Search Documents

  • ISEE
    Presplitting Techniques for Conventional, Air Deck and Dimension Stone Applications

    "The objective in controlled blasting is to reduce overbreak to control the final pit wall slope, shaft, drift ditch, bench, etc. to the final planned excavation limit. The six main types of controlle

    Jan 1, 1994

  • AUSIMM
    The Effect of an Excessive Addition of Copper Sulphate on the Flotation of Sphalerite

    By Dunkin H. H

    Flotation tests in a laboratory flotation cell at pH 8-8.5 and other sui}plementary tests were carried out on sphalerite-quartz and sphalerite-pyrite-'quartz mixtures. Depression of sphalerite re

    Jan 1, 1954

  • AUSIMM
    Notes on Ore Occurrences in Highly Metamorphosed Precambrian Rocks

    S. R. Carter (Mount Isa Mines Ltd., Mt. Isa): I found many ideas to interest me in Haddon King's paper "Notes on Ore Occurrences in Highly Metamorphosed Precambrian Rocks" (Stillwell An

    Jan 1, 1959

  • ISEE
    Construction of Free Faces in a Single Event

    By Iván E, Alex Araya Jofre, Jean Guiroux Toro, Eduardo Valdés Guerra

    Currently, it is important for companies to have controlled mining operations and adhere to production schedules. To achieve this, one of the key factors is maintaining high reliability in the P&T pro

    Jan 26, 2026

  • AUSIMM
    Notes on the New Broken Hill Consolidated Ltd. Service Shaft

    This paper briefly describes the shaft, including sinking, steel sets and their installation, shaft equipment and winders.INTRODUCTIONThe New Broken Hill Consolidated Ltd. Service Shaft is a vertical

    Jan 1, 1957

  • SME
    Geologists Add Value at Newmont’s Nevada Mines – Part One

    By Wayne Trudel, Lloyd McEvers, Lori Clarke, Eric Saderholm, Charles Lynn Bolin, Leroy Schutz

    Newmont mine geologists in Nevada are most proficient when applying technical expertise with multi-departmental teams in three main settings. The first is value creation through near-mine discovery, d

    Jan 1, 2004

  • SAIMM
    Robust and resistant semivariogram modelling using a generalized bootstrap

    By E. Pardo-Igúzquiza, R. A. Olea

    The bootstrap is a computer-intensive resampling method for estimating the uncertainty of complex statistical models. We expand on an application of the bootstrap for inferring semivariogram parameter

    Jan 1, 2015

  • SAIMM
    Processing low-grade coal to produce high-grade products

    By G. J. de Korte

    South Africa’s best-quality coal, located in the central Highveld basin, is becoming depleted and alternative sources of coal, such as the Waterberg coalfield, will have to be developed to supply the

    Jan 1, 2015

  • SAIMM
    A Case Study On The Operation Of A Flottweg Tricanter® Centrifuge For Solvent-Extraction Crud Treatment At Bwana Mkubwa, Ndola, Zambia

    By Gift Chisakuta, Bravo Mbao, Nils Schwarz, Angus Feather, Anthony Mukutuma

    Bwana Mkubwa is a 50 000 tons per annum copper cathode producer, owned by First Quantum Minerals and located in Ndola, on the Zambian Copperbelt. The Bwana Mkubwa solvent-extraction circuit was starte

    Jan 1, 2007

  • NIOSH
    IC 9025 Tungsten Availability - Market Economy Countries - A Minerals Availability Program Appraisal

    By T. F. Anstett

    The Bureau of Mines estimated the potential availability of tungsten from 57 mines and deposits in 19 market economy countries. The tungsten resources of China and the U.S.S.R. were also estimated. Th

    Jan 1, 1985

  • SME
    Case Study: Correcting Mechanical And Control Problems On Essroc?s Multi-Drive Station Horizontally Curved Conveyor ? Introduction

    By A. Jennings

    [ ] In November 2005, Essroc Cement, part of the Italcementi Group, commissioned a long overland conveyor at their Nazareth plant in Pennsylvania. This conveyor, tagged CV-105, was designed to tran

    Jan 1, 2012

  • SME
    Mine Power Systems

    By Christopher J. Bise

    INTRODUCTION A mine's power system represents the driving force behind all of the extraction and auxiliary operations, because the production and transportation of mined material and the oper

    Jan 1, 1986

  • NIOSH
    Back Injury Control Measures For Manual Lifting And Seat Design

    By S. Gallagher, A. G. Mayton

    Back injuries account for a high proportion of lost workdays in the mining industry and are a leading cause of disability in mine workers. Two risk factors for low back injuries are manual lifting and

  • CIM
    Minimum variance or maximum profitability?

    By R. Mohan Srivastava

    "The goal of estimation is considered in the light of decision analysis. A simple example reveals the essential elements of decision-making in the face of uncertainty. A second example shows that thes

    Jan 1, 1987

  • NIOSH
    Using Proximate Analysis to Characterize Airborne Dust Generation from Bituminous Coals

    By Steven J. Page, John A. Organiscak

    The amount of airborne respirable dust generated from break- age of different coals varies widely. This research was conducted to identify the facets of airborne respirable dust liberation from the co

  • DFI
    The Reliability Of Conventional Design Methods For Driven Piles In Sand - Synopsis

    By Kenneth Gavin

    The accurate prediction of the shaft capacity of drives piles in sand continues to present problems for foundation designers. Research in this field has been carried out for many years and has yielded

    Jan 1, 1996

  • IIMP
    Permitting in mining projects and their challenges in Perú

    By Miguel Gutiérrez

    This paper will seek to provide an awareness of the challenges the permitting process presents to the engineering design for open pit mining projects in Perú. This awareness will create a better under

    Sep 21, 2013

  • CIM
    Chipewyan Granite - a Building-Stone Prospect in Alberta

    By John D. Godfrey

    Geological mapping on the Canadian Shield in northeastern Alberta outlined severalgranitoid rock massespotentially suitable as building stone. A particularly attractive prospect, the Chipewyan Red Gra

    Jan 1, 1979

  • CIM
    Footwall anchoring at Smoky River Coal Limited

    By Peter L. Sheehan, David A. Fawcett, Dennis C. Martin

    "Smoky River Coal Limited has successfully completed a major program involving the pattern rock anchoring of a high, steeply dipping footwall slope. The slope dips at approximately 65 to 70 degrees to

    Jan 1, 1988

  • SME
    Size Reduction/Mineral Liberation Simulation For A Magnetic Taconite Concentrator (451168a3-7660-4e82-9e41-cf07bc59aaec)

    By R. L. Wiegel

    Several mineral process modeling and simulation packages are currently available for use in evaluating the performance of alternative process flowschemes. A critical link that has been missing from t

    Jan 1, 2002