Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Deformation and failure-time prediction in rock mechanicsBy Barry Voight
The law [ ] where [ ] is a measurable quantity such as strain and A and cu are empirical constants, describes the behavior of materials in terminal stages of failure under conditions of approximately
Jan 1, 1989
-
Design, Construction, and Start-up of Stillwater Mining’s East Boulder ConcentratorBy P. Lefebvre, J. Sargent, K. Major, B. Darnton
"Stillwater Mining commenced mining operations at Nye, Montana in 1987 for the recovery of platinum and palladium. Exploration identified that the J-M Reef extended for 43 km. In 1998 Stillwater Minin
Jan 1, 2003
-
Comment On The Paper ?Strong Ground Motion And Site Response In Deep South African Mines?, By S.M. Spottiswood And A. M. Milev - In The Journal Of The SAIMM, Vol. 105, No. 7, Pp. 515?524In their excellent paper, Milev and Spottiswoode have provided quantitative and definitive descriptions of an important phenomenon that hitherto has been largely the subject of conjecture. They conv
Jan 1, 2006
-
New online/atline splitter designs for laboratory automation – feasibility resultsBy A Hollweg, K H. Esbensen, M Lischka
Two new splitter designs for intercepting moving streams of matter are presented, the variable cross-stream splitter (vCSS) and the rotary stream splitter (RSS), which are intended for implementation
May 9, 2017
-
Geology - Tectonic History of the Basin and Range Province in Utah and Nevada (Mining Engineering, Mar 1960, pg 251)By J. C. Osmond
One of the least known geologic regions in the U.S. is the area now called the Basin and Range Province. It is paradoxical that so little geologic information has been compiled for a province that has
Jan 1, 1961
-
OFR-115(1)-78 Study Of Mine Fires And Mine Ventilation - Part I - Computer Simulation Of Ventilation Systems Under The Influence Of Mine Fires - SummaryBy Rudolf E. Greuer
The existing computer programs for the simulation of ventilation systems under normal ventilation conditions are reviewed and a suitable program for including the influence of mine fires is selected.
Jan 1, 2011
-
RI 8686 Molybdenum Removal From Concentrator Waste WaterBy R. O. Dannenberg
The Bureau of Mines conducted laboratory batch and small-scale continuous tests to remove traces of dissolved molybdenum from water simulating waste discharged from a molybdenum concentrator, Molybden
Jan 1, 1982
-
Comparison Of The Tag Mound And Stockwork Complex With Cyprus-Type Massive Sulfide Deposits: Results From Leg 158 DrillingBy Mark D. Hannington
Drilling of the active Trans-Atlantic Geotraverse (TAG) deposit during ODP Leg 158 indicated that the size of the mound-stockwork complex is approximately 3.9 million tonnes, including 2.7 million ton
Jan 1, 1998
-
Selecting and Using Large Walking Draglines for Deeper Overburden StrippingBy N. B. Pundari
Proper selection of large walking draglines, based on sound engineering principles and field experience, has not kept pace with the large capital expenditures needed to buy these stripping machines. T
Jan 4, 1981
-
Study on Selectively Separating Iron Constituents in Copper Smelting SlagsBy Hongyang Cao
The iron constituents selectively separated from the modified copper slags by magnetic separation and flotation.were studied. The results of magnetic separation for modified copper smelting slags show
Jan 1, 2009
-
Seismology in the design of mine layoutsBy S. M. Spottiswoode, J. A. L. Napier, M. Kataka
The move away from the use of strike stabilising pillars at depth and the adoption of the more flexible system of mining towards final dip remnant pillars brings new opportunities for optimising mine
Jan 1, 2003
-
SIU-Sim: A Novel Coal Preparation Plant SimulatorCoal preparation plant simulators are used to study flowsheet alternatives and determine product quality and quantity that can be produced under various operating conditions for individual circuits. S
Jan 1, 2008
-
A New Model to Improve Ore Grade Reconciliation Between the Exploration Model and the MineThe poor reconciliation between the values of estimated and actual grades can cause major economic losses to the mining industry. In a mining operation grade reconciliation is comparing the values of
Dec 6, 2010
-
Assessing the Total Cost of Representativity in Flotation PlantsBy D. Brand
"The risk management objective of the AMIRA Code of Practice for Metal Accounting has seldom been systematically investigated in the literature up to the authors’ knowledge. Risk is defined in the Aus
Jan 1, 2017
-
Innovative Riverbank Erosion Control Retaining Wall System for the Brazos RiverBy Tracy Brettmann, Will Bohlen
An innovative retaining wall design consisting of tangent drilled shafts with supplementary seal piles was used to limit continuing bank erosion along the Brazos River in Southeast Texas. The riverban
Jan 1, 2018
-
Slurry Wall Design For Hong Kong StationBy Stephen T. Young
The construction of Phase 2 of Hong Kong Station, its retail podium and International Finance Centre Two, the tallest building in Hong Kong, will be completed in the middle of 2003. This paper describ
Jan 1, 2003
-
IC 8076 Processes For Recovering Sulfur From Secondary Source Materials ? Introduction And SummaryBy B. K. Shibler
During a research program to develop improved methods for recovering elemental sulfur and useful sulfur compounds from secondary source materials, the technical literature was searched for pertinent a
Jan 1, 1962
-
Some Effects of Wood, Cement, and Aluminium Sulphate on Flotation of Broken Hill Lead-Zinc OreResults of flotation tests on lead-zinc ore from Broken Hill, N.S.W., confirmed that flotation at pH 9 in the presence of cement gave poorer metallurgical results than flotation at pH 7. Additions of
Jan 1, 1974
-
Circulating Air Classification of Manufactured SandCirculating Air Classification of Manufactured Sand Due to environmental concerns, the supply and use of natural gravel has been limited by the Swedish government. The Swedish concrete industry is th
Sep 13, 2010
-
Variable speed SAG millingBy M. N. Brodie
"The ability to adjust the speed of a SAG mill offers benefits to the process and to equipment maintenance. It can be provided with some slight effect on availability ranging from somewhat enhanced to
Jan 1, 2003