Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Blasting Next to an Unsupported Road using Electronic Detonators

    By Tony Rorke, Sydney Thabethe

    A large overburden blast was carried out at Douglas Colliery, Middelburg Mine Services, close to a national road in South Africa. The road is a busy route between Witbank and Bethal and damage to the

    Jan 1, 2004

  • ISEE
    Blasting Near a Crusher

    By Scott G. Giltner, Alex Schwenk

    Blasting within 250 ft of a crusher was successfully executed through the application of electronic detonators, 3-D imagery, signature hole analysis, custom loading of blast holes. The blast was well

    Feb 1, 2020

  • ISEE
    Safer Blasting Using Electronic Detonators With Integrated Temperature Measuring Capabilities

    By G Mendoza, L Taddei, C Robertson

    It is a well-known industry fact that many mine sites around the globe experience blast holes that have elevated temperatures due to reactive ground, geochemical reactions, geomorphic reactions, sub l

    Jan 21, 2025

  • ISEE
    Keeping Airblasts Under Control

    By Jaak J. K Daemen, Clayton R. Morlock

    A study was performed to evaluate the predictability of airblast overpressures induces by production mine blasting. Thirty-seven production blasts were monitored using 3 blasting seismographs giving o

    Jan 1, 1983

  • ISEE
    Blasting a Diversion Tunnel through the Abutment of a "Meta-Stable" Dam

    By Jennifer Williams, Donald J. Berger

    Originally built between 1913 and 1916, the Ashton Dam & Hydroelectric Facility has experienced various seepage and piping incidents since completion. Ashton Dam is located within 15 miles (24 km) of

    Jan 1, 2014

  • ISEE
    A Delay Sequencing Blasting System

    By D O. Tan Sky

    This paper will describe the mechanisms involved in delay blasting and how they are applied with the use of D.S.B. It will examine the control of potential damage resulting from detonations, and show

    Jan 1, 1980

  • ISEE
    Preparation - The Key to a Good Legal Defense

    By G Alan Foster

    The presence of approximately 600,000 attorneys in the U.S.A. and the determination by the courts that blasting is considered an 'ultra hazardous' activity makes every practical blaster aware that at

    Jan 1, 1982

  • ISEE
    Structure Responses to a Confined Opening Cut Blast, Sumterville, FL

    By Jeff Senules, Oana Meins, Catherine Aimone-Martin, Scott Lanker, Brent Meins

    Global wall strains from 4 to 77 micro-strains were measured at three structures adjacent to a highly-confined Florida quarry blast when PPV amplitudes ranged up to 6.05 in/s. Increasing the peak zero

    Feb 1, 2020

  • ISEE
    Limestone Fragmentation Case Study Using Regular Rhythmic Timing

    By Tristan Worsey, Jhon Silva

    The paper discusses a limestone quarry case study that looks at change in fragmentation due to using different charge sequences when using the regular rhythmic timing method.

    Feb 1, 2020

  • ISEE
    Intrinsic Benefits of Presplitting - Relieving Gas Penetration in Addition to Lowering Blast Vibrations to Highwalls

    By J. P. Remi Proulx, Areli Rodriguez, Ruilin Yang

    Historically, presplitting has been considered effective in reducing the impact of blast vibrations on highwalls. However, it remains a debated topic: how significantly can it protect highwalls, and i

    Jan 21, 2025

  • ISEE
    Application of Rudimentary Signature Hole Analysis

    By Michael Laing

    Blasting regulation and restrictions are tougher today than ever before. When blasting in population centers, strict limitations are often placed on the environmental effects caused by blasting, more

    Jan 1, 2017

  • ISEE
    Blasting Optimization using 3D Photogrammetry in a South Brazilian Quarry

    By L. O. Souza, J. F. Gewher, M. P. Scussiatto, C. S. Mendonca, R. A. McClure, B. T. Kuckartz, J. Kloeckner

    Blasting is the most effective and economical tool available to fragment and move rock for most applications. If properly executed, it can improve down-stream operations such as loading, hauling and c

    Jan 1, 2013

  • ISEE
    Journal: 20th Annual Photo and Art Contest, Honorable Mention, "Basic Blasting Class at Missouri S&T Underground Blasting Lab"

    By Paul Worsey, Gillian Worsey

    Description of Project:The basic blasting class underground lab at the Missouri S&T experimental mine in Rolla, o., shows the students how to drill, set up, load, and shoot a shot underground. In this

    Jan 1, 2014

  • ISEE
    Occidental's Resorts 7 and 8 Blasting Design and Results

    By Thomas E. Ricketts

    Occidental Oil Shale, Inc. constructed two commercial-sized modified in situ (MIS) retorts, Retorts 7 and 8, at its Logan Wash Oil Shale Mine in February and April 1981, respectively. One of the prima

    Jan 1, 1984

  • ISEE
    A Holistic Approach to the Drill and Blast Process

    By Tom BoBo, Seth Gering, Jeff Loeb

    Presenting a D&B feedback loop built on a well-designed blast, proven fragmentation analysis and blast monitoring solutions, underpinned by technology that not only increases profit from every blast,

    Feb 1, 2020

  • ISEE
    Journal: 20th Annual Photo and Art Contest - Best of Show, "Pinkerton Tunnel Open Cut"

    By Michael Weaver, Dale Ramsey

    Description of Project: The National Gateway Clearance Initiative is an improvement program to achieve a minimum of 21 feet of vertical clearance along CSX Transportation Inc’s (CSX) rail corridor so

    Jan 1, 2014

  • ISEE
    Half-Way House - Controlled Demolition Group "Rocks the Casbah" with Tricky Special-Effects-Laden Blast

    By Jane Wright, Brent Blanchard

    Question: When it comes to demolition projects, what could be more demanding than asking a blaster to explosively demolish a stubby, heavily-reinforced concrete structure in the heart of a third-world

    Jan 1, 2002

  • ISEE
    Journal: 100 Years / US Department of Agriculture Farmers' Bulletin

    By Harry Thompson

    In using explosives to blast stumps from the ground in order to prepare it for farming, it is comparatively easy to place the charge under a stump having a semitaproot or a lateral system of rooting b

    Jan 1, 2015

  • ISEE
    How to Achieve 100% of Advance in Tunnel

    By Alan Diaz Butron, Eng. Thierry Bernard

    "In tunnel blasting the most challenging objective is definitively obtaining the maximum advanceassociated to a minimum overbreak. Achieving 100% of advance with no overbreak is the targetchallenge by

    Jan 1, 2017

  • ISEE
    MINIMIZING RISK IN URBAN QUARRIES (Two Case Studies)

    By James Goldberg, Sally Zadra, Wiliam Reisz

    Early recognition and risk assessment is critical to sustaining a safe and productive blasting operation. While every blasting environment holds inherent risk, highwall blasting in highly congested ar

    Jan 1, 2008