Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A process-based approach to mine rehabilitation decision making using Bayesian modelling and risk-based principles for dispersive spoil rehabilitation

    By E Thomas, L McCallum, G Dale, J Bennett, K Reardon-Smith, S Raine

    Sustainable closure of coal mines in Australia to a safe, stable, non-polluting condition remains one of the industry’s biggest environmental and social challenges. A significant proportion of mines i

    Jul 25, 2018

  • AUSIMM
    A comparison of CPT based state parameter estimates in coal boiler ash

    By B Wentzinger

    This paper presents the results of state parameter estimates in an active coal boiler ash storage facility using the most recent methods currently in use for cone penetrometer interpretation. State pa

    Jul 1, 2021

  • AUSIMM
    It’s all about People - Abstract

    By K D. Tuckwell

    The Treasurer, the Hon Wayne Swan, has nominated ‘maximising our advantages’ from ‘Mining Boom Mark II’ as the focus of the 2011/2012 Australian Budget. Australia therefore requires a bolder and bette

    Nov 22, 2011

  • AUSIMM
    What Women in Mining Want

    With the next mining boom looming, the industry will once again struggle to meet skills needed as the current generation boomers are set to retire. In order to meet these needs it is going to need to

    Jun 1, 2010

  • AUSIMM
    Optimisation of the Sepon Copper Milling Circuit

    By A Jakowetz

    OxianaÆs Sepon Copper Operation (part of the combined Sepon Gold and Copper Operation) is located in Savannaket Province, in southern central Lao PDR. The site is relatively remote, being some five ho

    Jan 1, 2006

  • AUSIMM
    Dynamic influences of optimisation on emissions

    By P J. Bangerter, J Pan

    Optimising for Net Present Value (NPV) with a strategic optimiser such as COMET, Prober-E, Blaser or Minemax has hitherto lacked a dynamic method for analysing the so-called third-order outcomes (such

    Aug 2, 2023

  • AUSIMM
    Starter dyke optimisation with Muk3D and GoldSim

    By C A. Cooper, G A. Suter

    The sizing of a starter dam for a Tailings Storage Facility (TSF) involves balancing many competing demands. It should cost as little as possible, be high enough to store tailings until the first rai

    Jul 23, 2018

  • AUSIMM
    Obstacles to Embedding Geometallurgy Decision-Making into Operations and how to Increase Maturity of this Critical Capability

    By G McCullough, B Mutsaers, J Jessop

    "*This is an abstract only* Geometallurgical initiatives have demonstrated considerable value to operations that have trialled them. However, it is extremely difficult for these initiatives to become

    Sep 29, 2013

  • AUSIMM
    From ‘closing a mine’ to ‘transitioning a community’ – evolving from specific post-mining land-uses to a holistic post-mining vision

    By A Maier, M Goldner, C Gimber

    Given the ongoing global crises of climate change and nature loss, with the World Economic Forum (WEF) identifying them as the top risks to global economies in terms of both likelihood and impact in t

    Aug 2, 2023

  • AUSIMM
    Measuring the influence of a sublevel cave on open stoping at Telfer

    By J Maxlow, M J. Woods, M P. Sandy

    The Newcrest Mining Limited Telfer operation comprises both open pit and underground operations producing gold and copper. The underground operation is made up of three production areas, the sublevel

    Nov 29, 2022

  • AUSIMM
    Landscape-scale Assessment of Watercourses in Remote Arid South Australia to Inform Mine Planning to Mine Closure

    By K White, C Ferguson, M Harding

    Understanding watercourses and river processes at a landscape scale is vital for managing risk to mining infrastructure and operations as well as minimising future environmental impacts beyond the lif

    Jun 28, 2016

  • AUSIMM
    Secondary means of egress via emergency gig

    By R Austerberry, S Green

    The discovery of the Cuffley Lode at Mandalay Resources Costerfield Operations provided an opportunity to extend mine life via mining the offset depth extension of the previously worked Alison Mine. A

    Mar 15, 2021

  • AUSIMM
    Alternatives to Conditional Simulation for the Estimation of Iron Grade Distributions ù A Case Study From BHP BillitonÆs Mt Whaleback Operations

    Conditional simulation can be used to determine the probabilities of block iron-grades being above selected cut-offs. However, there are much faster alternatives that can produce acceptable results. I

    Jan 1, 2005

  • AUSIMM
    Starting-Up the Ernest Henry Underground Mine – Thermal and Occupational Hygiene Challenges

    By O van Baalen

    The Ernest Henry Mine is a copper-gold open pit operation situated in northwest Queensland, Australia. It is owned and operated by Xstrata Copper, with a current throughput of 11 Mtpa, however, open p

    Mar 21, 2011

  • AUSIMM
    A Holistic Viewpoint for Selecting the Vertical Haulage System – Shafts and Conveyors

    By R M. Krek

    The haulage system used to convey ore from an underground mine to a surface stockpile at the mine process plant is a vital component of the mine’s overall infrastructure and economic viability. The sy

    Mar 24, 2014

  • AUSIMM
    Mass Blasting for Mine to Mill ù The AT04 Mass Blast, Kanowna Belle Gold Mine

    By D Kay, M Lovitt

    Mass Blasts are generally required at the completion of longhole stoping cycles to maximise the recovery of ore from a specific orebody. During the course of mining, the practice is to leave pillars o

    Jan 1, 2002

  • AUSIMM
    Bituminous Geomembranes in Mine Construction

    By R McIlwraith, B Breul

    "This paper discusses the successful use of bituminous geomembranes (BGMs) in mining applications since their development in 1974. It explains and illustrates the structure of a BGM composite, which i

    Jul 27, 2015

  • AUSIMM
    Exploration and Mining – The Need for Innovation

    By J F. H Thompson

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Mineral exploration and mining are challenging businesses. Remote and at times harsh condit

    Mar 18, 2015

  • AUSIMM
    Predictive Maintenance Using Simulation and Machine Learning

    By R Marchant, D Willingham

    "Predictive maintenance (also known as PHM or equipment ‘health monitoring’) refers to the intelligent monitoring of equipment to avoid future equipment failures. In contrast to conventional preventiv

    Oct 10, 2016

  • AUSIMM
    The Use of High Resolution Geophysical Technologies to Map the Base of Ore at BHP Billiton Æs Yandi Channel Iron Deposit

    By G Hall

    BHP BillitonÆs (BHPB) Yandi ore deposit is a channel iron deposit (CID) in the Pilbara district of WA. The ore is predominantly a goethite-hematite pisolite and overlays a clay at the base of the depo

    Jan 1, 2002