

    Jan 1, 2001

  • AUSIMM
    Rapid Logging of Different Magnetic Phases in Banded Ironstones Using a Travelling Three-component Vector Magnetometer

    By C A. Foss, K Leslie, C Arnold

    Magnetic susceptibility measurements provide rapid, non-destructive testing of drill core, but cannot directly map magnetite and/or hematite content. Combined magnetic susceptibility and magnetisation

    Jul 13, 2015

  • AUSIMM
    Optimising Mobile Equipment Resources in Massive Mining

    Mobile mining equipment presents only a small portion (ten per cent mining project costs but the selected technology will determine to a large extent the mining performance and mine profitability. The

    Jan 1, 2000

  • AUSIMM
    Sampling of the Yeelirrie Uranium Deposit, Western Australia

    The discovery of economic uranium miner alisation in unique geological conditions at Yeelirrie, 700 km NNE of Perth, presented Western Mining Corporation Limited with a num- ber of sampling and eval

    Jan 1, 1976

  • AUSIMM
    The Use of Non-destructive Testing to Identify Defective Rock Bolts – A Case Study

    By B Jones, M Chappell

    Permanent rock bolts used to support rock tunnels are required to perform for the design life of the structure as a minimum. Quality of installation is critical to the performance over the life of the

    Sep 17, 2014

  • AUSIMM
    Mineralogical and Metallurgical Examination of Fluorosilicate Mineral Flotation in the Ok Tedi Circuit

    By Glatthar J. W, Lauder D. W, Manlapig E. V, Mackinnon I. R

    The Ok Tedi copper orebody consists of porphyry and skarn orebodies. The skarn orebodies, identified by different mineralogies, are the source of high intermittent fluorine levels in the mill concen

    Jan 1, 1998

  • AUSIMM
    Profitable and Productive Partnerships ù Optimising Coal Recovery in Close Proximity to the Hunter River

    By D Stacey, J Matthews

    Hunter Valley Operations in partnership with Orica Explosives designed a process to optimise coal extraction at depths greater than 65 m below the Hunter River in a safe and cost effective manner. The

    Jan 1, 2001

  • AUSIMM
    Application of an Integrated Liberation Leach Model for Process Optimisation

    By T D. H McGrath, R Byleveld, W P. Staunton, J J. Eksteen

    "The Gold Technology Group at Curtin University through the AMIRA P420 series of projects has recently developed the integrated liberation leach model (ILLM) for optimisation of gold plants. The model

    Oct 10, 2016

  • AUSIMM
    The Mining Industry Needs to be Shaken and Stirred

    By A S. Bamber

    Mining is the oldest industrial practice on the planet with a history dating back over 3000 years. Since the early iron age ores have been extracted for use in a variety of contexts by humankind, from

    Mar 26, 2012

  • AUSIMM
    Interacting with the Daily Operations and the Need to Plan for Future Rehabilitation

    Mine site rehabilitation is the repair of the disturbance caused by mining on the immediate mining area and also on the surrounding environment. The long-term objectives of rehabilitation can vary fro

    Jan 1, 2007

  • AUSIMM
    Deriving maximum value from mineral waste streams

    By D Osborne

    Current mineral extraction and valorisation activities still have a strong focus on the ‘delivered product(s)’ which might be a bulk commodity such as metallurgical coal, hematite, bauxite, etc., and

    Sep 1, 2024

  • AUSIMM
    Improving Production Drilling and Blasting in the Kim South Orebody at Agnew Gold Mine

    By T A. Carter

    In 2010 Agnew Gold Mine (AGM) struggled to produce the required tonnages from its stopes. The longhole rises used to create void in stopes were unreliable and often failed to gain the designed rise he

    Mar 24, 2014

  • AUSIMM
    Bit to Bag - The Importance of a Total Coordinated System in Reverse Circulation Drilling

    By M Goers, M Almond

    "The use of reverse circulation (RC) drilling for grade control sample collection was selected by the Pueblo Viejo Mine Geology department at the recommencement of the operation in 2010. This method w

    Aug 21, 2012

  • AUSIMM
    Effects of Using Electronic Initiation Systems on Blast Improvement

    With the iron ore industry in Australia producing hundreds of millions of tonnes of ore per annum, the associated costs of these operations extend into the billions. It is no surprise in the current e

    Jan 1, 2009

  • AUSIMM
    Tailing Thickener Operability and Control Improvements at ProminentáHill

    By J Lombardi, M Weidenbach

    "OZ MineralsÆ Prominent Hill copper-gold concentrator is located 650 km north-east of Adelaide, 130 km north-east of BHP BillitonÆs Olympic Dam operation and 130 km south-east of the regional township

    Oct 29, 2012

  • AUSIMM
    Coal Drift Construction by Tunnel Boring Machine

    By D Sibthorpe

    The employment of a tunnel boring machine (TBM) is the default delivery method for the realisation of traffic, utility and primary resource underground space worldwide, with hundreds of kilometres com

    Sep 17, 2014

  • AUSIMM
    Combining physical experimentation and mathematical modelling techniques in the simulation of induration and direct reduction processes

    By Wright JK, Turner RE, Batterham RJ, Morrison AL

    Simulation can play an important role in the design, optimization and control of complete industrial processes, the most appropriate method depending on the particular application. Most commonly,

    Jan 1, 1986