Efficient Extraction Of Fine Heavy Minerals From Alluvial And Ground OresBy Oleg N. Tikhonov
A new extraction method which includes a combination of gravity and alternating electromagnetic fields with interfriction of mineral particles was proposed (Tikhonov O.N., 1979) and tested in lab cond
Jan 1, 1995
-
Iron Removal From Bauxite Ores Using Biologically Produced Organic AcidsIron removal using biologically produced organic acids was investigated as a treatment option for the production of refractory grade bauxite. A leaching solution containing 98mM oxalic and 67mM citric
Jan 1, 2006
-
Trends In Hard Rock Mined Land Reclamation And Financial Assurance RequirementsBy Dalva L. Moellenberg
Introduction Hard rock mine closure (often referred to as decommissioning), mined land reclamation and financial assurance requirements are receiving considerable attention by governments and organ
Jan 1, 2005
-
LoadCapacity and Stiffness Characteristics of Pumpable Standing Support System Used in Underground Coal MinesBy Timothy J. Matthews, Ted Klemetti, Timothy J. Batchler, Daniel J. McElhinney
Unplanned tailgate collapses and difficult mining conditions in U.S. longwalls have necessitated the use of innovative tailgate support systems. Severe ground movement induced by longwall loading has
Jul 1, 2023
-
Improvements In Contracting Practices And ManagementBy William L. Barnes, Maurice Leiser
INTRODUCTION The literature on project management considerations and techniques for large rail rapid transit projects in mid-1979 was fairly large and getting larger. UMTA was establishing special
Jan 1, 1981
-
Microbially-Mediated Reductive Dissolution of Arsenic-Bearing Minerals in a Gold Mine Tailings ImpoundmentBy W. Douglas Gould, Mei-Lin K. Stichbury, Jeffrey G. Bain, Blowes David W.
The mechanisms of release of arsenic in gold mine tailings were investigated. The highest concentration of dissolved As (75 mg/L) was observed near the base of the tailings impoundment, in close assoc
Jan 1, 2000
-
Impact Of State And Federal Water Pollution Control Laws On The Mining Industry In MissouriBy James P. Odendahl
Missouri is a state rich in mineral commodities. There is a variety of types of mining as well as minerals in the state. Different phases of mining are controlled by a variety of state and federal law
Jan 1, 1977
-
Construction Management And Team Effort Soft Ground Tunnel Project, Alexandria, EgyptBy Chaitanya "Teny" Mittal
INTRODUCTION A team effort by the Owner, Engineer, and Contractor can help avoid serious problems on a construction project. It can save cost and time for both Owner and Contractor, as illustrated
Jan 1, 1989
-
Effects Of Shield Tunneling Over SubwaysBy Eugene F. Casey, William H. Hansmire, J. Ghaboussi, Randall L. Lentell, Harvey W. Parker
INTRODUCTION Construction of a major intercepting sewer in Brooklyn, New York involved tunneling in soil over several subway lines. In two instances the clearance between the subway and sewer was s
Jan 1, 1981
-
Recruiting Future Mining EngineersBy P. Conrad, S. Rosenthal
"Engineers remain in demand. Job opportunities in the United States still exceed the number of students graduating from college with degrees in Mining Engineering. Although enrollment is up for freshm
Jan 1, 2015
-
Packed Column Flotation For Fluorspar Beneficiation (89f2db59-87e7-4c85-bb1e-fa1bdb0cd0b4)By J. Ye
A comprehensive flotation study has been carried out on a Chinese fluorspar ore using the packed flotation column developed at Michigan Technological University. The results are compared with that of
Jan 1, 1992
-
A Radar-Based Highwall Rib Thickness Monitoring SystemBy G. L. Mowrey
In addition to developing various types of coal interface detection systems, the U.S. Bureau of Mines is actively involved in developing a coal rib thickness monitoring system for high wall mining app
Jan 1, 1995
-
Wastes Associated With A Fractured Hard Rock MineBy R. E. Williams
University of Idaho scientists research under U.S. Bureau of Mines Cooperative Agreement C0278001 constitutes a complex hydrogeological, hydrochemical and metallurgical mine waste management project a
Jan 1, 1990
-
Determining Corrosion Rates In Industrial Ore Grinding EnvironmentsBy A. E. Isaacson
Researchers at the Bureau of Mines, U.S. Department of the Interior, developed and tested equipment to measure corrosion rates on a commercial-scale mill. Bench-scale experiments were also designed fo
Jan 1, 1989
-
Controlled Recirculation Of Section Air In A Trona MineBy Andrew B. Cecala, Robert J. Timko, Christopher J. Pritchard
As mine venti1ation systems become more complex, it is increasingly difficult to supply fresh air to the working face. A high percentage of the fresh air entering a mine never reaches the working face
Jan 1, 1989
-
Climax Completing $40 Million Modernization of Henderson Mine and MillBy William G. Doepken
After 15 years of production, 91 Mt (100 million st) of ore mined and nearly 227 kt (500 million lb) of molybdenum produced, Climax Molybdenum Co.'s Henderson Mine and Mill are being modernized a
Jan 1, 1991
-
The History and Future of Gold Mining in MexicoBy Ben Ainsworth
I am going to discuss gold mining in Mexico during the last twenty centuries and try to suggest some of the futures that may develop in this industry in the next decade. Before I start this rapid revi
Jan 1, 1992
-
Only the best of the best will be part of the WTC technical program"From April 22 to 28, the eyes of the tunneling and underground construction world will be on San Francisco, CA, as the world’s most influential underground construction industry leaders gather at the
Apr 1, 2016
-
Influence Of The Classification Circuit On Energy Consumption In ComminutionBy D. A. Dahlstrom
Crushing and grinding consumes about 1.3% of the nations produced electrical energy.( Furthermore, only one in the first ten highest consumers comes from an industry other than mineral processing. Thi
Jan 1, 1988
-
Beavertail Tunnels Interstate I 70By Russell E. Martin
Excavating and lining twin interstate highway tunnels each 11.3 m (37 ft) high by 14.6 m (48 ft) wide by 183 m (600 ft) long. A discussion of the geology of the site and problems occurring at the port
Jan 1, 1987