Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Interpretive Geotechnical Investigation For Onion Creek Wastewater Interceptor Tunnels - Austin, Texas

    By Robert M. Valentine, Randall L. Lentell

    Interpretive geotechnical investigations were performed for the construction of approximately 15,250 m (50,000 ft) of wastewater interceptor tunnels in Austin, Texas. Subsurface materials consist of c

    Jan 1, 1985

  • SME
    Nuclear Power ? SME Statement

    Nuclear power currently produces about 20% of the electricity in the US, with 104 nuclear power plants located in 31 states. The commercial US nuclear industry contributes over $4 billion annually to

    Jan 1, 2011

  • SME
    Tunneling Through Cobbles in Sacramento, California

    By Joel Nonnweiler, Rafael Castro, Ross Webb

    The three thousand foot long 66-inch diameter Folsom East Interceptor Section2B was completed accident free, on time and under budget with no measurable surface settlement. The tunnel passed through n

    Jan 1, 2001

  • SME
    A Case History Of Aggregate Resource Development On Allotted Indian Lands

    By D. R. Hack

    Increased consumption of concrete in the Pacific Northwest has pushed aggregate resource development pressure from urban areas west of the Cascade Range to rural areas east of the Cascades. Some recen

    Jan 1, 2002

  • SME
    Structural Geologic Mapping to Identify Controls on Ground Instability in Surface and Underground Limestone Mines

    By S. E. Phillipson

    During the course of evaluations by the Mine Safety and Health Administration’s Roof Control Division, the controls on ground instability were investigated at surface and underground limestone mines t

    Jan 1, 2006

  • SME
    Production Scheduling At LKAB’s Kiruna Mine Using Mixed Integer Programming

    By M. Kuchta, A. Newman

    LKAB’s Kiruna Mine, located in northern Sweden, produces about 24 Mton of iron ore yearly using sublevel caving. For efficiency, the mine must deliver planned quantities of three ore products. We use

    Jan 1, 2002

  • SME
    Construction of the Sacramento River Tunnels on the Lower Northwest Interceptor Sewer, Sacramento, California

    By Dan Martz, Bill Moler, David Young, Wally Chen, Matthew Crow, Steve Norris, Tolga Togan

    Two 610 m (2000 ft) long tunnels were driven through water bearing silts, sands and clays beneath the Sacramento River using a 4.59 m (15.1 ft) diameter Earth Pressure Balance Tunnel Boring Machine (E

    Jan 1, 2007

  • SME
    ‘Here’s to Low-Grade Ore and Plenty of it,’ the Hearsts and the Homestake Mine

    By Duane A. Smith

    They are gone now. Gone like that long ago generation that gave them birth. The Homestake Mine, nestled in the northern Black Hills, closed in 2001 after 125 years, the longest run of any major Amer

    Jan 1, 2003

  • SME
    Recent Developments In Dense Medium Cyclone Circuit Design – Preprint

    By L. Watters, R. Terry, D. Placha

    Dense medium cyclones are the preferred means for cleaning 1/2 in. x 14Mesh to 28Mesh (12.7 mm x 1.0 mm to 0.6 mm) raw coal and are becoming a common choice for cleaning raw coal from a nominal top si

    Feb 24, 1997

  • SME
    Underground Mine Air and Strata Temperature Change Due to the Use of Refuge Alternatives

    By M. A. Reyes, L. Yan

    Heat and humidity buildup within refuge alternatives (RAs) may expose occupants to physiological hazards such as heat stress. The Mine Safety and Health Administration (MSHA) regulations require RAs i

    Nov 22, 2019

  • SME
    Problems Encountered on the Upper Reach of the Northeast Interceptor Sewer Project

    By Rajni Patel, John McDonald, Steve Dubnewych, Michael McKenna

    The Upper Reach segment of the Northeast Interceptor Sewer (NEIS) is a3.2-km-long tunnel excavated in interbedded marine sedimentary deposits with approximately 40 m of cover. The tunnel was initially

    Jan 1, 2005

  • SME
    Rehabilitation of New Croton Aqueduct Shafts

    By W. James Marold

    The New Croton Aqueduct (NCA) was the first major water supply tunnel for New York City. The 50-km (31-mi) long tunnel has 33 open shafts 6 m (20 ft) to 121 m (397 ft) deep. The tunnel and shafts are

    Jan 1, 2008

  • SME
    Correct Identification Of Chrysotile Asbestos In Ores

    By Allison

    During the 1980’s, laboratories opened throughout the United States to serve the analysis needs of a rapidly growing asbestos abatement industry. The samples analyzed were either collected during the

    Jan 1, 2005

  • SME
    Application Of Impact Resistant Steel Sets For Underground Roof Fall Rehabilitation

    By J. C. Stankus

    To protect mine personnel and moving equipment at underground roof fall areas, mine operators typically install steel sets, which are covered with wooden blocks and backfilled with an expanding type c

    Jan 1, 2011

  • SME
    Cable Shovel Dynamic Modeling For Determining Component Cycle Stress - Preprint 09-121

    This paper presents a virtual prototype for the stress analysis of cable shovel components based on combination of flexible and rigid body approach. The general mechanical system of the cable shovel i

    Jan 1, 2009

  • SME
    Final Tunnel Liner at Mill Creek 3 Project - Case Study

    By M. Schafer

    The 20 foot diameter cast-in-place tunnel lining for Phase 3 of the Mill Creek Tunnel (MCT-3) has been completed. This paper will summarize aspects of liner design and address the construction approac

    Jan 1, 2008

  • SME
    Probabilistic Approach To Project-Specific Political Risk Analysis For Mineral Projects

    By S. Dessureault, Z. Gavelan

    As globalization continues, sustainability and social responsibility has become essential in foreign mining investment. However this global trend and the increasing acceptability toward the globalizat

    Jan 1, 2004

  • SME
    Flotability Of Metallic Iron Fines From Comminution Circuits And Their Effect On Flotation Of A Sulfide Ore

    By H. K. Lin

    The effect of metallic iron fines on froth flotation of a sulfide ore was examined by comparing the flotation results with and without iron fines present in the flotation feed. Mild steel and ceramic

    Jan 1, 2008

  • SME
    Grinding Mill Scale-up Problems

    By N. Arbiter, C. C. Harris

    The economic advantages of large diameter ball mills can be compromised by unexpected capacity limiting conditions. These arise because media rotational flow to ore axial flow ratios, and the number o

    Jan 1, 1982

  • SME
    Stress, Geologic, And Support Design System (SGSSM) For Underground Mine Slopes

    By J. C. Stankus

    Accurate evaluation of stress and geological conditions is critical to ground control design in underground openings. For a slope entry, the problem is more difficult because a slope will transverse

    Jan 1, 2011