Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Water Management at BHP Billiton Olympic Dam

    BHP Billiton Olympic Dam produces copper cathode, uranium oxide concentrate and refined gold and silver. The operation is comprised of an underground Mine and Processing Plant and is located 560 km no

    Jan 1, 2006

  • AUSIMM
    The Resource Valuation and Optimisation Model Real Impact from Real Options

    By C Tonkin, S D. Howell, P V. Johnson, J Moriarty, P W. Duck

    This paper presents the scientific framework underpinning the resource valuation and optimisation model (RVOM). The RVOM is a partial differential equation based real options software package, which h

    Sep 26, 2011

  • AUSIMM
    Design and Development of Energy-efficient Secondary Axial Flow Fans

    By J J. L du Plessis, S Viviers, G Ratner

    Escalating electricity costs are one of the biggest operational cost drivers in mining. The trend to use high-powered auxiliary fans delivering increased airflow to meet the dilution requirements of d

    Aug 31, 2015

  • AUSIMM
    Can biocements stabilise tailings storage facilities?

    By G Simpson, S Dressler, A E. Levett

    Tailings storage facilities often represent a mining operation’s most significant liability, posing serious environmental, social and safety risks. Almost all mining operations dispose of wet tailings

    Aug 2, 2023

  • AUSIMM
    A Multiple Blasthole Fragmentation Model – Its Concept, Formulation, Capability and Field Comparison Examples

    By R Yang

    This paper presents a fragmentation model for large production blasts in an open pit or underground environment. The paper shows that the particle velocity is directly related to pressure, strain, and

    Aug 24, 2015

  • AUSIMM
    Grade engineering at Gramalote gold deposit, Colombia: an example of industry – research collaboration, Part 2

    By N Clarke, J Hunt, A Barros, N Guerrero, L Keeney

    Grade Engineering® (GE) involves a range of integrated technologies and operating protocols for improving effective feed grade through early rejection of low value material prior to costly processing

    Nov 10, 2020

  • AUSIMM
    Enhancing Risk Management in Strategic Mine Planning through Uncertainty Analysis

    By C Fricke, R Wood, P Velletri

    "In a climate characterised by an ever increasing focus on cost reduction and maximising the utilisation of existing assets and infrastructure, understanding the uncertainty associated with alternativ

    Nov 24, 2014

  • AUSIMM
    Reducing the Energy Required in Grinding Clinker to Cement – Some Case Studies

    By H Benzer

    Grinding clinker to finished cement consumes more energy than any other comminution process. World production of cement in 2009 was 2840 million tonnes and the energy required for comminution was 40-6

    Aug 8, 2011

  • AUSIMM
    Characterisation of Gold Ores by X-Ray Computed Tomography – Part 1: Software for Calibration and Quantification of Mineralogical Phases

    By L E. Howard

    Micro-computed tomography (Micro-CT) is an X-ray imaging technique that produces high-resolution 3D computerised ‘virtual’ models of geological specimens based on the X-ray attenuation of different ma

    Sep 5, 2011

  • AUSIMM
    The Cenozoic Detrital Iron Deposits of the Hamersley Province of Western Australia – A Tribute to Mal Kneeshaw

    By R C. Morris

    Two major types of economic secondary iron ores occur in the banded iron formation (BIF)-rich Hamersley Province of the Pilbara, Western Australia:dominant BIF-hosted bedded iron deposits (BID)detrita

    Jul 13, 2015

  • AUSIMM
    Research on the Shape and Particle Size Distribution of Caved Ore Mass in Sublevel Caving

    By G J. Zhang

    The shape and particle size distribution of caved ore mass in sublevel caving were investigated in this study. The paper first reviews the main factors affecting the shape and characteristic of caved

    Jul 11, 2011

  • AUSIMM
    Issues in Capital Raisings and Disclosure

    By B Dodd

    This paper details how the Australian Securities and Investments Commission (ASIC), as a disclosure and conduct regulator, approaches regulation of continuous disclosure, capital raising and control t

    Nov 20, 2012

  • AUSIMM
    Visualisation of calculated thermodynamic properties by integration of FactSage™ with SEM-EDS element maps

    By S Mitra, D O’Dea, N Barrett, T Honeyands, E Copland

    This work describes a novel mapping technique that allows the direct overlay of calculated local phase equilibria on micrographs of the physical system. The technique demonstrated integrates FactSage™

    Jun 19, 2024

  • AUSIMM
    The Underground Quarrying of Backfill Material - A Potentially Viable Option

    By A C. Robertson

    Studies by Tennent, Isokangas Pty Ltd (TIP) have indicated that underground quarrying of backfill may be a cost competitive option for providing backfill for specialised situations in underground mini

    Jan 1, 1998

  • AUSIMM
    The Path to Best Practice at Geita Gold Mine

    By M Monaghan, B S. Gregory

    The Geita Gold Mine is located 80 km southwest of the town of Mwanza in the north-west of Tanzania and is 100 per cent owned by AngloGold Ashanti Limited. Open pit mining commenced at Geita in 2000. I

    Sep 18, 2012

  • AUSIMM
    Mathematical Approach for Better Mine Waste Rock Dumping Management

    By Y Li, D J. Williams, E Topal

    A mine waste rock dump does not have any intrinsic value, yet is an inevitable structure in surface mining operations. Since the purpose of mining is to maximise profit, possible expenditure reduction

    Jul 10, 2012

  • AUSIMM
    Mineralogical Characterisation of Iron Ores From Noamundi, India With Special Emphasis on Beneficiation of Iron Ore Fines

    By V Kumar, A S. Venkatesh, R K. Upadhya

    The enormous iron ore deposits of eastern India are part of the volcano-sedimentary basins containing iron and to some extent manganese deposits that belong to the Iron Ore Group (IOG) of Archaean Sin

    Jan 1, 2005

  • AUSIMM
    Wall control blasting – the influence of engineering geology on blast design

    By T N. Little

    This paper is concerned with the influence of engineering geology on design of Wall Control Blasts. In the Introduction, the Blast Management Framework and the Blast Design Requirements classification

    Jun 22, 2022

  • AUSIMM
    Put some Slag in your Life the Keynote Address

    I wish that in addition to being a Pro- fessional Engineer I was also a communications expert. My principal task this morning, and yours after this meeting, is to convince a wide variety of individ

    Jan 1, 1979

  • AUSIMM
    Rehabilitation at Strongman Mine, West Coast, New Zealand

    Coal mining ceased at Strongman Mine this year after 70 years of production. Underground mining finished in 2003 and opencast methods began in 1998. During the life of the mine, 8 million tonnes of co

    Jan 1, 2006