Search Documents

  • AUSIMM
    Fundamentals of Cyclone Design and Operation

    The cyclone, or centrifugal separator, ,is firmly established in industry as a low cost separator of solids from gases.While it will also separate fluids of different densities, and solids from liquid

    Jan 1, 1949

  • IIMP
    Aplicación del modelo de pronóstico Sarima para optimizar el consumo de cianuro en procesos de lixiviación

    By Jose Luis Sosa, Marco Surichaqui, Ramirez Marcelino

    El proyecto permite obtener resultados de operación que no siempre son los esperados en cuanto a calidad y recuperación, aquí es donde destaca el programa; tiene una data que PRONOSTICA estos resultad

    Sep 1, 2017

  • SAIMM
    An Investigation Into The Physical Constraints Of The Current Sub-Decline At Turffontein Shaft

    By M. C. Bhulose

    Paper written on project work carried out in partial fulfilment of B. Eng (Mining Engineering) degree The purpose of this project was to identify constraints that could occur in the current sub-d

    Jan 1, 2004

  • AUSIMM
    Kainantu Gold-copper System, Papua New Guinea

    By K Prendergast, P Dale, I Taylor, A J. Vigar, B Lueck

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Kainantu Project is located within the New Guinea Thrust Belt in northern Papua New Gui

    Mar 18, 2015

  • AIME
    Part IX - Papers - Metallothermic Reduction of Oxides in Water-Cooled Copper Furnaces

    By Fred H. Perfect

    The thermite process, now approximately 80 years old, has heretofore been practiced in ceramic vessels. This paper outlines the successful production of several million pounds of alloy produced in zua

    Jan 1, 1968

  • SME
    Pilot Plant Demonstration Of The Platsol® Process For The Treatment Of The Northmet Copper-Nickel - PGM Deposit (2b88692d-3bac-4547-86c3-f3ee9071956d)

    PolyMet Mining is developing the NorthMet property near Duluth, Minnesota. Laboratory investigations had led to the development of the PLATSOL process to dissolve in one step the base metals (copper

    Jan 1, 2001

  • CIM
    Advanced Control Decision Tree (46th Annual Canadian Mineral Processors Operators Conference© , Ottawa, Ontario, January 21-23, 2014)

    By Michel Ruel

    "This paper describes how to make advanced control choices when difficult processes need improvement. The decision-making process involves choosing between a rules-based approach and a model-based app

    Jan 1, 2014

  • AUSIMM
    Mining Methods and Costs at the Mount Isa Mines Ltd., Mount Isa, Queensland, Australia

    By Mann V. I

    The Mount Isa property has been in operation since June, 1931; during this period operations have changed from the production and treatment of carbonate ores to the mining, milling, and smelting of su

    Jan 1, 1938

  • ISEE
    Subdrill – The Underutilised Blasting Parameter

    By Stephen Mansfield

    In metalliferous mining operations, subdrill is that portion of the blast hole that is drilled below the target grade elevation, and in most cases loaded with explosives. Its primary aim is to enable

  • AUSIMM
    Permian Sedimentation in the Newcastle Coalfield, N.S.W.

    Factual data about the sedimentation in the Newcastle Coal Measures are presented. Data concerning the total coal measure sequence (isopachs, sand/shale ratio, and total coal thickness variation), dat

    Jan 1, 1970

  • SME
    Looking for Mr. Good Contract

    By Wayne E. Kilker, Michael J. McBride, William P. Levy, Thomas J. Lamb

    Between 1989 and 2004 the Massachusetts Water Resources Authority (MWRA)constructed several major wastewater and water tunnels associated with three major projects in the Boston area of eastern Massac

    Jan 1, 2005

  • AIME
    Technical Papers and Notes - Institute of Metals Division - In Sb-Sn System

    By R. N. Zitter

    PRESENT work was done in connection with a program for obtaining a low energy gap semiconductor suitable for photodetection. The inter-metallic compound InSb, which is now being in-

    Jan 1, 1959

  • DFI
    "Renovation Of The Amsterdam Concert Hall, Replacing 2000 Wooden Piles By 400 Vibration-Free Tubex Piles In Restricted Room."

    By Alexander J. Verstraeten

    Work started on the building of the Amsterdam Concert Hall in 1880 by driving over 2000 wooden piles of 13 m on which foundation-beams out of wood and brickwork were made. During construction the de

    Jan 1, 1987

  • NIOSH
    RI 3184 Sanitary Surveys of the Coal-Minig, Metal-Mining & Smelter Towns of Utah

    By Arthur L. Murray

    "INTRODUCTION In compliance with those provisions of the organic act establishing the Bureau. of Mines which relate to improvement of health conditions of persons engaged in the mining, preparation, o

    Oct 1, 1932

  • AUSIMM
    Mount Morgan Ore Concentration

    By Wilson O. A

    TABLE OF CONTENTS1. Introductiona. Process Changes since 1939.b. Current Practice.2. Ore Characteristicsa. Copper Minerals.b. Gold Occurrence.3. Treatment of High Grade Acid Orea. The Ore Treatment Pl

    Jan 1, 1952

  • AUSIMM
    Some Technical Aspects of Treatment Operations at Mary Kathleen Uranium Ltd.

    By Hemingway P, Boag J

    Major operating aspects of the Mary Kathleen Uranium Ltd. treatment plant are discussed with partkular reference to those which are peculiar to this operation.Problems associated with the production o

    Jan 1, 1961

  • SME
    Boddington Gold Mine Moves Closer To Production

    Construction of the Boddington Mine 130 km (81 miles) southeast of Perth, is about 89 percent complete. When the $2.9-billion development is finished, it will be the largest gold mine in Australia, pr

    Jan 1, 2009

  • SME
    NAT Attendees Get A Glimpse Of The Future Of Underground Space Use

    In 1950, about a third of the world?s population lived in cities. That figure has steadily risen throughout the following decades. Now it is believed that about 60 percent of the estimated 8.1 billi

    Jan 1, 2008

  • CIM
    Observation of Ore Pass System Performance at Brunswick Mine

    Brunswick Mine employs an ore and waste pass system for material transfer. This paper reviews the evolution and performance ore pass systems at the mine. It presents the range of selected configuratio

    Feb 1, 2008

  • AUSIMM
    Communication - The Misima Story

    Misiman society is matrilineal and despite relatively long contact with Europeans and mining, it retains its traditional consensus style of decision making. Many Misimans at least understand Engl

    Jan 1, 1991