Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Interpretive Geotechnical Investigation For Onion Creek Wastewater Interceptor Tunnels - Austin, TexasBy Robert M. Valentine, Randall L. Lentell
Interpretive geotechnical investigations were performed for the construction of approximately 15,250 m (50,000 ft) of wastewater interceptor tunnels in Austin, Texas. Subsurface materials consist of c
Jan 1, 1985
-
Nuclear Power ? SME StatementNuclear power currently produces about 20% of the electricity in the US, with 104 nuclear power plants located in 31 states. The commercial US nuclear industry contributes over $4 billion annually to
Jan 1, 2011
-
Tunneling Through Cobbles in Sacramento, CaliforniaBy Joel Nonnweiler, Rafael Castro, Ross Webb
The three thousand foot long 66-inch diameter Folsom East Interceptor Section2B was completed accident free, on time and under budget with no measurable surface settlement. The tunnel passed through n
Jan 1, 2001
-
A Case History Of Aggregate Resource Development On Allotted Indian LandsBy D. R. Hack
Increased consumption of concrete in the Pacific Northwest has pushed aggregate resource development pressure from urban areas west of the Cascade Range to rural areas east of the Cascades. Some recen
Jan 1, 2002
-
Structural Geologic Mapping to Identify Controls on Ground Instability in Surface and Underground Limestone MinesBy S. E. Phillipson
During the course of evaluations by the Mine Safety and Health Administration’s Roof Control Division, the controls on ground instability were investigated at surface and underground limestone mines t
Jan 1, 2006
-
Production Scheduling At LKAB’s Kiruna Mine Using Mixed Integer ProgrammingBy M. Kuchta, A. Newman
LKAB’s Kiruna Mine, located in northern Sweden, produces about 24 Mton of iron ore yearly using sublevel caving. For efficiency, the mine must deliver planned quantities of three ore products. We use
Jan 1, 2002
-
Construction of the Sacramento River Tunnels on the Lower Northwest Interceptor Sewer, Sacramento, CaliforniaBy Dan Martz, Bill Moler, David Young, Wally Chen, Matthew Crow, Steve Norris, Tolga Togan
Two 610 m (2000 ft) long tunnels were driven through water bearing silts, sands and clays beneath the Sacramento River using a 4.59 m (15.1 ft) diameter Earth Pressure Balance Tunnel Boring Machine (E
Jan 1, 2007
-
‘Here’s to Low-Grade Ore and Plenty of it,’ the Hearsts and the Homestake MineBy Duane A. Smith
They are gone now. Gone like that long ago generation that gave them birth. The Homestake Mine, nestled in the northern Black Hills, closed in 2001 after 125 years, the longest run of any major Amer
Jan 1, 2003
-
Recent Developments In Dense Medium Cyclone Circuit Design – PreprintBy L. Watters, R. Terry, D. Placha
Dense medium cyclones are the preferred means for cleaning 1/2 in. x 14Mesh to 28Mesh (12.7 mm x 1.0 mm to 0.6 mm) raw coal and are becoming a common choice for cleaning raw coal from a nominal top si
Feb 24, 1997
-
Underground Mine Air and Strata Temperature Change Due to the Use of Refuge AlternativesBy M. A. Reyes, L. Yan
Heat and humidity buildup within refuge alternatives (RAs) may expose occupants to physiological hazards such as heat stress. The Mine Safety and Health Administration (MSHA) regulations require RAs i
Nov 22, 2019
-
Problems Encountered on the Upper Reach of the Northeast Interceptor Sewer ProjectBy Rajni Patel, John McDonald, Steve Dubnewych, Michael McKenna
The Upper Reach segment of the Northeast Interceptor Sewer (NEIS) is a3.2-km-long tunnel excavated in interbedded marine sedimentary deposits with approximately 40 m of cover. The tunnel was initially
Jan 1, 2005
-
Rehabilitation of New Croton Aqueduct ShaftsBy W. James Marold
The New Croton Aqueduct (NCA) was the first major water supply tunnel for New York City. The 50-km (31-mi) long tunnel has 33 open shafts 6 m (20 ft) to 121 m (397 ft) deep. The tunnel and shafts are
Jan 1, 2008
-
Correct Identification Of Chrysotile Asbestos In OresBy Allison
During the 1980’s, laboratories opened throughout the United States to serve the analysis needs of a rapidly growing asbestos abatement industry. The samples analyzed were either collected during the
Jan 1, 2005
-
Application Of Impact Resistant Steel Sets For Underground Roof Fall RehabilitationBy J. C. Stankus
To protect mine personnel and moving equipment at underground roof fall areas, mine operators typically install steel sets, which are covered with wooden blocks and backfilled with an expanding type c
Jan 1, 2011
-
Cable Shovel Dynamic Modeling For Determining Component Cycle Stress - Preprint 09-121This paper presents a virtual prototype for the stress analysis of cable shovel components based on combination of flexible and rigid body approach. The general mechanical system of the cable shovel i
Jan 1, 2009
-
Final Tunnel Liner at Mill Creek 3 Project - Case StudyBy M. Schafer
The 20 foot diameter cast-in-place tunnel lining for Phase 3 of the Mill Creek Tunnel (MCT-3) has been completed. This paper will summarize aspects of liner design and address the construction approac
Jan 1, 2008
-
Probabilistic Approach To Project-Specific Political Risk Analysis For Mineral ProjectsBy S. Dessureault, Z. Gavelan
As globalization continues, sustainability and social responsibility has become essential in foreign mining investment. However this global trend and the increasing acceptability toward the globalizat
Jan 1, 2004
-
Flotability Of Metallic Iron Fines From Comminution Circuits And Their Effect On Flotation Of A Sulfide OreBy H. K. Lin
The effect of metallic iron fines on froth flotation of a sulfide ore was examined by comparing the flotation results with and without iron fines present in the flotation feed. Mild steel and ceramic
Jan 1, 2008
-
Grinding Mill Scale-up ProblemsBy N. Arbiter, C. C. Harris
The economic advantages of large diameter ball mills can be compromised by unexpected capacity limiting conditions. These arise because media rotational flow to ore axial flow ratios, and the number o
Jan 1, 1982
-
Stress, Geologic, And Support Design System (SGSSM) For Underground Mine SlopesBy J. C. Stankus
Accurate evaluation of stress and geological conditions is critical to ground control design in underground openings. For a slope entry, the problem is more difficult because a slope will transverse
Jan 1, 2011