Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Controlled Explosives Demolition of Concrete Bridge – Canberra 2010: Blast Design, Procedures, Risk Assessment and Execution

    By N Elith

    The explosives demolition of a post-stressed, steel reinforced, concrete road bridge in Australia’s capital city, Canberra. The bridge was 50 m from the new replacement bridge, 320 m from community st

    Nov 8, 2011

  • AUSIMM
    Continuous Casting of Steel in Australia

    In November, 1967, a four strand curved mould continuous casting machine coupled with a 50 ton basic oxygen furnace began producing billets for the rod mill and new merchant mill at the Newcastle S

    Jan 1, 1972

  • AUSIMM
    Microalgae in mining – environmental and social opportunities

    By A E. Levett, J Durbin

    The environmental, social and governance (ESG) obligations of mining companies promote the consideration of water and land resources as well as the post-mining employment opportunities following the c

    Aug 2, 2023

  • AUSIMM
    Environmental Variables at Bauxite Mine

    By A Romanel, M S. Kato, M P. Piermatei, P Artioli

    "Brazil is the sixth worldwide producer of aluminum and Votorantim (Metals) has been operating three bauxite open pit mines in a particular way of working. In those the deposits occur on the top of hi

    Jul 10, 2012

  • AUSIMM
    Ferroalloy extraction from a Zimbabwean chrome ore using a closed DC furnace

    By S Bright, M J. Masamvu, E K. Chiwandika, S Dandi, S M. Masuka

    The depletion of high-grade hard and lumpy chrome ores has forced Zimbabwean ferrochrome producers to resort to low-grade friable ores that have an average of 28 per cent fines against a set limit of

    Jun 19, 2024

  • AUSIMM
    Is Perception Reality? Evaluating the Fiscal Attractiveness of International Jurisdictions for Gold Mining Investment

    By J P. Sykes, C Gemell, A Trench

    The perceived and actual impact of government mineral policy upon the government share from gold mining revenues is assessed for ten key countries in which the gold sector is of relevance in advancing

    Jun 22, 2016

  • AUSIMM
    Situational 3D variography – determining the variogram in the context of geology

    By P Gleeson, J Coombes, P Suresh, T McLennan

    The last 20 years have seen a dramatic rise in the use of 3D visualisation and modelling for geological data, but there has been relatively little effort to do the same for the variogram models that u

    Sep 20, 2017

  • AUSIMM
    Design of raise caving operations in LKAB mines

    By T Ladinig

    Raise caving is a novel cave mining method, which has been proposed for mass mining at increasing mining depths in LKAB operations. The method makes use of the raise mining technology and an active st

    Mar 29, 2023

  • AUSIMM
    A review of dynamic energy-absorbing cable bolts

    By P Craig, M Holden, C Zhang, D Foster, J Oh, S Saydam, J Liu, H L. Ramandi, S Akdag

    High stress in rock masses can cause significant instability problems such as squeezing deformation in soft rock and rock bursts in hard rock. The support system applied in burst-prone areas in high-s

    Nov 29, 2022

  • AUSIMM
    Optimisation of Complex Gold Processing Plants with Multiple Unit Operation Constraints – the Newcrest Planning Scheduler

    By D R. Seaman, R P. Tooher, B A. Seaman

    "Several mine scheduling tools exist for use in optimising and scheduling the reserve according to in situ value. These tools generally value the ore on a per block basis according to regressed recove

    Oct 10, 2016

  • AUSIMM
    Dynamic Simulation as a Test Bed for Emerging Technologies

    The adoption of new technologies is accompanied by risks that the stakeholders will wish to understand and minimise. The process of developing a dynamic simulation and the plant it will be used in pro

    Sep 26, 2011

  • AUSIMM
    Safety Support Functions for Underground Network Communications

    By A Noack

    Today underground infrastructures, like tunnels and especially wide spread underground mines, are often equipped with ethernet based communication systems. These networks are used for the unified comm

    Sep 26, 2011

  • AUSIMM
    Raise bore stability and risk assessment empirical database update

    By A Penney, M J. Pascoe, R M. Stephenson

    The empirical McCracken and Stacey stability and risk assessment method has been in use for more than 20 years to assess geotechnical stability issues for raise bored shafts. The methodology has been

    Nov 30, 2018

  • AUSIMM
    Precious Metal Mineralisation Associated with the Cretaceous Paparoa Metamorphic Core Complex, New Zealand (3428ebb2-83b2-4e2a-8824-6915d545a47a)

    Reconnaissance geochemical exploration in the vicinity of low angle detachment faults which bound the core of the Paparoa metamorphic core complex yielded Au up to 14 ppm, with 35% of greywacke, gran

    Jan 1, 1995

  • AUSIMM
    Grade Control Sampling and Ore Blocking: Optimisation Based on Conditional Simulation

    By Khosrowshahi S

    The objectives of grade control remain unchanged but new methods are being developed to attain them. Since the early-1990s, an improvement in the power of mine site computers has made the geostatist

    Jan 1, 1997

  • AUSIMM
    Optimisation in Underground Mine Design

    Optimisation and sensitivity analysis of final pit limits is now an accepted procedure for open pit planning studies. Tools to assist the design engineer in an underground metalliferous mine to make

    Jan 1, 1995

  • AUSIMM
    Bulk sensing for effective ore sorting – learnings over 35 years

    By H Kurth, L Balzan

    The potential for bulk diversion was identified and quickly implemented following the development of bulk sensing technologies applied to conveyed flows. In the early 1980s real time analysis of ash i

    Nov 10, 2020

  • AUSIMM
    BioHeap® – Breaking the Grade/Recovery Curve for Nickel Concentrators

    By J Fewings, T McCredden, S Seet, C Fitzmaurice

    "Flotation of nickel sulfide ores are generally constrained by nickel grade and impurity concentrations (notably magnesium and arsenic) in the product delivered to smelters. Being a physical separatio

    Oct 10, 2016

  • AUSIMM
    Installation of an Underground Dispatch System and its Use in Business Performance Management Within OsborneÆs Mining Department

    Within the Business Process Improvement Program initiated at Placer Dome during 2003 was the Business Performance Management Project (BPM).BPMÆ s aim has been to extract productivity improvements from

    Jan 1, 2005

  • AUSIMM
    Strategic Diversity in Smelting

    To secure a sustainable competitive advantage some smelters may need strategies based on flexibility in feed and product ranges depending on immediate future projections of profitability. This paper

    Jan 1, 1996