Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Alumina Inclusion Removal from a Stirred Steel Ladle: An Experimental Study

    A major problem in the continuous casting of aluminium killed strip steel is the incidence of black and grey lines in the strip surface caused by the alumina inclusions. One place for limiting the

    Jan 1, 1984

  • AUSIMM
    Improving Consistency of Delivery at Mt Rawdon Operation

    By M Boon, M Franklin

    This paper outlines the journey of cultural maturation and management system development at the Mt Rawdon (MRO) gold mine from its acquisition by Evolution Mining Limited (Evolution) in late 2011 to 2

    Jun 22, 2016

  • AUSIMM
    Production at Lift 530 m of Tongkuangyu Copper Mine

    By K W. Bian, Y M. Liu

    Tongkuangyu Copper Mine is currently the only mine in China employing block caving. It comprises two large orebodies known as the No 4 orebody and the No 5 orebody. They are approximately 50° in

    May 9, 2016

  • AUSIMM
    Life of Asset Planning, Uncertainty and Value Optimisation of the Iron Ore Business – From Exploration, to Market, to Closure

    By J McCluskey, N Barros

    "Long-term strategic planning at BHP Billiton’s Western Australia Iron Ore business aims for sustainable value maximisation of its large, long-life, low-cost, expandable mineral inventory and supply c

    Nov 24, 2014

  • AUSIMM
    Creating optimised drill programs that add real value, and integrate with mine planning

    By N Anderson

    With traditional grade control processes, geological models are created by geologists at the completion of the data collection stage and wireframe construction is closed off at a set date to allow for

    Mar 22, 2022

  • AUSIMM
    Genesis of the Large-sized Fozichong Lead-zinc Polymetallic Deposit, Guangxi, South China – Constraints from the Sulfide Mineralogy, Fluid Inclusions and Isotope Geochemistry

    By H Q. Zhang, M C Chai, W Fu, H Y Chen, L M. Wei, Q J. Yang

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Fozichong deposit – located in the south-western segment of the giant Qinhang metalloge

    Mar 18, 2015

  • AUSIMM
    Research on the throughput of inertia cone crusher using orthogonal experimental method

    By X Xia2, X Wang, G Liang, T Song, F Ma

    Inertia cone crushers have found applications mostly in steel slag crushing operations in China. Compared with conventional eccentric cone crushers, the crusher has an obvious advantage in reducing pr

    Aug 24, 2022

  • AUSIMM
    Optimisation of Ok Tedi's Medium-Term Production Schedules Using the Life of Business Optimisation System (LOBOS)

    By D Horacek, I K. Sheppard

    Ok Tedi is in a period of transition. By 2008 mill feed will consist of higher levels of high-grade but metallurgically challenging skarn ores. Additionally, the Taranaki pit will start production in

    Jan 1, 2007

  • AUSIMM
    The Circum-Pacific Map Project: Status Update, 1987

    By George G

    The Circum-Pacific Map Project is a cooperative international effort to prepare and publish geological, geophysical and mineral resource maps of the Pacific Basin and adjacent land areas. Earth sc

    Jan 1, 1987

  • AUSIMM
    Iron Ore Bedding & Blending at the Newcastle Steelworks

    Expansion of the B.H.P. Co. Ltd. mater ials handling facilities, at their Newcastle Steelworks, began in 1964 and continued until 1970. The present complex handles the annual iron ore requirement o

    Jan 1, 1972

  • AUSIMM
    Mount Isa Mines - 1100 Orebody, 35 Years On

    By S DeKruijff

    The Mount Isa Mines Copper Mine in Mount Isa started producing copper in 1966. The Copper Mine gradually increased production rates to nearly six million tonnes per year. Over the last three years the

    Jan 1, 2000

  • AUSIMM
    Improved assurance for Mineral Resource and Ore Reserve estimates and reporting through peer review and auditing

    By M A. Noppé

    Mining is inherently a risk-based business and risk governance is an integral part of corporate assurance and business decision-making. Mineral Resources and Ore Reserves are the key assets for a mine

    Sep 20, 2017

  • AUSIMM
    Effect of sodium sulfite on flotation behaviour of bornite and tennantite

    By G P. W Suyantara, Y Tanaka, T Hirajima, Y Aoki, K Sasaki, H Miki

    The effect of sodium sulfite (Na2SO3) on the flotation behaviour of bornite and tennantite is reported in this work. Flotation tests were performed using pure minerals of bornite and tennantite under

    Aug 24, 2022

  • AUSIMM
    Some Aspects of Loss Control

    During the 22 years that Isa Mine has been formally involved in accident prevention, it has succeeded in reducing its lost time injury frequency rate by 70 per cent. At present its performance com

    Jan 1, 1975

  • AUSIMM
    Process Control Applications in the Lead and Copper Smelters of Mount Isa Mines Limited, Mount Isa, Queensland, Australia

    By Pirvics AI, Whitworth NR, Tuppurainen JMI

    Process control applications to the unit operations in both the Lead and Copper Smelters are reviewed. The basic aim of this control is to smooth plant inputs to produce an output of consistent qu

    Jan 1, 1984

  • AUSIMM
    Optimising Western Australia Magnetite Circuit Design

    By D David

    The development of Western Australian magnetite deposits has lead to the design of some of the largest grinding mills and plants in the world. One of the projects demonstrates the efficiency gains po

    Aug 8, 2011

  • AUSIMM
    The Development Of L44 Ventilation Shaft (Surface To 11 Level), Mount Isa Mine Limited

    By Martin R. E

    L44 Shaft is a major upcast ventilation shalt in the hanging wall of the 1100 Orebody. Various techniques for stripping a raisebored pilot hole were combined to produce L44 shaft. From the surface

    Jan 1, 1977

  • AUSIMM
    Simulating Integrated Hydrology in Mining Catchments from Planning to Closure

    By S Szylkarski, D N. Graham

    In mining, water management is an operational necessity, requiring planning and detailed engineering, as well as risk assessment. Yet, the hydrology of streams and aquifers typically extends well beyo

    Jun 28, 2016

  • AUSIMM
    The Imperial Smelting Furnace-Hearth and Raceway Considerations

    Consideration is given to the factors affecting raceway activity and the hearth design of a zinc-lead blast furnace. Results of measurements made on operating furnaces are given and comparisons ar

    Jan 1, 1981

  • AUSIMM
    Understanding Tailings Geochemistry - Continuous Learning and Innovation When Planning for Mine Closure

    By N Kawashima, R St C Smart, A M. Robertson

    This paper focuses on a case study at a base metal mine located in a tropical semi-arid area of Western Australia (WA). It is demonstrated that understanding the geochemical nature of the mine tailing

    Jul 10, 2012