Search Documents

  • DFI
    Interaction Between New Drilled Shafts And Existing Timber Piles At Holland Tunnel Approach

    By Aly M. Mohammad

    The 12th and 14th Street Viaducts, which carry Route 139, are located west of the Holland Tunnel in Jersey City, New Jersey. The two viaducts, provide access to and from the Holland Tunnel (which con

    Jan 1, 2009

  • AUSIMM
    Some Notes on Gold Milling Practice in Bendigo

    This paper endeavours to lay as concisely as possible, before the members the salient features of local gold milling practice, and to point out in what respects this practice differs from that of othe

    Jan 1, 1902

  • NIOSH
    IC 8085 Equipment, Accessories, And Procedure For Fighting Mine Fires With High-Expansion Foam ? Introduction

    By R. Ward Stahl

    Fire is still a scourge of the mining industry, although many precautionary measures have been and are being taken to reduce the incidence of fires and to combat them. Generally, the success of fire e

    Jan 1, 1962

  • CIM
    Plant Scale Trial of Isobutyl Xanthate at Raglan Concentrator Using Reference Distributions

    By Norman O. Lotter, Dominic Fragomeni, Lori J. Kormos, Guy Comeau, Antonio Di Feo

    "A performance opportunity was identified for the Raglan concentrator operation by changing the selection of xanthate from Potassium Amyl Xanthate (PAX) to Potassium Isobutyl Xanthate (PIBX). This opp

    Jan 1, 2009

  • NIOSH
    FLAC Simulation Of Split-Pipe Tests On An Instrumented Cable Bolt (a0c51804-b6b1-4b6f-b8ba-d2b4c1ab8f67)

    By Marc Ruest, Lewis Martin

    A new instrumented cable bolt has been developed by the National Institute for Occupational Safety and Health at the Spokane Research Laboratory in Spokane, WA. Although various instruments are avail

  • CIM
    FLAC Simulation of Split-Pipe Tests on an Instrumented Cable Bolt

    By Marc Ruest

    A new instrumented cable bolt has been developed by the National Institute for Occupational Safety and Health at the Spokane Research Laboratory in Spokane, WA. Although various instruments are availa

    May 1, 2002

  • SAIMM
    Mining Method Selection By Multiple Criteria Decision Making Tools

    By M. R. Bitarafan

    Mining method selection is the first and most important problem in mine design. In this selection some of the parameters such as geological and geotechnical properties, economic parameters and geograp

    Jan 1, 2004

  • NIOSH
    Cabs With Powered Height Adjustment (Rail Mounted) - Objective

    Provide optimum visibility of mining operations while maintaining protection and comfort for ma-chine operators. Approach Cabs and canopies with hydraulically powered variable-height control w

    Jan 1, 1978

  • CIM
    Stepped Frequency GPR Field Trials for Determining the Ideal Frequency Bandwidth for Use in Potash Mines

    By W. Greg Maybee

    Separations, which form along stratigraphic boundaries in the roofs of potash mines, pose a serious safety concern. If these separations go undetected they can lead to falls of ground. The current met

    May 1, 2004

  • AUSIMM
    Swelling of High Grade Iron Ore Pellets Reduced by Hydrogen in a Fixed Bed

    A study of the swelling behaviour of a single batch of high-grade iron ore pellets during hydrogen reduction in a fixed bed showed that the extent of swelling is governed by the nucleation and growth

    Jan 1, 1978

  • CIM
    Automatic Sorting of Minerals: Current Status and Future Outlook

    By T. P. R. de Jong, H. Harbeck

    "This contribution reports recent mineral sorting experience and lists the opportunities of the newest generation of automatic sorters with a special focus on electromagnetic detection and Xray transm

    Jan 1, 2005

  • CIM
    El Mochito Mine – Latest Operational Improvements and Future Challenges in the Area of Mineral Processing

    By Renaud Adams, Vladimir Salatic

    "The El Mochito Mine located in Honduras, Central America, has produced lead, zinc and silver in concentrates since the 1950s. The paper discusses changes made in both lead and zinc circuits to reduce

    Jan 1, 2007

  • DFI
    Underwater Cable Anchors - Salvage Of Barge 45, Niagara River ? Background

    By Colin C. West

    On August 7, 1986, Barge 45, while being towed near the mouth of the Niagara River, was swept downstream and pinned against one of the central piers of the Peace Bridge. The barge rested against the p

    Jan 1, 1987

  • CIM
    Design and wear of SAG mill shell liners at Brunswick mine

    By C. Larsen, I. Orford, L. Strah, M. Renaud, P. Radziszewski

    "An AG/SAG mill was commissioned at the Brunswick mine concentrator in October 1998. This paper discusses the original shell top hat liner design for the bi-directional AG/SAG mill, observed liner wea

    Jan 1, 2005

  • ISEE
    Analysis and Design of Blastwalls to Protect Public Structures From Malevolent Explosions

    By Dale Preece, Steven Sobolik, Richard Jensen

    Recent events demonstrate that civil and government facilities and structures face an ever-increasing need to be designed for protection against malevolent explosions. Modification of existing public

    Jan 1, 2000

  • AUSIMM
    Successful Raiseboring in Poor Ground Conditions, Kencana Mine, Indonesia

    Ground conditions at the Kencana mine, Indonesia, are generally poor and an underhand cut and fill mining method is used for extraction. Due to these poor ground conditions, all vertical development h

    Nov 25, 2010

  • AUSIMM
    Stratigraphy of the Thomson Orogen – New Insights from Mount McLaren, North-east Australia

    By C Verdel, M Lee, A Oorloff, K Welsh

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Thomson Orogen is a large but poorly understood element of Queensland geology. Extensiv

    Mar 18, 2015

  • AUSIMM
    Geotechnical Milestones at Mount Lyell Mine

    By D A. Cuello, G B. Sharrock

    The Prince Lyell orebody at Mount Lyell Mine has a rich mining history commencing with the open pit in 1935, which transitioned underground in 1972. Between 1972 and 2014 a total of 64 Mt was mined un

    May 9, 2016

  • NIOSH
    MLA 87-83 - Mines And Prospects In The Seafoam Mining District, Custer County, Idaho ? Summary

    By Nathan T. Lowe

    This report updates an accounting of mines and prospects in the Seafoam mining district, Custer County, Idaho, begun during mineral appraisal of the Idaho Primitive Area. Thirty-two mine and prospect

    Jan 1, 1983

  • CIM
    Fast Track Reactivation -Jacobina Mine

    Mine Evaluation Engineering , Operational and Social evaluation. Focus is on what opportunities are available. Social ??History ??Past Management Practices ??Community / Available labor force Mi

    May 1, 2006