Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Deep Soil Mixed Wall And Jet Grouting For An Excavation Support System At The Museum Of Fine Arts In Boston, Massachusetts
By Harry Schnabel
A 6200 m² cement deep soil mixed (CDSM) wall was constructed for an addition to the Museum of Fine Arts in Boston, Massachusetts. The addition was located along the east side of the existing museum wi
Jan 1, 2011
-
Urban Legends: Two Case Studies That Redefine "Impossible"
By Grant R. J. Bearss
Due to environmental concerns in urban construction, many typically simple projects become very complex or feasibly impossible. The introduction of relatively new concepts has redefined "impossible",
Jan 1, 2002
-
The Silver Spring Transit Center: Design And Construction Of Drilled Shafts In An Urban Environment
By James E. Parkes
The Silver Spring Transit Center is a new three-level transit center that will include bus loops for County, Metro and intercity buses, parking, and retail space. It replaces an existing bus station
Jan 1, 2011
-
Review Of The Methods Used To Construct Large Diameter Bored Piles For Top Down Construction
By J. D. Findlay
The demands on development in London in recent years has led to the increasing use of top down construction methods in which there is a requirement to place steel columns to high tolerances into large
Jan 1, 1989
-
The Alternate Technical Concept Process For Foundations At The New Mississippi River Bridge, St. Louis
By Dan A. Brown
The New Mississippi River Bridge (MRB) employed conventional design-bid-build procurement, but the bidding process included the opportunity for pre-qualified bidders to develop and propose confidentia
Jan 1, 2011
-
Contact Pressure Characteristics Beneath Deep Foundation Of Beijing International Hotel ? Synopsis
By X. L. Huang
This paper deals with the experimental and theoretic study of the contact pressure beneath the deep foundation of Beijing International Hotel, The experiments have been carried out in project and in m
Jan 1, 2010
-
Design And Construction Of Bored Piles And Diaphragm Wall For MHA Headquarters Complex, Singapore - Synopsis
By N. S. Yet
This paper shall present the design and construction of bored pile and diaphragm wall for the proposed MHA complex in Singapore. The work was carried out by L&M Foundation Specialist Pte Ltd and PWD C
Jan 1, 2000
-
Slope Stabilisation Of A Section Of The Thirlmere Aqueduct By The Use Of Spaced Micropiles And Permeation Grouting
By David Preece
The Thirlmere aqueduct was constructed over 110 years ago to provide water from the Lake District (in the north-west of England) to the city of Manchester some 60 miles (100 km) away. The aqueduct rem
Jan 1, 2011
-
Design Of Augered Cast In Place (ACIP) Piles - Introduction
By Michael McVay
The use of augered cast-in-place piles has seen tremendous growth under commerical structures in the past twenty years. Problems with vibration, soil densification and/or heave associated with driven
Jan 1, 1997
-
2 Recent Technological Developments In Deep Foundations Without Soil Excavation - Recent Technological Developments In Deep Foundations Without Soil Excavation - Brief Review Of Papers To Session 2
By Bengt H. Fellenius
Session 2, Deep Foundation without Soil Excavation, has attracted no fewer than 22 papers dealing with subjects from soil improvement by grouting, injection, and deep mixing techniques through vibrofl
Jan 1, 1994
-
A Need To Reevaluate Attitudes In Engineering And Construction
By d&apos, E. Appolonia
A construction project is successful when all parties contributing to it are winners. It is not a success when there are winners and losers. Contractors, engineers, suppliers and equipment developers
Jan 1, 1985
-
Driven Piles For New Pacific Northwest Baseball Park - Introduction
By Thomas M. Gurtowski
The New Pacific Northwest Baseball Park, now known as Safeco Field, is located directly south of the Kingdome in Seattle, Washington, and will be the new home of the Seattle Mariners baseball team. Th
Jan 1, 1998
-
Installation, Design, And Quality Control Of Augercast Piles ? Introduction
By William J. Neely
Augercast piles are formed by drilling a continuous-flight auger into the ground and, on reaching the required depth, sand-cement grout or concrete is pumped down the hollow stem as the auger is withd
Jan 1, 1990
-
Effects Of Mineral And Polymer Slurries On Drilled Shafts - 1. Introduction - 1.1 History Of And Principles Of Mineral Slurries In Drilled Shaft Construction
By Michael W. Neill, O&apos
Drilling slurry has become an effective aid to the construction of drilled shafts in caving and/or waterbearing soils. Historically, drilling slurry made of bentonitic clay and water was first used in
Jan 1, 1991
-
The Quality Control Of Pile Foundations Of Tall Buildings In Shenzhen
By Li Keqiang
Among the pile foundations of the 156 tall buildings over 18 storeys in Shenzhen, 86. 5% of them are constructed by slurry drilled piles, bored piles and excavated piles (hand-dug caissons). Based on
Jan 1, 1991
-
Examples Of The Use Of Temporary Works Soil Nailing In The UK And Ireland
By Martin J. Pedley
The use of soil nailing has grown steadily in the UK over the last 15 years and it has recently become more popular in the Republic of Ireland. This paper presents three soil nailing temporary works c
Jan 1, 2000
-
I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction - Program Development - Background - Collapse
By Darrell L. Beddard
The Loma Prieta earthquake occurred on October 17, 1989 at 5:04 PM, Pacific Daylight Time. It measured 7.1 in magnitude and was felt from Los Angeles north to the Oregon state line and east to western
Jan 1, 1996
-
25 Story Structure On River Flood Plain Soils Improved By Vibrocompaction And Compaction Grouting
By Frank Callanan
The Ameristar Casino expansion project included the design and construction of a 25-story hotel and 9-story parking structure expansion. The site is located in a floodplain on the banks of the Missour
Jan 1, 2009
-
Excavation Bracing Technology ? Synopsis
By G. F. Sowers
Excavation bracing is a special structural system. It is built from the top down. The design is controlled by the economical construction of another structure as well as by the movement of the ground
Jan 1, 2010
-
Experiences Of The Cast-In-Situ Pile Filling In Stone-Line Intercalation
By Guan Jichang
An abandened breakwater, located at the rear of No. 2 berth in Dongdu Port area of Xiamen City, was not cleaned thoroughly when the backfilling of sand started. The uncleaned stone layer was about 2 t
Jan 1, 1991