Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Cast Blasting: Design and Applications

    By Travis Watts, Chris Prater, G. T. Lineberry

    Moving overburden at minimal cost is becoming increasingly important to coal mining companies throughout the U.S. The coal market is currently doing well, with an average spot coal price for Central A

    Jan 1, 2006

  • ISEE
    Urban Tunneling for the MWRA's Boston Harbor Clean Up

    By Gordon C. Petersen, Gary A. Almeraris

    This paper describes the controlled blasting techniques required to mine a rock tunnel section of a main interceptor located in the Boston Metropolitan area. The 3m (10 ft) x 2.8m (9.25 ft) horseshoe

    Jan 1, 1991

  • ISEE
    Increasing Back Break Using High Speed Blasting Techniques

    By Terry L. Cook

    RAG Coal West, Inc., Belle Ayr Mine is located in the heart of Wyoming’s rich Powder River Basin coalfield. Belle Ayr utilizes an open pit, truck/shovel operation to strip the overburden off the 70’se

    Jan 1, 2004

  • ISEE
    Mine Closure For Public Safety While Creating Endangered Species Habitat

    By Dale Ramsey

    Located in the Chestnut Ridge Mountains of Southwestern Pennsylvania, the Casparis mine named for the founder Kenneth Casparis operated from 1916 until the early 1950. producing crushed stone for cons

    Jan 1, 2006

  • ISEE
    Using Artificial Intelligence and 3D Imaging to Provide Real-time Particle Size Analysis on Haul Trucks

    By Saeed Karimifard, Saman Nouranian, Shahram Tafazoli, Bahram Sameti, Frank Chu, Caitlin McKinnon, Tetiana Konstantynivska, Glen Turner

    We propose a particle size analysis solution for haul trucks that does not impact current operational workflows. Using artificial intelligence (AI) and 3D imaging technology, our solution reliably loc

    Feb 1, 2020

  • ISEE
    Factors Driving Continuous Blasting Improvement At The Lafarge Ravena Plant

    By David Lilly, Robert Ethier, David Bremer

    The Lafarge Ravena Cement Plant in Ravena, New York demonstrated continuous and extraordinary improvement in productivity during the past several years. The factors driving continuous improvement at t

    Jan 1, 2007

  • ISEE
    Prediction of Burden Velocity in Bench Blasting

    By Shih Wen Wang, Ronald R. Rollins

    A blast casting model is proposed to predict the burden velocity in bench blasting. This blast casting model is the first theoretical model that 1) explains the throwing procedures and mechanisms, 2)

    Jan 1, 1992

  • ISEE
    Debris Collection Efforts Following a Large-scale AN Detonation

    By P. E. Hoffman, Joshua Ph. D.

    The Institute of Makers of Explosives (IME) led a post-detonation debris collection project in conjunction with a large AN railcar detonation conducted by the Department of Homeland SecurityTransporta

    Jan 1, 2019

  • ISEE
    Pitfalls of Residential Blasting—Experiences of a Field Blaster

    By Chuck Kliche, Bill Clements

    This paper relates some of the experiences, good and bad, of blasting adjacent to residences of the primary author during his 15+ years of field blasting in the Northern Great Plains region. During th

    Jan 1, 2009

  • ISEE
    To React Or Not To React? – Tis’a Fuelish Question!

    By Michael Wieland

    Smoke/fume measurements from rapid transitory charge reactions are not wholly comparable with thermodynamic reaction code (TDRC) results, since quenched chemical reactions yield nonequilibrium concent

    Jan 1, 2012

  • ISEE
    RF Hazards to Electric Detonators – The New IME SLP-20

    By David Leidel, Beth Shimer, James Stuart

    Periodically, the Institute of Makers of Explosives Safety Library Publications are reviewed, edited and updated to reflect recent technical developments, new commercial explosive products and new reg

    Jan 1, 2012

  • ISEE
    OSM Blaster Training Modules for Western Coal Mines and Quarries

    By Cory Loukides, Cathy Aimone-Martin

    Blaster training manuals used by the Office of Surface Mining (OSM) and others are outdated and cumbersome. A new approach has been developed using Microsoft PowerPoint with a Visual Basic overlay to

    Jan 1, 2004

  • ISEE
    Monitoring While Drilling Production Blastholes: Applications in Surface Mining

    Several surface coal mining operations in North America are attempting to adapt microprocessor-based monitoring equipment as well as programmable logic controllers onto rotary blasthole drills, toward

    Jan 1, 1988

  • ISEE
    A non-toxic, safe and reliable non-primary-explosives detonator

    By Marco Antonio Falquete

    Conventional detonators and blasting caps make use, as igniters, of flame-shock-, andfriction-sensitive primary explosives, such as lead azide, lead styphnate, mercury fulminate, etc, most of them sev

    Jan 1, 2007

  • ISEE
    Engineering Investigation of the April 2011 Explosion at a Fireworks Storage Magazine in Oahu, HI

    By Zuhair Ibrahim, Dan Tillema, Ali Reza

    This paper details the investigation of a fatal explosion that occurred on April 8, 2011 at a magazine used to store fireworks in Waikele, HI. The fireworks had been confiscated by the Bureau of Immig

    Jan 1, 2014

  • ISEE
    Journal: 100 Years / Rock Drilling With Particular Reference to Open Cut Excavation and Submarine Rock Removal.

    By W. L. Saunders, Richard T. Dana

    The dynamites are graded according to the percentage of nitroglycerin that they contain. Thus a “40% powder” would be one in which the sticks, weighing one-half pound each, would include one-fifth of

    Jan 1, 2013

  • ISEE
    Investigation of ANFO’s Behavior under Various Conditions - Phase 1

    By E. Contestabile, B. von Rosen

    On August 5th, 1998, a tractor-trailer carrying approximately 18,000 kg of blasting explosives, struck a rock face on the side of the road near the town of Walden, Ontario. Eye-witness accounts of the

    Jan 1, 2001

  • ISEE
    On Board Excavator Dilution Detector

    By Benjamin Cebrian

    The new technology presented in this paper is a patented system that is installed on board excavators (backhoe or front shovel types). Several control points are set along ore/waste contacts and their

    Feb 1, 2020

  • ISEE
    An Analysis of Firing Time Scatter Effects on Vibration Simulations from Waveforms with Low and High Frequency Components

    By Randall M. Wheeler

    Many blasting companies are using simulated production ground vibration waveforms to aid them in the control of their vibration effects. The simulations are typically produced by using a seismograph t

    Jan 1, 1991

  • ISEE
    Airblast Reduction from Effective Blasthole Stemming

    By Duane Skidmore, Francis Otuonye, Calvin J. Konya

    Proper stemming not only affects the rock breakage process, but also controls the unwanted side effects of blasting such as airblast, ground vibration, and flyrock. Little research has been conducted

    Jan 1, 1982