Application Of Impact Resistant Steel Sets For Underground Roof Fall RehabilitationBy J. C. Stankus
To protect mine personnel and moving equipment at underground roof fall areas, mine operators typically install steel sets, which are covered with wooden blocks and backfilled with an expanding type c
Jan 1, 2011
-
Construction of the Sacramento River Tunnels on the Lower Northwest Interceptor Sewer, Sacramento, CaliforniaBy Dan Martz, Bill Moler, David Young, Wally Chen, Matthew Crow, Steve Norris, Tolga Togan
Two 610 m (2000 ft) long tunnels were driven through water bearing silts, sands and clays beneath the Sacramento River using a 4.59 m (15.1 ft) diameter Earth Pressure Balance Tunnel Boring Machine (E
Jan 1, 2007
-
Production Scheduling At LKAB’s Kiruna Mine Using Mixed Integer ProgrammingBy M. Kuchta, A. Newman
LKAB’s Kiruna Mine, located in northern Sweden, produces about 24 Mton of iron ore yearly using sublevel caving. For efficiency, the mine must deliver planned quantities of three ore products. We use
Jan 1, 2002
-
Problems Encountered on the Upper Reach of the Northeast Interceptor Sewer ProjectBy Rajni Patel, John McDonald, Steve Dubnewych, Michael McKenna
The Upper Reach segment of the Northeast Interceptor Sewer (NEIS) is a3.2-km-long tunnel excavated in interbedded marine sedimentary deposits with approximately 40 m of cover. The tunnel was initially
Jan 1, 2005
-
Final Tunnel Liner at Mill Creek 3 Project - Case StudyBy M. Schafer
The 20 foot diameter cast-in-place tunnel lining for Phase 3 of the Mill Creek Tunnel (MCT-3) has been completed. This paper will summarize aspects of liner design and address the construction approac
Jan 1, 2008
-
A Public-Private Partnership Success Story: Treating Abandoned Mine Drainage At Jennings Environmental Education CenterBy R. Hedin, M. Dunn
The Pennsylvania Department of Environmental Protection (US EPA 319 program) provided funding to aid a public-private effort in the installation of an environmentally-friendly system to treat abandone
Jan 1, 2002
-
‘Here’s to Low-Grade Ore and Plenty of it,’ the Hearsts and the Homestake MineBy Duane A. Smith
They are gone now. Gone like that long ago generation that gave them birth. The Homestake Mine, nestled in the northern Black Hills, closed in 2001 after 125 years, the longest run of any major Amer
Jan 1, 2003
-
Flotability Of Metallic Iron Fines From Comminution Circuits And Their Effect On Flotation Of A Sulfide OreBy H. K. Lin
The effect of metallic iron fines on froth flotation of a sulfide ore was examined by comparing the flotation results with and without iron fines present in the flotation feed. Mild steel and ceramic
Jan 1, 2008
-
Rehabilitation of New Croton Aqueduct ShaftsBy W. James Marold
The New Croton Aqueduct (NCA) was the first major water supply tunnel for New York City. The 50-km (31-mi) long tunnel has 33 open shafts 6 m (20 ft) to 121 m (397 ft) deep. The tunnel and shafts are
Jan 1, 2008
-
Design And Construction Of The Lenihan DAM Outlet Tunnel And ShaftBy Hemang Desai
A damaged outlet pipe beneath Lenihan Dam has restricted reservoir discharges, severely constraining the owner?s groundwater recharge program. The solution, a new outlet pipeline through the dam?s rig
-
Correct Identification Of Chrysotile Asbestos In OresBy Allison
During the 1980’s, laboratories opened throughout the United States to serve the analysis needs of a rapidly growing asbestos abatement industry. The samples analyzed were either collected during the
Jan 1, 2005
-
High Performance Tunnel Boring Machine for Queens Water Tunnel, No. 3:A Design and Case HistoryBy Joseph J. Diehl, Brian B. Khalighi
This paper discusses the Queens Water Tunnel, No. 3, Stage 2, being driven by a new Robbins High Performance (HP) Tunnel Boring Machine (TBM).The paper is divided into four sections. In the INTRODUCTI
Jan 1, 1997
-
Probable Cost Estimating and Risk ManagementBy John Reilly
Costs of complex/underground projects have been consistently underestimated and delivery on time and on budget has been problematic. This has been attributed, to inadequate cost estimates and unidenti
Jan 1, 2008
-
Cable Shovel Dynamic Modeling For Determining Component Cycle Stress - Preprint 09-121This paper presents a virtual prototype for the stress analysis of cable shovel components based on combination of flexible and rigid body approach. The general mechanical system of the cable shovel i
Jan 1, 2009
-
Uranium Mining In Arizona Breccia Pipes –High Grade And SafeBy K. Wenrich
The uranium industry has made a dramatic turnaround in the past three years that even the most optimistic economist was not willing to predict during the uranium downswing of the 1990s. Uranium reach
Jan 1, 2007
-
Underground Mine Air and Strata Temperature Change Due to the Use of Refuge AlternativesBy M. A. Reyes, L. Yan
Heat and humidity buildup within refuge alternatives (RAs) may expose occupants to physiological hazards such as heat stress. The Mine Safety and Health Administration (MSHA) regulations require RAs i
Nov 22, 2019
-
Progress Report On The Old Bevier Passive Treatment Wetland, Macon County, MissouriBy Kwang ‘Min’ Kim, Paul T. Behum
The Old Bevier Aerobic Wetland in Macon County, Missouri, was constructed between 1990 and 1991 by the Missouri Department of Natural Resources’ Land Reclamation Program for the purpose of treating ac
Jan 1, 2005
-
Geophysical Measurements Related To TunnelingBy Sigmund D. Schwarz
INTRODUCTION In late 1970, an experimental geophysical program was undertaken at the Lake Huron Tunnel for the purpose of developing a geophysical technique that could be applied to determining the
Jan 1, 1997
-
Probabilistic Approach To Project-Specific Political Risk Analysis For Mineral ProjectsBy S. Dessureault, Z. Gavelan
As globalization continues, sustainability and social responsibility has become essential in foreign mining investment. However this global trend and the increasing acceptability toward the globalizat
Jan 1, 2004
-
Grinding Mill Scale-up ProblemsBy N. Arbiter, C. C. Harris
The economic advantages of large diameter ball mills can be compromised by unexpected capacity limiting conditions. These arise because media rotational flow to ore axial flow ratios, and the number o
Jan 1, 1982