Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Numerical Modeling Of Longwalls In Deep Coal Mines
By Salah Badr
Longwall mine layouts with their entries, chain pillars, face support systems, advancing mining faces and compacting gobs represent a geomechanically complex mining operation. Geomechanical aspects ar
Jan 1, 2003
-
New Approach to Evaluate the Stability of Yield Pillars
By Khaled Morsy
In this paper a new method to evaluate the stability of yield pillars was introduced. The evaluation of yield pillar stability was conducted in three steps: (1) Estimation of pillar loading - numerica
Jan 1, 2003
-
The Directional Drill Monitor For Long Hole Gas Drainage In Coal Mines (d6b87c76-5ad8-4cc5-b4ae-23b79c52c32b)
By G. Skybey
The Directional Drill Monitor (DDM) is an advanced instrument for real time in hole surveying. It was developed by Du Pont (Australia) to suit Australian gassy coal mining conditions. The instrumen
Jan 1, 1992
-
Shear Bond Characteristics in Grouted Cable Bolts
By Jian Yong Chen
The results of a laboratory investigation of pullout tests conducted on grouted, plain cable bolts are reported. The main purpose of the study is to determine experimentally the shear bond stiffiess o
Jan 1, 2005
-
Overcoring Techniques to Assess in Situ Corrosion of Galvanised Friction Bolts
The effects of corrosion upon the load bearing capacity and ultimate tensile strength of galvanised friction bolts were determined. Corrosion rates were measured by overcoring of the reinforcement ele
Jan 1, 2005
-
Resin-Grouted Cables For Longwall Tailgate Support Stability
By Stephen C. Tadolini
The U.S. Bureau of Mines (USBM) is conducting research to provide alternatives for traditional secondary support methods. These cost-saving methods are proving to afford safer installation, improve en
Jan 1, 1994
-
Automation Of A Progressive Failure Procedure For Analysis Of Underground Mine Pillar Designs
By N. P. Kripakov
The U.S. Bureau of Mines (USBM) is conducting research to develop a practical computer-based tool that will allow coal mine planners to anticipate rock mass behavior surrounding mine entries prior to
Jan 1, 1994
-
Analysis And Field Testing Of Presupport Application In Coal Strata
By J. D. Dizon
Conventional strata control methods (i.e. roof bolts. cable trusses) are not always effective for ground control of very weak coal strata. An alternative method, termed presupport. is being investigat
Jan 1, 1990
-
Site Characterization For Planning Underground Stone Mines
By Francis S. Kendorski
Underground stone mines tier construction aggregates and industrial minerals are being planned in increasing numbers throughout the United States. At the middle of the last century (1950s) underground
Jan 1, 2000
-
The Failure Mechanism and Control Technology of Coal Wall of a Large Mining Height Panel
By Dezhong Kong, Jaichen Wang, Shengli Yang
"The stability control of longwall coal face is the key technology of large-cutting-height mining method. Therefore, a systematic study of the factors that affect coal face stability and its control t
Jan 1, 2015
-
Application of Regional Subspace Detection to Identify Mining Related Seismicity
By Keith D. Koper, Kris L. Pankow, Derrick J. A. Chambers, Michael K. McCarter
"In a mining environment, high quality seismic event catalogs are often useful in interpreting local stress states and identifying areas with elevated ground control risk. Installation, operation, and
Jan 1, 2015
-
Ice Pillars, Packwalls, and Brattices
By David L. Kuck
This paper describes a system for providing structural, support in underground mines, employing water ice for pillars. packwalls and brattices. It consists of a refrigeration brine chiller, brine circ
Jan 1, 1987
-
3D FEM Simulation For Fully Grouted Bolts
By Khaled Morsy
Most of the available numerical codes simulating the reinforcing effect of fully grouted bolt are accomplished by a series of bar elements which are connected along their length to the host rock by sh
Jan 1, 2004
-
Load Transfer Mechanics In Fully-Grouted Roof Bolts
By Maynard O. Serbousek
The mechanics of load transfer of fully-grouted roof bolts in coal mines has been investigated in laboratory and analytical studies. The purpose of this research is to increase the understanding and b
Jan 1, 1984
-
Prediction Of Longwall Support Loading At Southern Colliery, Queensland (a27f315c-1e91-4c85-b61a-2de1eb8e0d0f)
Roof conditions at Southern Colliery, the second Iongwall mine to be established at German Creek, were found to be much stronger and more massive than at the earlier longwall mine on the lease. Invest
Jan 1, 1992
-
Geotechnical Aspects of Subsidence over Room and Pillar Mines in Illinois
By Gennaro G. Marino
Site conditions at several shallow room and pillar mines in Illinois are described and compared with the charac¬teristics of the subsidence profiles at the ground surface. The shape and magnitude of t
Jan 1, 1984
-
Integrating Ground Control And Mine Site Data Through A Geographic Information System
By Douglas C. Peters
Part of the ground control research at the U.S. Bureau of Mines is involved with improving ground control data collection and analysis methods. A geographic information system (GIs) is being used with
Jan 1, 1990
-
The Initial Performance of Commonly Used Primary Support on U.S. Coal Mines
By Murali Gadde
U.S. coal mines? primary roof supports typically consist of passive resin bolts; however, the use of active bolt systems is increasing. Despite this widespread use, a comparative performance evaluatio
Jan 1, 2011
-
A New Method For Longwall Pillar Design
By P. Tsang
In order to deal with ground control problems such as roof falls, floor heaves and pillar failures in underground coal mines, a new pillar design method based on the "yield pillar" concept is proposed
Jan 1, 1993
-
Design Considerations For Bump-Prone Longwall Mines
Tailgate pillar and tailgate-face corner humps have been a major threat to longwall coal mines where hump-prone conditions exist. The yield pillar design concept, in which the longwall chain pillars a
Jan 1, 1999