Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Journal: 100 Years / Petroleum By Sir Beverton Redwood London: Charles Griffin & Company, Limited 1906 Copyright

    By Robert Hopler

    Torpedoing Wells. – On the completion of the drilling, or when the production is found to decrease, it is usual to “torpedo” the well to increase the flow. This process was patented in 1862 by Colonel

    Jan 1, 2007

  • ISEE
    Why the 8MS Rule Doesn’t Work

    By D. Bartley, R. McClure, W. Reisz

    Ever since the 8ms criterion was developed in the early 60’s there has been an ongoing debate among many blasters as to its actual value in controlling ground vibration. The perpetuation of the myth s

    Jan 1, 2006

  • ISEE
    Safety Talk - Training If It's Worth The Time, It's Worht Documenting

    By Ann Barron, Paul Downing

    Those employed in the explosives industry must have a keen familiarity of the explosives products they handle, the safety pro c e d u res they must follow, and the increasing number of laws and regula

    Jan 1, 2004

  • ISEE
    A New Approach to the Shock Energy/Gas Energy Concept

    By Thierry Bernard

    Today, experimental measurement of the shock energy/gas energy pair, or pool test, has now become virtually standard. But pool" energy per m(exp 3) of bedrock has no significance for explosives used i

    Jan 1, 1994

  • ISEE
    Borehole Pressures in an Air Decked Situation

    By W. Fourney

    In the late 70’s and early 80’s in conjunction with other oil and gas well stimulation studies, personnel from the Dynamic Effects Lab performed model testing to demonstrate the effectiveness of utili

    Jan 1, 2006

  • ISEE
    Journal: You Be the Judge - A Study on Ethics

    The following situation was submitted as an ethics case study for inclusion in the Journal. To the best of our knowledge, they are based on actual circumstances encountered in the field. Blowing the W

    Jan 1, 2007

  • ISEE
    Blast Optimization from Drone Imagery

    By Markus Pötsch, Andreas Gaich

    Optimization of surface blasting based on 3D models from drone imagery and a closed loop that starts with an automatic analysis of the geometry and the geological conditions and ends with an objective

    Feb 1, 2020

  • ISEE
    Importance of Straight Hole Drilling

    By Stephen Hamilton

    This case history details the issues surrounding the rock drilling industry’s growing demand for straight holes, the importance of straight holes and the introduction of a new production drilling syst

    Jan 1, 1999

  • ISEE
    Signature Hole Blast Vibration Control – Twenty Years Hence and Beyond

    By Douglas Anderson

    In the early 1980s, a method for controlling blast vibrations other than by modifying the Scaled Distance came into use. Research studies had indicated that blast vibration could be simulated by deton

    Jan 1, 2008

  • ISEE
    Journal: Safety Talk, Managing the Blast Site (The Known Unknowns)

    By William Reisz

    Managing the blast site at almost any operation can be a daunting task. There are so many details that must be observed, understood, and acted upon. It goes without saying that there are no two locati

    Jan 1, 2014

  • ISEE
    2000 Blasting in the New Millennium - Timely Claims Reporting Can Make A Big Difference

    By Steve Dillingham

    A blast site incident has just occurred. Tensions are high, and, as the blaster, you’re in charge of the crisis at hand. Your mind is reeling, your thoughts frantic. The main areas of concern for you

    Jan 1, 2002

  • ISEE
    Flyrock Elimination Program Part 1: Corporate Initiative

    By Scott Scovira

    All flyrock incidents have the potential to result in injuries or fatalities that can result in loss of company reputation, license to operate with clients, and bear the exposure to high cost liabilit

    Jan 1, 2012

  • ISEE
    Enhancing Mining Productivity during Thunderstorms with Wireless Initiation Systems

    By Orica Peru, Pedro Lozada

    Maintaining a continuous mining process during thunderstorms is one of the primary challenges in Peru's open-pit mines. Safety protocols necessitate the establishment of exclusion zones to minimize th

    Jan 21, 2025

  • ISEE
    Regulating the Velocity of Detonation of ANFO Utilizing Blends of Non-Explosive Materials

    By Michael E. Curtis

    This paper outlines a study performed to analyze the advantages of utilizing a blasting agent with a velocity of detonation that is 1.3 to 1.4 times the P-wave velocity of sedimentary shales and sands

    Jan 1, 1997

  • ISEE
    A High=Preformance Vibration Monitoring and Data Distribution System for Large-Scale Urban Development Projects

    By Robert Lee, Pertti Paavola

    Automated vibration monitoring and web-based data distribution has proven itself on the largest single construction project ever undertaken in Finland. The excavation for the Kamppi Center Project in

    Jan 1, 2004

  • ISEE
    Benchmarking Drill and Blast Compliance to Design, A Case Study

    By Alan Tordoir, Mark Roberts

    The drill and blast process is a critical function within the production cycle which significantly impacts the ability of an operation to effectively meet its safety and production targets. Acknowledg

    Jan 1, 2019

  • ISEE
    Analysis of Recent Mine Blasting Accidents

    By Larry R. Fletcher

    The Bureau of Mines obtained blasting accident data from the Mine Safety ant Health Administration (MSHA), U. S. Department of Labor. These data were analyzed to determine the most frequent causes of

    Jan 1, 1983

  • ISEE
    Precision-Scale High-Explosive Water Shock Experiments

    By Charles E. Joachim, Christo V. Lunderman, Charles R. Wdch

    The U.S. Army Engineer Waterways Experiment Station (WES) recently conducted a series of precision-scale water shock experiments which consisted of the detonation of several 8-gram, 10-gram, and 12-gr

    Jan 1, 1998

  • ISEE
    Instrumenting Delay-Blast Malfunctions in Underground Coal

    By Michael S. Wieland

    This report discusses the U.S. Bureau of Mines research regarding the desensitization and malfunction of cap-sensitive explosives deployed in underground coal mines. Delay blasting in underground coal

    Jan 1, 1993

  • ISEE
    Shaft Holing Project at Bulyanhulu Gold Mine, Tanzania

    By W. De Graaf, C. Mkumbo

    Bulyanhulu Gold Mine Limited (BGML) commissioned a project of sinking a Bulk Air Cooling Shaft during its programme to improve the ventilation system on the mine. As part of this project, a ventilatio

    Jan 1, 2011