Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Stochastic Production Scheduling – Solution through Langrangian Relaxation with the Branch-and-cut AlgorithmBy S Chatterjee
The production scheduling of an open pit mine determines the optimal extraction sequencing that significantly impacts a mine’s life as well as net present value. The optimisation of production schedul
Nov 24, 2014
-
Geophysical studies of the Nena massive sulphide and Frieda porphyry copper deposits, Papua New GuineaSince 1969, a substantial number of geophysical methods have been applied in the search for porphyry copper and mesothermal type -sulpha-de deposits. These have assisted with geological mapping as wel
Jan 1, 1994
-
Quantification of Drill Hole Deviation – Century Mine Case StudyBy C D. Pocock
Maintaining catch berm capacity in open pit mines through controlled blasting prevents production delays associated with managing risks associated with wall instability. A method has been developed to
Nov 8, 2011
-
Cost-Benefit Comparisons of Ecological Risk Against Water Management Options in the Finniss River System, AustraliaQuantitative probabilistic ecological risk assessment has been used to evaluate the likely effect on fish diversity and abundance of filtered and bioavailable metals in streamwater affected by acid dr
Jan 1, 2003
-
Solving a Large Stochastic Integer Programming Model for Production Scheduling at a Gold Mine with Multiple Processing Streams and Uncertain GeologyBy M de Freitas Silva
One of the main steps during the decision-making process of long-term mine planning is the definition of the optimal sequence of extraction, which usually is synonymous with maximising the discounted
Nov 24, 2014
-
Recovery of Gold from Gravity Tailings by FlotationThe purpose of this study was to investigate the effectiveness of froth fl otation for the recovery of gold from the gravity tailing stream of the former Lihir Gold Limited (LGL) operation in Ballarat
Aug 1, 2010
-
Report on the Council of Mining and Metallurgical InstitutionsIt is my role at this juncture to report to you on behalf of the Council of Mining and Metallurgical Institutions itself. In essence, the Council is an orbital body - a little like Halley's C
Jan 1, 1986
-
A Stochastic Optimisation Formulation for the Transition from Open Pit to Underground Mining within the Context of a Mining ComplexBy J MacNeil, R Dimitrakopoulos
As open pit mining of a deposit deepens, the cost of extraction may increase up to a threshold where transitioning to mining through underground methods is more profitable. This paper provides an appr
Nov 24, 2014
-
A Study of Solid State Prereduction as a Precursor to Smelting for Transition Metal ProductionTraditional methods for the production of transition metals from their ores usually include the electric arc smelting of the ore or concentrate to produce a ferroalloy. This is subsequently refined
Jan 1, 1997
-
Unravelling the Factors Impacting on Concentrate Quality by Geometallurgical Data Analysis at Fortescue Metals Group’s Iron Bridge Magnetite MineBy A Manfrino
The Iron Bridge magnetite mine and infrastructure project is currently in development as a joint venture between Fortescue Metals Group, Formosa and Baosteel. It is supported by an extensive database
Jul 13, 2015
-
Design and Construction of Tunnels for Northern Gateway Project, New ZealandBy M Behrens, A McPhee, B D. Hegan
This paper describes the design and construction of twin 400 m long road tunnels as part of the Northern Motorway Extension Project in Auckland, New Zealand. Construction of the tunnel civil works is
Jan 1, 2008
-
A Predictive Model for Beneficial Use of Rehabilitated Mine Tailings for Grazing Cattle after Mine ClosureBy B N. Noller, J C. Ng, S L. Bruce
Mining activities can result in the transfer of harmful elements, including arsenic and lead, into the environment. In Australia, one of the potential future uses of rehabilitated mine land is to stoc
Jul 16, 2014
-
Integrated Landforms for the Storage of Tailings and Waste Rock at Magnetite Mines in Western AustraliaBy D R. Anstey
The mining of magnetite iron ore in Western Australia will generate large volumes of waste rock and tailings over many decades. The need to dispose of these materials will result in massive waste land
Jan 1, 2009
-
A Comprehensive Dynamic Model of the Pierce-Smith Copper Converter: A First Step Towards Better Converter-Aisle OperationBy I T. Cameron
The commercial production of copper metal involves a sequence of purification stages. One step of this process eliminates bulk quantities of iron and sulphur from matte Cu2S(FeS to produce blister con
Jan 1, 1998
-
Moriarty was a Conglomerate – Experiences and Implications of Coal Mining under Massive Strata in the Newcastle CoalfieldBy M Creech
During the 1990s, wider and more productive longwall panels were being introduced into the Newcastle Coalfield. The strata of the Newcastle Coalfield incorporate numerous massive sandstones and conglo
Aug 18, 2014
-
Experiences from developing a road map to attractive, inclusive and safe mining workplacesBy L Abrahamsson
The aim with this paper is to discuss experiences from the ongoing research project ‘Attract: A roadmap to attractive, inclusive, and safe mining workplaces’. The project’s aim is to analyse possibili
Sep 1, 2024
-
Goafstream Sampling and the BarometerBy M Brady
"It has long been recognised that the barometer infl uences areas of underground coal mines that havebeen sealed off from the current, or active, mine workings but it appears litt le formal research h
Jun 1, 2012
-
Preparing for Uncertain Mineral Futures - A Survey of AusIMM Members on the Future Issues and Drivers for the Australian Minerals IndustryBy C Mason, A Littleboy
This paper presents the results of a large scale survey of The Australasian Institute for Mining and Metallurgy (AusIMM) membership. This survey aimed to understand and define the key issues and drive
Jan 1, 2009
-
Variographic case study for designing, monitoring and optimising industrial measurement systems – the missing link in Lean and Six SigmaBy O Bøckman, E Thisted, K H. Esbensen, U Thisted
Process industry measurement systems, once installed, are often interpreted as static black boxes delivering correct values as long as not proven otherwise. After first implementation and set-up with
May 9, 2017
-
Role of Environmental Ore Deposit Models in Resources DevelopmentBy Y T. J Kwong
With the recent emphasis worldwide on environmental protection and sustainable development, finding an enriched mineral deposit no longer guarantees mining development. Only if the identified resource
Aug 22, 2011